← Back
Two family converted from one family
481 PUTNAM AVENUE
BROOKLYN · BIN 3051752
💬 Discuss this project
1900Year Built
2.5Stories
B3Building Class
R6BZoning
3,599 sfGross Floor Area
2Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Two family converted from one family · 1,917 sf lot · 1.88 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire Protection
Floor 338p · 1 filing · 20 docs
Floor 238p · 1 filing · 20 docs
Floor 138p · 1 filing · 20 docs
Cellar50p · 1 filing · 20 docs
Basement39p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
A D GENERAL CONTRACTORS407/08/2026
481 PARTNERS LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/23/2024$3.4M—— → —$942/sf building
03/30/2022$950K—481 PARTNERS LLC → 481 PUTNAM AVE LLC$264/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.1005/09/2024
FL&M ENGINEERING DESIGN &INSPECTION105/01/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC2003/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WEBB DEVELOPMENT SVC CORPGeneral Contractor1003/22/2026
PROFF ELECTRICAL LLC 005283General Contractor203/22/2026
PACE PLUMBINGPlumbing203/22/2026
CONROY BLAKEElectrical203/21/2026
PROFF ELECTRICAL LLCElectrical203/22/2026
PACE PLUMBING CORPPlumbing107/08/2026
PACE PLUMBING CORPFire Protection107/08/2026
A & D GENERAL CONTR INCGeneral Contractor107/08/2026
CHRISTIAN LOZADAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.67811005/09/2024
Building Lifecycle
All (125)Filed (11)Permit Issued (6)Signed Off (3)Violation (37)Inspection (8)Objection (30)Special Inspection (30)
11/24/2025
Violation issued (HPD, open)
I
09/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/17/2024
Signed off — Alteration CO
FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH DOB NOW APPLICATION # B00588694-I1. TO RESOLVE ECB VIOLATION #35140264X. IN THE CELLAR, REMOVE AND CAP 1-OIL TANK AND BOILER.
B00588694-S2
06/17/2024
Signed off — Alteration CO
FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH DOB NOW APPLICATION # B00588694-I1. TO RESOLVE ECB VIOLATION #35140264X. IN THE CELLAR, REMOVE AND CAP 1-OIL TANK AND BOILER.
B00588694-S1
06/14/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/16/2024
Special inspection requirement — Final
CHRISTIAN LOZADA
05/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
05/16/2024
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
05/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
05/16/2024
Special inspection requirement — Shutoff dampers
CHRISTIAN LOZADA
05/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
05/16/2024
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
05/16/2024
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
05/16/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
05/16/2024
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
05/16/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
05/16/2024
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
05/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
05/16/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
05/16/2024
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
05/16/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
05/16/2024
Special inspection requirement — Post-installed Anchors
CHRISTIAN LOZADA
05/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
05/16/2024
Special inspection requirement — Subgrade Inspections
CHRISTIAN LOZADA
05/16/2024
Special inspection requirement — Heating Systems
CHRISTIAN LOZADA
05/16/2024
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
05/09/2024
Filed — Alteration CO
FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH DOB NOW APPLICATION # B00588694-I1. TO RESOLVE ECB VIOLATION #35140264X. IN THE CELLAR, REMOVE AND CAP 1-OIL TANK AND BOILER.
B00588694-P7
04/26/2024
Special inspection requirement — Post-installed Anchors
CHRISTIAN LOZADA
04/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
04/26/2024
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
04/26/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
04/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
04/26/2024
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
04/26/2024
Special inspection requirement — Heating Systems
CHRISTIAN LOZADA
04/26/2024
Special inspection requirement — Subgrade Inspections
CHRISTIAN LOZADA
04/26/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
04/11/2024
Violation issued (HPD, open)
A
01/10/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/08/2023
Permit issued — General Construction
B00588694-I1-GC-CX
11/21/2023
Violation issued (HPD, closed)
I
11/13/2023
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS,PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00867572-I1
08/14/2023
Objection resolved — Addressed
08/14/2023
Objection resolved — Addressed
08/14/2023
Objection resolved — Addressed
08/14/2023
Objection resolved — Addressed
08/14/2023
Objection resolved — Addressed
07/25/2023
Objection raised — Scope
07/25/2023
Objection raised — Fire_Protection
07/25/2023
Objection raised — Fire_Protection
07/25/2023
Objection raised — Scope
07/25/2023
Objection raised — Scope
07/17/2023
Filed — Alteration CO
FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH DOB NOW APPLICATION # B00588694-I1. TO RESOLVE ECB VIOLATION #35140264X. IN THE CELLAR, REMOVE AND CAP 1-OIL TANK AND BOILER.
B00588694-P6
06/22/2023
Objection resolved — Addressed
06/22/2023
Objection resolved — Addressed
06/21/2023
Objection raised — Structural
06/21/2023
Objection raised — Structural
06/20/2023
Filed — Alteration CO
FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH DOB NOW APPLICATION # B00588694-I1. TO RESOLVE ECB VIOLATION #35140264X. IN THE CELLAR, REMOVE AND CAP 1-OIL TANK AND BOILER.
B00588694-P4
06/20/2023
Filed — Alteration CO
FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH DOB NOW APPLICATION # B00588694-I1. TO RESOLVE ECB VIOLATION #35140264X. IN THE CELLAR, REMOVE AND CAP 1-OIL TANK AND BOILER.
B00588694-P5
06/20/2023
Objection raised — Scope
06/20/2023
Objection resolved — Addressed
Latest 60 of 125 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedWEBB DEVELOPMENT SVC CORP12/08/2023
DOB NOWSupported ScaffoldSigned-offA & D GENERAL CONTR INC05/02/2023
DOB NOWSprinklersSigned-offMANENGEERING BUREAU, INC04/11/2023
DOB NOWPlumbingSigned-offPACE PLUMBING CORP02/02/2023
DOB NOWMechanical SystemsPermit IssuedWEBB DEVELOPMENT SVC CORP12/10/2022
DOB NOWGeneral ConstructionPermit IssuedWEBB DEVELOPMENT SVC CORP05/11/2022
1 project · most recent 05/09/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/09/2024Permit IssuedWEBB DEVELOPMENT SVC CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric SUZ-KA24NA2 24,000 BTU · Condensing Unit ×4
MXZ-SM48NAMHZ 48,000 BTU · Condensing Unit ×3
MXZ-SM42NAMHZ 42,000 BTU · Condensing Unit ×1
SUZ-KA24NAHZ 24,000 BTU · Condensing Unit ×1
Ventilation
Hampton Bay 7114-01 50 CFM · Exhaust Fan ×15
Delta Breeze SMT150 150 CFM · Exhaust Fan ×6
1 project · most recent 05/09/2024
Sprinkler System
FiledStatusContractorScope
05/09/2024Signed-offMANENGEERING BUREAU, INCSprinkler System
1 project · most recent 05/09/2024
Gas Water/Sanitary
FiledStatusContractorScope
05/09/2024Signed-offPACE PLUMBING CORPGas, Water/Sanitary
1 project · most recent 04/15/2024
General Wiring
FiledStatusContractorScope
04/15/2024CompletePROFF ELECTRICAL LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/14/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/10/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/12/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/06/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/01/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/13/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 91
DateRequirementInspectorRole
05/16/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
05/16/2024Fenestration areasCHRISTIAN LOZADAenergy_progress
05/16/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
05/16/2024Interior lighting powerCHRISTIAN LOZADAenergy_progress
05/16/2024Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
05/16/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
05/16/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
05/16/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
05/16/2024Fenestration air leakageCHRISTIAN LOZADAenergy_progress
05/16/2024Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
05/16/2024Shutoff dampersCHRISTIAN LOZADAenergy_progress
05/16/2024FinalCHRISTIAN LOZADAprogress
05/16/2024Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
05/16/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
05/16/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
05/16/2024Subgrade InspectionsCHRISTIAN LOZADAspecial
05/16/2024Mechanical SystemsCHRISTIAN LOZADAspecial
05/16/2024Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
05/16/2024Heating SystemsCHRISTIAN LOZADAspecial
05/16/2024Concrete - Cast-In-PlaceCHRISTIAN LOZADAspecial
05/16/2024Post-installed AnchorsCHRISTIAN LOZADAspecial
04/26/2024Post-installed AnchorsCHRISTIAN LOZADAspecial
04/26/2024Concrete - Cast-In-PlaceCHRISTIAN LOZADAspecial
04/26/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
04/26/2024Heating SystemsCHRISTIAN LOZADAspecial
Latest 25 of 91.
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/27/2026B00867572-I1Request digital key ↗
08/27/2026B00588694-S1Request digital key ↗
08/27/2026B00588694-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00588694-I1Open ↗
▸Seals & Professional Certifications39
▸DOB NOWSpecial Inspector Seal & Signature15
09/01/2026B00588694-P5Open ↗
09/01/2026B00588694-S1Open ↗
08/31/2026B00588694-P3Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026B00588694-S1Open ↗
09/01/2026B00588694-S1Open ↗
08/31/2026B00588694-P3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026B00588694-S1Open ↗
08/27/2026B00588694-I1Open ↗
08/27/2026B00588694-P6Open ↗
Showing 3 of 11 on file for this type
▸Safety & Tenant Protection16
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist11
08/27/2026B00588694-S2Open ↗
08/27/2026B00588694-S1Open ↗
08/27/2026B00588694-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWStreet Tree Checklist4
08/27/2026B00588694-I1Open ↗
08/14/2026B00588694-P6Open ↗
08/14/2026B00588694-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00588694-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/27/2026B00588694-S1Open ↗
08/27/2026B00588694-I1Open ↗
08/27/2026B00588694-S2Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00588694-I1Open ↗
08/13/2026B00588694-S1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT4
08/27/2026B00588694-I1Open ↗
08/14/2026B00588694-P6Open ↗
08/14/2026B00588694-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00588694-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00588694-I1Open ↗
▸Other Documents13
▸DOB NOWDHCR Document8
08/27/2026B00588694-I1Open ↗
08/27/2026B00588694-I1Open ↗
08/14/2026B00588694-P6Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProperty Ownership Certification4
08/27/2026B00588694-I1Open ↗
08/14/2026B00588694-P6Open ↗
08/14/2026B00588694-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B00588694-I1Open ↗