← Back
Primarily 2 family with 1 store or office
4815 CHURCH AVENUE
BROOKLYN · East Flatbush-Rugby · BIN 3102053
💬 Discuss this project
1931Year Built
2Stories
S2Building Class
R5Zoning
2,750 sfGross Floor Area
3Units
Rent Stabilized24 Open Violations 22 unresolved · 2 paperwork only ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: CHURCH PLAZA INC · 2,417 sf lot · 1.14 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof5p · 2 filings · 11 docs
Floor 25p · 1 filing · 6 docs
Floor 15p · 1 filing · 6 docs
Cellar8p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Foster Construction804/09/2026
CHURCH PLAZA INC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JLA ARCHITECTURE PLLC101/08/2026
KING DAVID ARCHITECTURE PC811/19/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
4444 PPPP1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FOSTER EQUITIES LLCGeneral Contractor407/08/2026
H BRONNER & SON PLBG & HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JLA ARCHITECTURE PLLC9804401/08/2026
AG ENGINEERING PLLC8899210/03/2025
Building Lifecycle
All (82)Filed (9)Permit Issued (4)Signed Off (4)Violation (26)Inspection (7)Objection (16)Special Inspection (16)
02/23/2026
Signed off — Alteration
B01343668-I1
02/03/2026
Permit issued — General Construction
B01343668-I1-GC
01/08/2026
Filed — Alteration
B01343668-I1
01/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Joey Araman
01/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joey Araman
01/07/2026
Special inspection requirement — Final
Joey Araman
12/23/2025
Signed off — Alteration
Propose To provide General Construction Plans for 2 Story Mixed Use Building with Cellar . Plumbing plans to be Filed on Job# B01154815-S1 No change in use Egress or occupancy
B01154815-S1
11/26/2025
Signed off — Alteration
Propose To provide General Construction Plans for 2 Story Mixed Use Building with Cellar . Plumbing plans to be Filed on Job# B01154815-S1 No change in use Egress or occupancy
B01154815-I1
11/25/2025
Signed off — Alteration
Propose To provide General Construction Plans for 2 Story Mixed Use Building with Cellar . Plumbing plans to be Filed on Job# B01154815-S1 No change in use Egress or occupancy
B01154815-S2
11/25/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/20/2025
Permit issued — Mechanical Systems
B01154815-S2-MS
11/19/2025
Filed — Alteration
Propose To provide General Construction Plans for 2 Story Mixed Use Building with Cellar . Plumbing plans to be Filed on Job# B01154815-S1 No change in use Egress or occupancy
B01154815-P6
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/06/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/27/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/27/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/19/2025
Objection resolved — Addressed
10/16/2025
Special inspection requirement — Fenestration areas
Joey Araman
10/16/2025
Special inspection requirement — Fenestration air leakage
Joey Araman
10/16/2025
Special inspection requirement — Lighting in dwelling units
Joey Araman
10/16/2025
Special inspection requirement — Interior lighting power
Joey Araman
10/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joey Araman
10/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Joey Araman
10/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Joey Araman
10/15/2025
Objection resolved — Addressed
10/14/2025
Objection raised — Plumbing
10/13/2025
Objection resolved — Addressed
10/09/2025
Objection raised — Cost
10/08/2025
Objection raised — Scope
10/05/2025
Filed — Alteration
Propose To provide General Construction Plans for 2 Story Mixed Use Building with Cellar . Plumbing plans to be Filed on Job# B01154815-S1 No change in use Egress or occupancy
B01154815-S2
10/05/2025
Filed — Alteration
Propose To provide General Construction Plans for 2 Story Mixed Use Building with Cellar . Plumbing plans to be Filed on Job# B01154815-S1 No change in use Egress or occupancy
B01154815-P4
10/03/2025
Filed — Alteration
Propose To provide General Construction Plans for 2 Story Mixed Use Building with Cellar . Plumbing plans to be Filed on Job# B01154815-S1 No change in use Egress or occupancy
B01154815-P5
10/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
Joey Araman
10/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
Joey Araman
10/03/2025
Special inspection requirement — Maintenance information
Joey Araman
10/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Joey Araman
09/19/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/15/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/02/2025
Filed — Alteration
Propose To provide General Construction Plans for 2 Story Mixed Use Building with Cellar . Plumbing plans to be Filed on Job# B01154815-S1 No change in use Egress or occupancy
B01154815-P2
07/02/2025
Filed — Alteration
Propose To provide General Construction Plans for 2 Story Mixed Use Building with Cellar . Plumbing plans to be Filed on Job# B01154815-S1 No change in use Egress or occupancy
B01154815-P3
05/14/2025
Permit issued — Plumbing
B01154815-S1-PL
05/09/2025
Special inspection requirement — Final
Joey Araman
05/09/2025
Special inspection requirement — Mechanical Systems
Joey Araman
02/27/2025
Permit issued — General Construction
B01154815-I1-GC
01/15/2025
Objection resolved — Addressed
01/15/2025
Objection resolved — Addressed
01/15/2025
Objection resolved — Addressed
01/15/2025
Objection resolved — Addressed
01/15/2025
Objection resolved — Addressed
01/14/2025
Objection raised — Structural
01/14/2025
Objection raised — Fire_Protection
01/14/2025
Objection raised — Structural
01/14/2025
Objection raised — Structural
01/14/2025
Objection raised — Structural
01/12/2025
Filed — Alteration
Propose To provide General Construction Plans for 2 Story Mixed Use Building with Cellar . Plumbing plans to be Filed on Job# B01154815-S1 No change in use Egress or occupancy
B01154815-S1
01/12/2025
Filed — Alteration
Propose To provide General Construction Plans for 2 Story Mixed Use Building with Cellar . Plumbing plans to be Filed on Job# B01154815-S1 No change in use Egress or occupancy
B01154815-I1
08/21/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/28/2023
Violation issued (HPD, closed)
I
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFOSTER EQUITIES02/03/2026
DOB NOWMechanical SystemsSigned-offFOSTER EQUITIES11/20/2025
DOB NOWPlumbingSigned-offH BRONNER & SON PLBG & HT05/14/2025
DOB NOWGeneral ConstructionSigned-offFOSTER EQUITIES02/27/2025
BISMHISSUEDEMANUEL BROS. CONSTRUCTION CORP.09/11/1995
3 projects · most recent 03/30/2026
General Wiring
FiledStatusContractorScope
03/30/2026CompleteACCURATE ELEC'L CORP.General Wiring
03/19/2026CompleteACCURATE ELEC'L CORP.4 meters, 1 new_meters
12/22/2017CancelledWILLDAN ELECTRICAL OF NY—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
11/25/2025Pass-Final General Construction Non-Directive 14PassView ↗
11/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/06/2025Fail-Final General Construction Non-Directive 14FailView ↗
10/27/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/27/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/15/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
01/08/2026Structural Stability – Alterations of existing buildingsJoey Aramanspecial
01/08/2026Fire-Resistant Penetrations and JointsJoey Aramanspecial
01/07/2026FinalJoey Aramanprogress
10/16/2025Fenestration areasJoey Aramanenergy_progress
10/16/2025Fenestration air leakageJoey Aramanenergy_progress
10/16/2025Lighting in dwelling unitsJoey Aramanenergy_progress
10/16/2025Interior lighting powerJoey Aramanenergy_progress
10/16/2025Fire-Resistant Penetrations and JointsJoey Aramanspecial
10/16/2025Energy Code Compliance InspectionsJoey Aramanprogress
10/16/2025Fenestration and door U-factor and product ratingsJoey Aramanenergy_progress
10/03/2025HVAC-R and service water heating equipmentJoey Aramanenergy_progress
10/03/2025HVAC-R and service water heating system controlsJoey Aramanenergy_progress
10/03/2025Maintenance informationJoey Aramanenergy_progress
10/03/2025HVAC-R and service water piping design and insulationJoey Aramanenergy_progress
05/09/2025FinalJoey Aramanprogress
05/09/2025Mechanical SystemsJoey Aramanspecial
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026B01343668-I1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026B01154815-S2Open ↗
09/23/2026B01154815-S2Open ↗
08/29/2026B01343668-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B01154815-S2Open ↗
08/29/2026B01343668-I1Open ↗
08/29/2026B01343668-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/19/2026B01343668-I1Open ↗