← Back
Factory, special construction, fireproof
4825 BALDWIN STREET
BRONX · BIN 2101251
💬 Discuss this project
1958Year Built
1Stories
F2Building Class
M1-1Zoning
12,000 sfGross Floor Area
1Units
2 Open Violations ▸
Factory, special construction, fireproof · Owner of record: RLF III BALDWIN ST SPE, LLC · 60,480 sf lot · 0.2 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbing
Roof2p · 1 filing · 9 docs
Floor 13p · 1 filing · 9 docs
Mezzanine2p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BALDWINENDICOTT REALTY703/22/2026
REALTERM403/21/2026
FELIX CONTRACTING303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JT ENGINEERING, PC103/19/2025
AEP ENGINEERING, LLC203/18/2025
GREGORY RALPH, ARCHITECT103/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RPO803/21/2026
Building Lifecycle
All (50)Filed (4)Violation (6)Objection (10)Special Inspection (30)
04/16/2025
Objection resolved — Addressed
04/16/2025
Objection resolved — Addressed
04/08/2025
Objection resolved — Addressed
04/03/2025
Objection resolved — Addressed
03/26/2025
Objection resolved — Addressed
03/21/2025
Objection raised — Other
03/21/2025
Objection raised — Cost
03/21/2025
Objection raised — Admin
03/21/2025
Objection raised — Scope
03/21/2025
Objection raised — Scope
03/19/2025
Filed — Alteration
PROPOSED NEW PLUMBING FIXTURES INSTALLATION WITH ASSOCIATED PIPING AS PER PLANS. NO CHANGES IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
X01180171-S1
03/18/2025
Filed — Alteration
PROPOSED NEW PLUMBING FIXTURES INSTALLATION WITH ASSOCIATED PIPING AS PER PLANS. NO CHANGES IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
X01180171-S3
03/18/2025
Filed — Alteration
PROPOSED NEW PLUMBING FIXTURES INSTALLATION WITH ASSOCIATED PIPING AS PER PLANS. NO CHANGES IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
X01180171-I1
03/18/2025
Filed — Alteration
PROPOSED NEW PLUMBING FIXTURES INSTALLATION WITH ASSOCIATED PIPING AS PER PLANS. NO CHANGES IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
X01180171-S2
03/10/2025
Special inspection requirement — Demolition
03/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/07/2025
Special inspection requirement — Mechanical Systems
03/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/07/2025
Special inspection requirement — Energy Code Compliance Inspections
03/07/2025
Special inspection requirement — Final
03/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
03/07/2025
Special inspection requirement — Maintenance information
03/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
03/07/2025
Special inspection requirement — Ventilation and air distribution system
03/07/2025
Special inspection requirement — Shutoff dampers
03/07/2025
Special inspection requirement — Electrical motors and elevators
03/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
02/12/2025
Special inspection requirement — Lighting controls
02/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/12/2025
Special inspection requirement — Structural Steel - Details
02/12/2025
Special inspection requirement — Concrete - Cast-In-Place
02/12/2025
Special inspection requirement — Post-installed Anchors
02/12/2025
Special inspection requirement — Structural Steel - Welding
02/12/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
02/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/12/2025
Special inspection requirement — Final
02/12/2025
Special inspection requirement — Energy Code Compliance Inspections
02/12/2025
Special inspection requirement — Final
02/12/2025
Special inspection requirement — Fenestration air leakage
02/12/2025
Special inspection requirement — Fenestration areas
02/12/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
02/12/2025
Special inspection requirement — Air barrier — testing
02/12/2025
Special inspection requirement — Insulation placement and R values
02/12/2025
Special inspection requirement — Exterior lighting power
01/29/2020
Violation issued (ECB, closed)
Construction
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/1994
Violation issued (ECB, closed)
Construction
06/09/1994
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/17/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/15/1991
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDDOMFER CORP03/10/2004
BISOTISSUEDDOMFER CORP03/10/2004
BISPLISSUEDQUEENS, THE MECHANICAL CORP.02/15/2002
BISOTISSUEDV.C. CONSTRUCTION CO OF QUEENS I02/12/2002
BISPLISSUEDDEPT OF BLDGS, CHIEF PLBG INSPEC01/26/1999
BIS—ISSUEDFELIX RECYCLING INC11/19/1998
BISPLISSUEDSENID PLUMBING & HTING CORP06/01/1992
BIS—ISSUEDUNIVERSAL MILLWRIGHT CO. INC.03/24/1992
BISPLISSUEDRO-SAL PLUMBING & HTG INC INC.01/30/1990
BISMHISSUEDZODIAC INDUSTRIES, INC.01/09/1990
1 project · most recent 03/19/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/19/2025——Heating and Air Conditioning Systems
Heat / Cool
— YSC060G4RHB 5 tons · Condensing Unit ×1
1 project · most recent 03/19/2025
Gas Water/Sanitary
FiledStatusContractorScope
03/19/2025——Gas, Water/Sanitary
1 project · most recent 03/19/2025
Steel Concrete
FiledStatusContractorScope
03/19/2025——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
03/10/2025Demolition—special
03/07/2025Fire-Resistant Penetrations and Joints—special
03/07/2025Mechanical Systems—special
03/07/2025Fire-Resistant Penetrations and Joints—special
03/07/2025Energy Code Compliance Inspections—progress
03/07/2025Final—progress
03/07/2025HVAC-R and service water piping design and insulation—energy_progress
03/07/2025Maintenance information—energy_progress
03/07/2025HVAC-R and service water heating system controls—energy_progress
03/07/2025Ventilation and air distribution system—energy_progress
03/07/2025Shutoff dampers—energy_progress
03/07/2025Electrical motors and elevators—energy_progress
03/07/2025HVAC-R and service water heating equipment—energy_progress
02/12/2025Lighting controls—energy_progress
02/12/2025Fire-Resistant Penetrations and Joints—special
02/12/2025Structural Steel - Details—special
02/12/2025Concrete - Cast-In-Place—special
02/12/2025Post-installed Anchors—special
02/12/2025Structural Steel - Welding—special
02/12/2025Subsurface Conditions – Fill Placement & In-Place Density—special
02/12/2025Structural Stability – Alterations of existing buildings—special
02/12/2025Final—progress
02/12/2025Energy Code Compliance Inspections—progress
02/12/2025Final—progress
02/12/2025Fenestration air leakage—energy_progress
Latest 25 of 33.
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/19/2026X01180171-I1Request digital key ↗
08/19/2026X01180171-S3Request digital key ↗
08/19/2026X01180171-S2Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026X01180171-S1Open ↗
08/13/2026X01180171-S2Open ↗
08/13/2026X01180171-S3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026X01180171-I1Open ↗