RoofUnder Construction26p · 4 filings · 20 docs
ArchitectureEquipmentMechanical
Issued Permit Scope
General Construction · Supported Scaffold
suspended scaffold installation
On file for this project
15 documents · 2 drawing sheets
REPLACE EXISTING FIRST FLOOR LOBBY AND MAIL ROOM HVAC SYSTEM. 2. PROVIDE VENTILATION SYSTEM FOR 2nd FLOOR BATHROOM AND STORAGE ROOMS. 3. PROVIDE ALL EQUIPMENT, DUCTWORK, AIR TERMINAL DEVICES AND CONTROLS.
On file for this project
15 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 201 filing · 15 docs
Issued Permit Scope
Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents
Floor 191 filing · 15 docs
Issued Permit Scope
Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents
Floor 18Under Construction24p · 2 filings · 20 docs
ArchitectureDMMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
REPLACE EXISTING FIRST FLOOR LOBBY AND MAIL ROOM HVAC SYSTEM. 2. PROVIDE VENTILATION SYSTEM FOR 2nd FLOOR BATHROOM AND STORAGE ROOMS. 3. PROVIDE ALL EQUIPMENT, DUCTWORK, AIR TERMINAL DEVICES AND CONTROLS.
On file for this project
15 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents
Floor 17Under Construction24p · 2 filings · 20 docs
ArchitectureDMMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
REPLACE EXISTING FIRST FLOOR LOBBY AND MAIL ROOM HVAC SYSTEM. 2. PROVIDE VENTILATION SYSTEM FOR 2nd FLOOR BATHROOM AND STORAGE ROOMS. 3. PROVIDE ALL EQUIPMENT, DUCTWORK, AIR TERMINAL DEVICES AND CONTROLS.
On file for this project
15 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents
Floor 16Under Construction24p · 2 filings · 20 docs
ArchitectureDMMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
REPLACE EXISTING FIRST FLOOR LOBBY AND MAIL ROOM HVAC SYSTEM. 2. PROVIDE VENTILATION SYSTEM FOR 2nd FLOOR BATHROOM AND STORAGE ROOMS. 3. PROVIDE ALL EQUIPMENT, DUCTWORK, AIR TERMINAL DEVICES AND CONTROLS.
On file for this project
15 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents
Floor 15Under Construction24p · 2 filings · 20 docs
ArchitectureDMMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
REPLACE EXISTING FIRST FLOOR LOBBY AND MAIL ROOM HVAC SYSTEM. 2. PROVIDE VENTILATION SYSTEM FOR 2nd FLOOR BATHROOM AND STORAGE ROOMS. 3. PROVIDE ALL EQUIPMENT, DUCTWORK, AIR TERMINAL DEVICES AND CONTROLS.
On file for this project
15 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents
Floor 14Under Construction24p · 2 filings · 20 docs
ArchitectureDMMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
REPLACE EXISTING FIRST FLOOR LOBBY AND MAIL ROOM HVAC SYSTEM. 2. PROVIDE VENTILATION SYSTEM FOR 2nd FLOOR BATHROOM AND STORAGE ROOMS. 3. PROVIDE ALL EQUIPMENT, DUCTWORK, AIR TERMINAL DEVICES AND CONTROLS.
On file for this project
15 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents
Floor 13Under Construction24p · 2 filings · 20 docs
ArchitectureDMMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
REPLACE EXISTING FIRST FLOOR LOBBY AND MAIL ROOM HVAC SYSTEM. 2. PROVIDE VENTILATION SYSTEM FOR 2nd FLOOR BATHROOM AND STORAGE ROOMS. 3. PROVIDE ALL EQUIPMENT, DUCTWORK, AIR TERMINAL DEVICES AND CONTROLS.
On file for this project
15 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents
Floor 12Under Construction24p · 2 filings · 20 docs
ArchitectureDMMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
REPLACE EXISTING FIRST FLOOR LOBBY AND MAIL ROOM HVAC SYSTEM. 2. PROVIDE VENTILATION SYSTEM FOR 2nd FLOOR BATHROOM AND STORAGE ROOMS. 3. PROVIDE ALL EQUIPMENT, DUCTWORK, AIR TERMINAL DEVICES AND CONTROLS.
On file for this project
15 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents
Floor 11Under Construction24p · 2 filings · 20 docs
ArchitectureDMMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
REPLACE EXISTING FIRST FLOOR LOBBY AND MAIL ROOM HVAC SYSTEM. 2. PROVIDE VENTILATION SYSTEM FOR 2nd FLOOR BATHROOM AND STORAGE ROOMS. 3. PROVIDE ALL EQUIPMENT, DUCTWORK, AIR TERMINAL DEVICES AND CONTROLS.
On file for this project
15 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents
Floor 10Under Construction24p · 2 filings · 20 docs
ArchitectureDMMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
REPLACE EXISTING FIRST FLOOR LOBBY AND MAIL ROOM HVAC SYSTEM. 2. PROVIDE VENTILATION SYSTEM FOR 2nd FLOOR BATHROOM AND STORAGE ROOMS. 3. PROVIDE ALL EQUIPMENT, DUCTWORK, AIR TERMINAL DEVICES AND CONTROLS.
On file for this project
15 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents
Floor 9Under Construction24p · 2 filings · 20 docs
ArchitectureDMMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
REPLACE EXISTING FIRST FLOOR LOBBY AND MAIL ROOM HVAC SYSTEM. 2. PROVIDE VENTILATION SYSTEM FOR 2nd FLOOR BATHROOM AND STORAGE ROOMS. 3. PROVIDE ALL EQUIPMENT, DUCTWORK, AIR TERMINAL DEVICES AND CONTROLS.
On file for this project
15 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents
Floor 8Under Construction24p · 2 filings · 20 docs
ArchitectureDMMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
REPLACE EXISTING FIRST FLOOR LOBBY AND MAIL ROOM HVAC SYSTEM. 2. PROVIDE VENTILATION SYSTEM FOR 2nd FLOOR BATHROOM AND STORAGE ROOMS. 3. PROVIDE ALL EQUIPMENT, DUCTWORK, AIR TERMINAL DEVICES AND CONTROLS.
On file for this project
15 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents
Floor 7Under Construction24p · 2 filings · 20 docs
ArchitectureDMMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
REPLACE EXISTING FIRST FLOOR LOBBY AND MAIL ROOM HVAC SYSTEM. 2. PROVIDE VENTILATION SYSTEM FOR 2nd FLOOR BATHROOM AND STORAGE ROOMS. 3. PROVIDE ALL EQUIPMENT, DUCTWORK, AIR TERMINAL DEVICES AND CONTROLS.
On file for this project
15 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents
Floor 6Under Construction23p · 2 filings · 20 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
REPLACE EXISTING FIRST FLOOR LOBBY AND MAIL ROOM HVAC SYSTEM. 2. PROVIDE VENTILATION SYSTEM FOR 2nd FLOOR BATHROOM AND STORAGE ROOMS. 3. PROVIDE ALL EQUIPMENT, DUCTWORK, AIR TERMINAL DEVICES AND CONTROLS.
On file for this project
15 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents
Floor 5Under Construction23p · 2 filings · 20 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
REPLACE EXISTING FIRST FLOOR LOBBY AND MAIL ROOM HVAC SYSTEM. 2. PROVIDE VENTILATION SYSTEM FOR 2nd FLOOR BATHROOM AND STORAGE ROOMS. 3. PROVIDE ALL EQUIPMENT, DUCTWORK, AIR TERMINAL DEVICES AND CONTROLS.
On file for this project
15 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents
Floor 4Under Construction23p · 2 filings · 20 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
REPLACE EXISTING FIRST FLOOR LOBBY AND MAIL ROOM HVAC SYSTEM. 2. PROVIDE VENTILATION SYSTEM FOR 2nd FLOOR BATHROOM AND STORAGE ROOMS. 3. PROVIDE ALL EQUIPMENT, DUCTWORK, AIR TERMINAL DEVICES AND CONTROLS.
On file for this project
15 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents
Floor 3Under Construction23p · 2 filings · 20 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
REPLACE EXISTING FIRST FLOOR LOBBY AND MAIL ROOM HVAC SYSTEM. 2. PROVIDE VENTILATION SYSTEM FOR 2nd FLOOR BATHROOM AND STORAGE ROOMS. 3. PROVIDE ALL EQUIPMENT, DUCTWORK, AIR TERMINAL DEVICES AND CONTROLS.
On file for this project
15 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents
Floor 2Under Construction27p · 2 filings · 20 docs
ArchitectureDMMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
REPLACE EXISTING FIRST FLOOR LOBBY AND MAIL ROOM HVAC SYSTEM. 2. PROVIDE VENTILATION SYSTEM FOR 2nd FLOOR BATHROOM AND STORAGE ROOMS. 3. PROVIDE ALL EQUIPMENT, DUCTWORK, AIR TERMINAL DEVICES AND CONTROLS.
On file for this project
15 documents · 4 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents
Floor 1Under Construction23p · 5 filings · 20 docs
ArchitectureMechanical
Issued Permit Scope
Construction Fence · General Construction · Mechanical Systems · Supported Scaffold
Project M01457783Permit Issued · 09/29/2026
installation of the litchen exhaust system with makeup air. The duct modification. The four existing units are reused, but these units have no certification (Equipment use permit). Thus we will describes units as new to receive the Equipment use permit
This application is to remove existing ceiling tiles and non bearing partition walls and wall finishes to verify the siteconditions
On file for this project
6 documents
INSTALLATION OF CONSTRUCTION FENCE DURING EXISTING BUILDING RENNOVATION CONSTRUCTION, FILED SEPARATELY. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Latest 3 of 5 filings on this floor.
Cellar2p · 1 filing · 4 docs
ArchitectureOther
No filed description on record for this project.
On file for this project
4 documents · 2 drawing sheets