Rent Stabilized3 Open Violations 2 unresolved · 1 paperwork only▸
HPD05/05/2026(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
DOB03/04/2022STRUCTURE RENDERED NON-COMPLAINT. AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO CELLAR & 1ST FLOOR APT 1F DUE TO FIRE.
ECB09/12/2007EXIT PASSAGEWAY CORRIDOR OBSTRUCTED. NOTE:IN HALLWAY BY TOP OF STAIRS OF 2ND FL A REFRIGERATOR IS BEING STORED.THE PRESENCE OF THIS HALLWAY OBSTRUCTION DECREASES THE PASSAGEWAY FOR 2ND AND 3 STORY TENNANTSNothing owed — awaiting certificate of correction
Five to six families · 2,000 sf lot · 1.56 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.