Office with commercial, 1-6 stories
486 FLUSHING AVENUE
BROOKLYN · BIN 3429276
💬 Discuss this project
2024Year Built
—Stories
O5Building Class
M1-2Zoning
17,638 sfGross Floor Area
2Units
19 Open Violations 14 unresolved · 5 paperwork only ▸FDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: 486 FLUSHING REALTY LLC · 4,175 sf lot · 4.22 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction132p · 2 filings · 20 docs
Floor 6Under Construction1 filing · 6 docs
Floor 5Under Construction67p · 2 filings · 20 docs
Floor 4Under Construction150p · 2 filings · 20 docs
Floor 3Under Construction150p · 2 filings · 20 docs
Floor 2Under Construction152p · 2 filings · 20 docs
Floor 1Under Construction149p · 2 filings · 20 docs
MezzanineUnder Construction71p · 1 filing · 20 docs
CellarUnder Construction148p · 1 filing · 20 docs
1 job · most recent 08/11/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/11/2026Permit IssuedBH BUILDING INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NAM2 50,000 BTU · Heat Pump Outdoor ×3
MXZ-SM60NAM2 60,000 BTU · Heat Pump Outdoor ×3
PUHY-P144TNU-A 160,000 BTU · Vrf Outdoor ×1
Trane TWA120 10 tons · Ahu ×2
Aaon CFA-015-B-A-2-DAOEL 179,400 BTU ×1
1 job · most recent 08/11/2026
Sprinkler System
FiledStatusContractorScope
08/11/2026Permit IssuedARCO PLBG AND HTG INCSprinkler System
1 job · most recent 08/11/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/11/2026Permit IssuedPIPE SOLUTIONS ADVIS INCGas, Storm, Water/Sanitary
3 jobs · most recent 05/06/2026
General Wiring
FiledStatusContractorScope
05/06/2026Permit IssuedABZ ELECTRIC INC—
02/05/2026Permit IssuedSOLAS ELECTRICAL CORP—
02/04/2026Permit IssuedM.R. ELEC'L SERVICE LLCGeneral Wiring
1 job · most recent 08/11/2026
Steel Concrete
FiledStatusContractorScope
08/11/2026Permit IssuedBH BUILDING INCSteel, Concrete
2 jobs · most recent 02/10/2026
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
02/10/2026Permit IssuedCONSOLIDATED SCAFFOLDINGScaffold, Sidewalk Shed
01/25/2022——Fence
1 job · most recent 08/11/2026
Earthwork
FiledStatusContractorScope
08/11/2026Permit IssuedBH BUILDING INCEarthwork
1 job · most recent 05/26/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
05/26/2026Permit IssuedDORIA SCAFFOLDING LLCSuspended Scaffold (SC)
Building Lifecycle
All (180)Filed (23)Permit Issued (32)Violation (22)Inspection (14)Objection (59)Special Inspection (30)
09/07/2026
Objection resolved — Open
08/20/2026
Objection raised — Other
08/11/2026
Filed — New Building
MECHANICAL APPLICATION FILED HEREWITH IN CONJUCTION TO NB APPLICATION # B08013472-I1
B08013472-P8
08/11/2026
Objection raised — Other
08/11/2026
Special inspection requirement — Maintenance information
Paul Raymond
08/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
Paul Raymond
08/11/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Paul Raymond
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
08/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
Paul Raymond
08/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
08/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Raymond
07/27/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/27/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/24/2026
Filed — No Work
B01434840-I1
07/16/2026
Filed — New Building
MECHANICAL APPLICATION FILED HEREWITH IN CONJUCTION TO NB APPLICATION # B08013472-I1
B08013472-P7
07/07/2026
Permit issued — Supported Scaffold
B01352986-I1-SH
07/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/17/2026
Permit issued — Mechanical Systems
B08013472-S5-MS
06/17/2026
Violation issued (ECB, open)
Construction
06/17/2026
Violation issued (ECB, open)
Construction
06/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/04/2026
Special inspection requirement — Structural Steel - High Strength Bolting
06/04/2026
Special inspection requirement — Final
Paul Raymond
06/04/2026
Special inspection requirement — Structural Steel - Welding
06/04/2026
Special inspection requirement — Structural Steel - Details
Paul Raymond
06/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/02/2026
Filed — New Building
MECHANICAL APPLICATION FILED HEREWITH IN CONJUCTION TO NB APPLICATION # B08013472-I1
B08013472-P5
06/02/2026
Special inspection requirement — Structural Steel - Welding
06/02/2026
Special inspection requirement — Structural Steel - High Strength Bolting
05/26/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
B01407050-I1
05/26/2026
Permit issued — Suspended Scaffold
B01407050-I1-SC
05/21/2026
Violation issued (ECB, open)
Unknown
05/21/2026
Violation issued (ECB, open)
Site Safety
05/21/2026
Violation issued (ECB, open)
Construction
05/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/20/2026
Special inspection requirement — Final
Paul Raymond
05/20/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
05/20/2026
Special inspection requirement — Footing and Foundation
Paul Raymond
05/20/2026
Special inspection requirement — Footing and Foundation
Paul Raymond
05/20/2026
Special inspection requirement — Subgrade Inspections
Paul Raymond
05/20/2026
Special inspection requirement — Final
Paul Raymond
05/20/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Paul Raymond
05/20/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Paul Raymond
05/20/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SOORJBALLY HARILALL
05/20/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SOORJBALLY HARILALL
05/20/2026
Special inspection requirement — Concrete - Cast-In-Place
Paul Raymond
05/20/2026
Special inspection requirement — Subgrade Inspections
Paul Raymond
05/20/2026
Special inspection requirement — Underpinning
Paul Raymond
05/14/2026
Filed — New Building
MECHANICAL APPLICATION FILED HEREWITH IN CONJUCTION TO NB APPLICATION # B08013472-I1
B08013472-P4
05/14/2026
Filed — New Building
MECHANICAL APPLICATION FILED HEREWITH IN CONJUCTION TO NB APPLICATION # B08013472-I1
B08013472-P6
05/13/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Paul Raymond
05/13/2026
Special inspection requirement — Subgrade Inspections
Paul Raymond
05/13/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SOORJBALLY HARILALL
05/08/2026
Violation issued (ECB, open)
Construction
05/08/2026
Violation issued (ECB, open)
Construction
05/08/2026
Violation issued (ECB, open)
Construction
05/08/2026
Violation issued (ECB, open)
Construction
05/08/2026
Violation issued (ECB, open)
Construction
05/08/2026
Violation issued (ECB, open)
Construction
05/08/2026
Violation issued (ECB, open)
Construction
Latest 60 of 180 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CONSOLIDATED SCAFFOLDING INC.1007/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/01/2021$1.2M—490 FLUSHING AVENUE LLC → 486 FLUSHING AVENUE LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADVANCED ENGINEERING & INSPECT. PLL408/11/2026
NIKOLAI KATZ ARCHITECT507/24/2026
R & O ENGINEERING806/02/2026
SKYLINE RIGGING105/26/2026
PAUL G. JONES, P.E.302/10/2026
ARYEH SIEGEL ARCHITECT110/07/2022
ALBERTO ROMAN101/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)1503/21/2026
AVALON DESIGNS203/21/2026
XPDITE GROUP 103603/21/2026
XPDITE GROUP LLC 104303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BH BUILDING INCGeneral Contractor3107/08/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor607/09/2026
JHZ CONSULTING SERVICES *General Contractor504/09/2026
N TECH DESIGN OF AMERICAGeneral Contractor303/21/2026
DORIA SCAFFOLDING LLCGeneral Contractor107/08/2026
ARCO PLBG AND HTG INCFire Protection107/08/2026
PIPE SOLUTIONS ADVIS INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.3941608/11/2026
SKYLINE RIGGING7880105/26/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedCONSOLIDATED SCAFFOLDING07/07/2026
DOB NOWMechanical SystemsPermit IssuedBH BUILDING INC06/17/2026
DOB NOWSuspended ScaffoldPermit IssuedDORIA SCAFFOLDING LLC05/26/2026
DOB NOWSupported ScaffoldPermit IssuedCONSOLIDATED SCAFFOLDING04/28/2026
DOB NOWSprinklersPermit IssuedARCO PLBG AND HTG INC03/30/2026
DOB NOWPlumbingPermit IssuedPIPE SOLUTIONS ADVIS INC02/18/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCONSOLIDATED SCAFFOLDING02/11/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCONSOLIDATED SCAFFOLDING02/11/2026
DOB NOWSupported ScaffoldPermit IssuedCONSOLIDATED SCAFFOLDING02/05/2026
DOB NOWSupported ScaffoldPermit IssuedCONSOLIDATED SCAFFOLDING02/05/2026
DOB NOWGeneral ConstructionPermit IssuedBH BUILDING INC01/07/2026
DOB NOWConstruction FencePermit IssuedBH BUILDING INC12/29/2025
DOB NOWSupport of ExcavationPermit IssuedBH BUILDING INC12/23/2025
DOB NOWStructuralPermit IssuedBH BUILDING INC12/23/2025
DOB NOWFoundationPermit IssuedBH BUILDING INC12/23/2025
DOB NOWFoundationPermit IssuedBH BUILDING INC12/23/2025
DOB NOWFoundationPermit IssuedJHZ CONSULTING SERVICES *09/03/2025
DOB NOWStructuralPermit IssuedJHZ CONSULTING SERVICES *09/03/2025
DOB NOWEarth WorkPermit IssuedJHZ CONSULTING SERVICES *09/03/2025
DOB NOWSupport of ExcavationPermit IssuedJHZ CONSULTING SERVICES *09/03/2025
DOB NOWConstruction FencePermit IssuedJHZ CONSULTING SERVICES *09/03/2025
DOB NOWConstruction FencePermit IssuedBH BUILDING INC05/02/2025
DOB NOWFoundationPermit IssuedBH BUILDING INC05/02/2025
DOB NOWSupport of ExcavationPermit IssuedBH BUILDING INC05/02/2025
DOB NOWEarth WorkPermit IssuedBH BUILDING INC05/02/2025
DOB NOWStructuralPermit IssuedBH BUILDING INC05/02/2025
DOB NOWStructuralPermit IssuedBH BUILDING INC08/09/2024
DOB NOWFoundationPermit IssuedBH BUILDING INC08/07/2024
DOB NOWEarth WorkPermit IssuedBH BUILDING INC08/06/2024
DOB NOWSupport of ExcavationPermit IssuedBH BUILDING INC08/02/2024
DOB NOWConstruction FencePermit IssuedBH BUILDING INC06/17/2024
DOB NOWConstruction FencePermit IssuedN TECH DESIGN OF AMERICA02/16/2024
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
07/27/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/27/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/31/2026Pass-Final PL - UndergroundPassView ↗
03/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/05/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/30/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/08/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/25/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/22/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 118
DateRequirementInspectorRole
08/11/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
08/11/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
08/11/2026Maintenance informationPaul Raymondenergy_progress
08/11/2026HVAC-R and service water piping design and insulationPaul Raymondenergy_progress
08/11/2026HVAC-R and service water heating equipmentPaul Raymondenergy_progress
08/11/2026HVAC-R and service water heating system controlsPaul Raymondenergy_progress
08/11/2026Energy Code Compliance InspectionsPaul Raymondprogress
06/04/2026Structural Steel - Welding—special
06/04/2026Structural Steel - High Strength Bolting—special
06/04/2026FinalPaul Raymondprogress
06/04/2026Structural Steel - DetailsPaul Raymondspecial
06/02/2026Structural Steel - High Strength Bolting—special
06/02/2026Structural Steel - Welding—special
05/20/2026Concrete - Cast-In-PlacePaul Raymondspecial
05/20/2026Subgrade InspectionsPaul Raymondspecial
05/20/2026Subsurface Conditions – Fill Placement & In-Place DensityPaul Raymondspecial
05/20/2026Subsurface Investigations (Borings/Test Pits)SOORJBALLY HARILALLspecial
05/20/2026Structural Stability – Alterations of existing buildings—special
05/20/2026Construction Operations Influencing Adjacent Structures—special
05/20/2026FinalPaul Raymondprogress
05/20/2026Footing and FoundationPaul Raymondprogress
05/20/2026Subgrade InspectionsPaul Raymondspecial
05/20/2026UnderpinningPaul Raymondspecial
05/20/2026Subsurface Investigations (Borings/Test Pits)SOORJBALLY HARILALLspecial
05/20/2026Subsurface Conditions – Fill Placement & In-Place DensityPaul Raymondspecial
Latest 25 of 118.
▾Documents — 201 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch23
08/31/2026B00659497-I1Request digital key ↗
08/28/2026B08014156-I1Request digital key ↗
08/25/2026B08013472-P9Request digital key ↗
Showing 3 of 23 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/16/2026B01434840-I1Request digital key ↗
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
05/14/2024340909039Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
05/14/2024340909039Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram6
08/15/2026B08013472-P3Open ↗
08/15/2026B08013472-P7Open ↗
08/14/2026B08013472-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/15/2026B08013472-P7Open ↗
08/13/2026B08013472-P3Open ↗
08/13/2026B08013472-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026B08013472-I1Open ↗
▸Seals & Professional Certifications127
▸DOB NOWProgress Inspector Seal & Signature64
09/25/2026B08013472-P3Open ↗
09/25/2026B08013472-P3Open ↗
09/25/2026B08013472-P3Open ↗
Showing 3 of 64 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature38
09/25/2026B08013472-P3Open ↗
09/15/2026B08013472-S6Open ↗
09/15/2026B08013472-S6Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/31/2026B00659497-I1Open ↗
08/28/2026B08014156-I1Open ↗
08/25/2026B08013472-P9Open ↗
Showing 3 of 24 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/14/2024340909039Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B08013472-I1Open ↗
08/13/2026B08013472-P3Open ↗
08/13/2026B08013472-P1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist4
08/15/2026B08013472-P3Open ↗
08/15/2026B08013472-P7Open ↗
08/14/2026B08013472-P1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
05/14/2024340909039Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B08013472-I1Open ↗
▸Inspections & Test Reports9
▸DOB NOWSOIL REPORT6
08/16/2026B08013472-P6Open ↗
08/13/2026B08013472-P2Open ↗
08/13/2026B08013472-S7Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram3
08/13/2026B08013472-S2Open ↗
08/13/2026B08013472-S7Open ↗
08/13/2026B08013472-S1Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
05/14/2024340909039Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/14/2024340909039Open ↗
▸Other Documents17
▸DOB NOWProperty Ownership Certification4
08/15/2026B08013472-P3Open ↗
08/15/2026B08013472-P7Open ↗
08/14/2026B08013472-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/15/2026B08013472-P7Open ↗
08/13/2026B08013472-P1Open ↗
08/13/2026B08013472-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/15/2026B08013472-P7Open ↗
08/13/2026B08013472-I1Open ↗
08/13/2026B08013472-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026B08013472-S1Open ↗
08/13/2026B08013472-S2Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
05/14/2024340909039Open ↗
▸DOB NOWCalculations1
08/16/2026B01407050-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026B01407050-I1Open ↗