💬 Discuss this project
1897Year Built
2Stories
C0Building Class
R6BZoning
2,870 sfGross Floor Area
3Units
Three families · 2,050 sf lot · 1.4 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Demolition and repair work1 filing · 13 docs
Floor 1Demolition and repair work1 filing · 13 docs
Sub-BasementDemolition and repair work1 filing · 13 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/07/2020$4.2M—CARRIAGE HOUSE 396, LLC → Private party$1,477/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Five Phase Engineering206/23/2026
Elizabeth Roberts Architecture & de103/27/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Village Electl ContractorsElectrical103/22/2026
Building Lifecycle
All (31)Filed (3)Objection (15)Special Inspection (13)
07/23/2026
Objection resolved — Resolved
07/23/2026
Objection resolved — Resolved
07/23/2026
Objection resolved — Resolved
07/16/2026
Objection raised — Other
07/16/2026
Objection raised — Other
07/16/2026
Objection raised — Other
07/07/2026
Objection raised — Scope
06/23/2026
Filed — Alteration
FILING HEREWITH EXTERIOR RENOVATIONS AS PER PLANS. NEW EXTERIOR DECK, GLAZING, MASONRY WALL, ETC. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01377991-S1
06/23/2026
Filed — Alteration
FILING HEREWITH EXTERIOR RENOVATIONS AS PER PLANS. NEW EXTERIOR DECK, GLAZING, MASONRY WALL, ETC. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01377991-S2
06/22/2026
Special inspection requirement — Concrete - Cast-In-Place
06/22/2026
Special inspection requirement — Final
06/22/2026
Special inspection requirement — Footing and Foundation
06/15/2026
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
06/08/2026
Objection resolved — Addressed
06/08/2026
Objection resolved — Addressed
06/08/2026
Objection resolved — Addressed
06/08/2026
Special inspection requirement — Post-installed Anchors
06/08/2026
Special inspection requirement — Final
06/08/2026
Special inspection requirement — Structural Steel - Welding
06/08/2026
Special inspection requirement — Structural Steel - Details
06/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/08/2026
Special inspection requirement — Structural Steel - High Strength Bolting
04/23/2026
Objection raised — Other
04/23/2026
Objection raised — Inspections
04/23/2026
Objection raised — Inspections
04/23/2026
Objection raised — Other
04/23/2026
Objection raised — Structural
03/27/2026
Filed — Alteration
FILING HEREWITH EXTERIOR RENOVATIONS AS PER PLANS. NEW EXTERIOR DECK, GLAZING, MASONRY WALL, ETC. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01377991-I1
03/25/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/25/2026
Special inspection requirement — Final
03/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nothing on file for this building.
1 project · most recent 02/05/2025
FiledStatusContractorScope
02/05/2025CompleteVillage Electl Contractors3 meters
1 project · most recent 06/23/2026
Steel Wood
FiledStatusContractorScope
06/23/2026——Steel, Wood
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
06/22/2026Concrete - Cast-In-Place—special
06/22/2026Final—progress
06/22/2026Footing and Foundation—progress
06/15/2026Construction Utilizing CLT or SCL, Type IV—special
06/08/2026Post-installed Anchors—special
06/08/2026Final—progress
06/08/2026Structural Steel - Welding—special
06/08/2026Structural Steel - Details—special
06/08/2026Structural Stability – Alterations of existing buildings—special
06/08/2026Structural Steel - High Strength Bolting—special
03/25/2026Structural Stability – Alterations of existing buildings—special
03/25/2026Final—progress
03/25/2026Fire-Resistant Penetrations and Joints—special
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026B01377991-I1Request digital key ↗
08/15/2026B01377991-S1Request digital key ↗
08/15/2026B01377991-S2Request digital key ↗
▸Applications & Permits3
▸DOB NOWLPC Approval/Permit3
08/17/2026B01377991-I1Open ↗
08/15/2026B01377991-S1Open ↗
08/15/2026B01377991-S2Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026B01377991-S2Open ↗
08/17/2026B01377991-I1Open ↗
08/17/2026B01377991-S1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/14/2026B01377991-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/15/2026B01377991-S2Open ↗
▸Other Documents1
▸DOB NOWProof of Historic Building1
08/14/2026B01377991-I1Open ↗