RoofUnder Construction115p · 1 filing · 20 docs
GeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Structural
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 2 drawing sheets
Floor 63Under Construction2p · 1 filing · 20 docs
Fire Protection
Issued Permit Scope
Standpipe
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 1 drawing sheet
Floor 62Under Construction7p · 5 filings · 20 docs
Fire ProtectionGeneralStructural
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 6 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Installing a concrete placing pump along with the required shoring and supports extending throughout the full height of the building.
On file for this job
3 documents
Latest 3 of 5 filings on this floor.
Floor 61Under Construction5p · 6 filings · 20 docs
ArchitectureFire ProtectionStructural
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 60Under Construction118p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 59Under Construction118p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 58Under Construction118p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 57Under Construction118p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 56Under Construction118p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 55Under Construction118p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 54Under Construction118p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 53Under Construction118p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 52Under Construction118p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 51Under Construction117p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 3 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 50Under Construction117p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 3 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 49Under Construction117p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 3 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 48Under Construction117p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 3 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 47Under Construction117p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 3 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 46Under Construction117p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 3 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 45Under Construction117p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 3 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 44Under Construction117p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 3 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 43Under Construction117p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 3 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 42Under Construction119p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 5 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 41Under Construction119p · 6 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 5 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 40Under Construction119p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 5 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 39Under Construction119p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 5 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 38Under Construction119p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 5 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 37Under Construction118p · 6 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 36Under Construction118p · 6 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 35Under Construction118p · 6 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 34Under Construction118p · 6 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 33Under Construction118p · 6 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 32Under Construction118p · 6 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 31Under Construction118p · 6 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 30Under Construction118p · 6 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 29Under Construction118p · 6 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 28Under Construction118p · 6 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 27Under Construction118p · 6 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 26Under Construction118p · 6 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 25Under Construction118p · 6 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 24Under Construction118p · 6 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 23Under Construction118p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 22Under Construction118p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 21Under Construction118p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 20Under Construction118p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 19Under Construction118p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 18Under Construction118p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 17Under Construction118p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 16Under Construction118p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 15Under Construction118p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 14Under Construction118p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 13Under Construction118p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 4 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 12Under Construction122p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 12th floor through the 61st floor.
On file for this job
2 documents
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 5 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents · 3 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 11Under Construction120p · 5 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 6 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Installing a concrete placing pump along with the required shoring and supports extending throughout the full height of the building.
On file for this job
3 documents
Latest 3 of 5 filings on this floor.
Floor 10Under Construction119p · 5 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 5 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Installing a concrete placing pump along with the required shoring and supports extending throughout the full height of the building.
On file for this job
3 documents
Latest 3 of 5 filings on this floor.
Floor 9Under Construction119p · 5 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 5 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Installing a concrete placing pump along with the required shoring and supports extending throughout the full height of the building.
On file for this job
3 documents
Latest 3 of 5 filings on this floor.
Floor 8Under Construction119p · 5 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 5 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Installing a concrete placing pump along with the required shoring and supports extending throughout the full height of the building.
On file for this job
3 documents
Latest 3 of 5 filings on this floor.
Floor 7Under Construction119p · 5 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 5 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Installing a concrete placing pump along with the required shoring and supports extending throughout the full height of the building.
On file for this job
3 documents
Latest 3 of 5 filings on this floor.
Floor 6Under Construction121p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
CONSTRUCTION OF TEMPORARY CONSTRUCTION SHANTY AS PER DRAWINGS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
On file for this job
3 documents · 1 drawing sheet
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 5 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Latest 3 of 6 filings on this floor.
Floor 5Under Construction120p · 5 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 6 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Installing a concrete placing pump along with the required shoring and supports extending throughout the full height of the building.
On file for this job
3 documents
Latest 3 of 5 filings on this floor.
Floor 4Under Construction120p · 5 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 6 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Installing a concrete placing pump along with the required shoring and supports extending throughout the full height of the building.
On file for this job
3 documents
Latest 3 of 5 filings on this floor.
Floor 3Under Construction119p · 5 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 5 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Installing a concrete placing pump along with the required shoring and supports extending throughout the full height of the building.
On file for this job
3 documents
Latest 3 of 5 filings on this floor.
Floor 2Under Construction124p · 5 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 5 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Installing a concrete placing pump along with the required shoring and supports extending throughout the full height of the building.
On file for this job
3 documents
Latest 3 of 5 filings on this floor.
Floor 1Under Construction121p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural · Support of Excavation
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 2 drawing sheets
ACS Core Climbing Wall Formwork
On file for this job
2 documents
Installing a concrete placing pump along with the required shoring and supports extending throughout the full height of the building.
On file for this job
3 documents
Latest 3 of 4 filings on this floor.
MezzanineUnder Construction121p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 3 drawing sheets
CellarUnder Construction125p · 1 filing · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Standpipe · Support of Excavation
Temporary work platform located above FL 006 to support temporary formwork required for the cantilevered concrete shear wall located at the southeastern corner of the building between FLRS 007 & 008 to be removed upon completion of formwork.
On file for this job
86 documents · 6 drawing sheets