48A FILLMORE STREET
STATEN ISLAND · St. George-New Brighton · BIN 5177558
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureStructuralMechanicalGeneralOther
Filed — no permit issued27p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANZ SEBORGA107/02/2026
NYC DESIGN BUILD ARCHITECTURE504/28/2026
Building Lifecycle
All (79)Filed (6)Objection (45)Special Inspection (28)
10/01/2026
Objection raised — Other
09/22/2026
Objection resolved — Resolved
07/31/2026
Objection raised — Other
07/06/2026
Objection resolved — Resolved
07/06/2026
Objection resolved — Resolved
07/06/2026
Objection resolved — Resolved
07/06/2026
Objection resolved — Resolved
07/06/2026
Objection resolved — Resolved
07/06/2026
Objection resolved — Resolved
07/06/2026
Objection resolved — Resolved
07/06/2026
Objection resolved — Resolved
07/06/2026
Objection resolved — Resolved
07/06/2026
Objection resolved — Resolved
07/06/2026
Objection resolved — Resolved
07/06/2026
Objection resolved — Resolved
07/06/2026
Objection resolved — Resolved
07/06/2026
Objection resolved — Resolved
07/06/2026
Objection resolved — Resolved
07/06/2026
Objection resolved — Resolved
07/02/2026
Filed — New Building
Construct a 1 story ADU detached with new HVAC and Bathroom Exhaust as per the plans filed herewith
S01383696-S2
05/08/2026
Objection raised — Scope
05/06/2026
Objection raised — Other
04/29/2026
Objection raised — Zoning
04/28/2026
Filed — New Building
Construct a 1 story ADU detached with new HVAC and Bathroom Exhaust as per the plans filed herewith
S01383696-S3
04/28/2026
Objection raised — Zoning
04/28/2026
Objection raised — Fire_Protection
04/28/2026
Objection raised — Scope
04/28/2026
Objection raised — Scope
04/28/2026
Objection raised — Admin
04/28/2026
Objection raised — Zoning
04/28/2026
Objection raised — Energy
04/28/2026
Objection raised — Zoning
04/28/2026
Objection raised — Admin
04/28/2026
Objection raised — Fire_Protection
04/28/2026
Objection raised — Structural
04/28/2026
Objection raised — Structural
04/28/2026
Objection raised — Structural
04/28/2026
Objection raised — Structural
04/28/2026
Objection raised — Zoning
04/14/2026
Filed — New Building
Construct a 1 story ADU detached with new HVAC and Bathroom Exhaust as per the plans filed herewith
S01383696-I1
04/14/2026
Filed — New Building
Construct a 1 story ADU detached with new HVAC and Bathroom Exhaust as per the plans filed herewith
S01383696-S1
04/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/08/2026
Special inspection requirement — Energy Code Compliance Inspections
04/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/08/2026
Special inspection requirement — Maintenance information
04/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
04/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
04/08/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
04/07/2026
Special inspection requirement — Final
04/07/2026
Special inspection requirement — Footing and Foundation
04/07/2026
Special inspection requirement — Permanent certificate
04/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
04/07/2026
Special inspection requirement — Air barrier — testing
04/07/2026
Special inspection requirement — Ventilation and air distribution system
04/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/07/2026
Special inspection requirement — Concrete - Cast-In-Place
04/07/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
04/07/2026
Special inspection requirement — Electric vehicle service equipment requirements
04/07/2026
Special inspection requirement — Fenestration air leakage
04/07/2026
Special inspection requirement — Insulation placement and R values
Latest 60 of 79 events.
Nothing on file for this building.
2 projects · most recent 07/02/2026
Air Conditioning Systems Others
FiledStatusContractorScopeMake / Model / Capacity
07/02/2026——Air Conditioning Systems, Others
Cooling
Other
Delta SIG80-110LED 13 kW · Exhaust Fan ×1
Panasonic Intelli Balance @100 ERV 100 CFM · Erv ×1
03/03/2026——Air Conditioning Systems, Others
Cooling
Other
Delta SIG80-110LED 13 kW · Erv ×1
Panasonic Intelli Balance @100 ERV 100 CFM · Erv ×1
1 project · most recent 07/02/2026
Water/Sanitary
FiledStatusContractorScope
07/02/2026——Water/Sanitary
2 projects · most recent 07/02/2026
FiledStatusContractorScope
07/02/2026——2 scope_items
03/03/2026——3 scope_items
2 projects · most recent 07/02/2026
Fence
FiledStatusContractorScope
07/02/2026——Fence
03/03/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
04/08/2026Fire-Resistant Penetrations and Joints—special
04/08/2026Energy Code Compliance Inspections—progress
04/08/2026HVAC-R and service water piping design and insulation—energy_progress
04/08/2026Maintenance information—energy_progress
04/08/2026HVAC-R and service water heating system controls—energy_progress
04/08/2026HVAC-R and service water heating equipment—energy_progress
04/08/2026Excavations - Sheeting, Shoring, and Bracing—special
04/07/2026Final—progress
04/07/2026Footing and Foundation—progress
04/07/2026Permanent certificate—energy_progress
04/07/2026HVAC-R and service water heating system controls—energy_progress
04/07/2026Air barrier — testing —energy_progress
04/07/2026Ventilation and air distribution system—energy_progress
04/07/2026HVAC-R and service water piping design and insulation—energy_progress
04/07/2026Concrete - Cast-In-Place—special
04/07/2026Fenestration and door U-factor and product ratings—energy_progress
04/07/2026Electric vehicle service equipment requirements—energy_progress
04/07/2026Fenestration air leakage—energy_progress
04/07/2026Insulation placement and R values—energy_progress
04/07/2026Fenestration areas—energy_progress
04/07/2026HVAC-R and service water heating equipment—energy_progress
04/07/2026Air barrier - visual inspection—energy_progress
04/07/2026Fire-Resistant Penetrations and Joints—special
04/07/2026Subgrade Inspections—special
04/07/2026Subsurface Conditions – Fill Placement & In-Place Density—special
Latest 25 of 28.
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/17/2026S01358259-I1Request digital key ↗
08/17/2026S01358259-S3Request digital key ↗
08/16/2026S01383696-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S01383696-I1Open ↗
08/13/2026S01358259-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026S01383696-I1Open ↗
08/13/2026S01358259-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/16/2026S01383696-S4Open ↗
08/16/2026S01383696-S3Open ↗
08/16/2026S01383696-S2Open ↗
Showing 3 of 8 on file for this type
▸Inspections & Test Reports2
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026S01358259-S2Open ↗
08/13/2026S01383696-I1Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification2
08/16/2026S01383696-I1Open ↗
08/13/2026S01358259-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S01383696-I1Open ↗
08/13/2026S01358259-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S01383696-I1Open ↗