← Back
BuildNYC
Gas station with retail store
49-04 COLLEGE POINT BOULEVARD
QUEENS · BIN 4115042
💬 Discuss this project
1931Year Built
1Stories
G3Building Class
C2-6AZoning
1,421 sfGross Floor Area
1Units
Gas station with retail store · Owner of record: BP Products North America · 9,898 sf lot · 0.14 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1BP Products North America1 filing · 12 docs
Site & exteriorBP Products North America1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BP Products North America1707/08/2026
BP North America203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Highpoint Associates209/14/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Highpoint Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Alvin Petroleum Systems IGeneral Contractor307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
High Point Engineering1151109/14/2023
Building Lifecycle
All (12)Filed (2)Permit Issued (2)Signed Off (2)Objection (2)Special Inspection (4)
12/27/2023
Signed off — Alteration
Removal of concrete pavement at each column to facilitate addition of steel around existing columns. Replacement of concrete pavement. No change to use, egress or occupancy.
Q00817268-I1
12/27/2023
Signed off — Alteration
Removal of concrete pavement at each column to facilitate addition of steel around existing columns. Replacement of concrete pavement. No change to use, egress or occupancy.
Q00817268-S1
10/17/2023
Permit issued — General Construction
Q00817268-S1-GC-CX
10/17/2023
Permit issued — General Construction
Q00817268-I1-GC
10/02/2023
Objection resolved — Addressed
09/29/2023
Objection raised — Admin
09/14/2023
Filed — Alteration
Removal of concrete pavement at each column to facilitate addition of steel around existing columns. Replacement of concrete pavement. No change to use, egress or occupancy.
Q00817268-S1
09/13/2023
Special inspection requirement — Structural Steel - Details
Christopher Tartaglia
09/13/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christopher Tartaglia
09/13/2023
Special inspection requirement — Final
Christopher Tartaglia
03/22/2023
Filed — Alteration
Removal of concrete pavement at each column to facilitate addition of steel around existing columns. Replacement of concrete pavement. No change to use, egress or occupancy.
Q00817268-I1
01/23/2023
Special inspection requirement — Final
Christopher Tartaglia
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAlvin Petroleum Systems I10/17/2023
DOB NOWGeneral ConstructionSigned-offAlvin Petroleum Systems I10/17/2023
BISFSISSUEDJack Piccini03/04/2019
BISFSISSUEDJack Piccini10/13/2017
BISEQISSUEDAlvin Petroleum Systems I09/22/2017
BISOTISSUEDAlvin Petroleum Systems I09/22/2017
BISOTISSUEDWoodside Associates02/12/2016
BISFPISSUEDAction Fire Service Company02/05/2016
BISOTISSUEDGemstar Construction10/22/2004
BIS—ISSUEDParker Service Industries06/13/2002
BISOTISSUEDParker Service Industries06/13/2002
BIS—ISSUEDParker Service Industries05/23/2002
BIS—ISSUEDParker Service Industries05/23/2002
BISOTISSUEDVic Construction07/23/1992
BISFPISSUEDVic Contruction05/14/1992
BISOTISSUEDVic Contractor05/14/1992
BIS—ISSUEDVic Construction05/12/1992
2 projects · most recent 02/27/2024
General Wiring
FiledStatusContractorScope
02/27/2024CompleteHunter ElectricGeneral Wiring
06/18/2018CompleteRobert S. Covello—
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
09/13/2023Structural Steel - DetailsChristopher Tartagliaspecial
09/13/2023Structural Stability – Alterations of existing buildingsChristopher Tartagliaspecial
09/13/2023FinalChristopher Tartagliaprogress
01/23/2023FinalChristopher Tartagliaprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
BP Products North AmericaAutomotive / fuelFloor 1
Project Q00817268 Alteration · LOC Issued · 03/22/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026Q00817268-I1Request digital key ↗
08/25/2026Q00817268-S1Request digital key ↗
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
10/03/2017421520697Open ↗
10/03/2017421520697Open ↗
02/22/2016421237441Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
06/29/2017421520697Open ↗
11/23/2015421237441Open ↗
11/23/2015421237450Open ↗
▸Seals & Professional Certifications13
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
04/10/2019421520697Open ↗
10/03/2017421520697Open ↗
06/29/2017421520697Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026Q00817268-I1Open ↗
08/25/2026Q00817268-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026Q00817268-S1Open ↗
08/23/2026Q00817268-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026Q00817268-S1Open ↗
08/28/2026Q00817268-S1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
06/29/2017421520697Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
11/29/2016421237450Open ↗
▸Environmental & Asbestos7
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
09/20/2017421520697Open ↗
12/08/2015421237441Open ↗
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026Q00817268-I1Open ↗
08/13/2026Q00817268-S1Open ↗
▸DOB NOWOER: Notice to Proceed2
08/13/2026Q00817268-I1Open ↗
08/13/2026Q00817268-S1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/23/2015421237441Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
04/10/2019421520697Open ↗
10/03/2017421520697Open ↗
06/29/2017421520697Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
04/10/2019421520697Open ↗
10/18/2016421237441Open ↗
10/07/2016421237450Open ↗
▸Approvals, Objections & Sign-offs11
▸BISLETTERS - SUPPORTING DOCUMENTATION6
04/22/2019421520697Open ↗
04/02/2019421520697Open ↗
10/19/2016421237441Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
04/22/2019421520697Open ↗
12/15/2016421237441Open ↗
11/29/2016421237450Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
04/10/2019421520697Open ↗
06/29/2017421520697Open ↗
10/18/2016421237441Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET3
06/29/2017421520697Open ↗
11/23/2015421237441Open ↗
11/23/2015421237450Open ↗
▸BISADDITIONAL INFORMATION1
08/08/2017421520697Open ↗