← Back
Three families
49-05 31 AVENUE
QUEENS · BIN 4013737
💬 Discuss this project
1975Year Built
3Stories
C0Building Class
R5Zoning
3,100 sfGross Floor Area
3Units
1 Open Violation ▸FDNY Report ↗
Three families · 2,000 sf lot · 1.55 FAR built · Flood zone X
Locations of Work
ArchitectureFire Protection
Floor 33p · 2 filings · 20 docs
Floor 22p · 1 filing · 13 docs
Floor 12p · 1 filing · 13 docs
Cellar2p · 1 filing · 13 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
INM ARCHITECTS PC610/30/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GO PRO RESTORATION & MAINGeneral Contractor607/08/2026
GO PRO PLUMBING AND HEATINGPlumbing307/08/2026
ALL PURPOSE ELECTRIC CORPElectrical103/22/2026
GO PRO FIRE PROTECTION CFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HANSEN ENGINEERING PC8174310/30/2023
INM ARCHITECT, P.C.3351510/30/2023
Building Lifecycle
All (75)Filed (6)Permit Issued (8)Signed Off (3)Violation (34)Inspection (8)Objection (4)Special Inspection (12)
03/25/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/20/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/03/2024
Signed off — Alteration
Job filed in conjunction with previously filed GC job Q00679812. Installation of new gas range and kitchen sink in apartment 1 on the first floor. Installation of new sprinklers throughout the entire building.
Q08035468-I1
12/01/2023
Signed off — Alteration
Q00702255-I1
11/30/2023
Signed off — Alteration
Filing application to remove ecb violations 39037872J & 39037871H and restore the first floor to existing conditions. Minor partition and finish work. No change in use, occupancy or egress.
Q00702247-I1
11/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nikola Martinovic
11/13/2023
Special inspection requirement — Sprinkler Systems
Ryan Hansen
10/30/2023
Filed — Alteration
Job filed in conjunction with previously filed GC job Q00679812. Installation of new gas range and kitchen sink in apartment 1 on the first floor. Installation of new sprinklers throughout the entire building.
Q08035468-P2
10/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nikola Martinovic
10/17/2023
Special inspection requirement — Sprinkler Systems
Ryan Hansen
08/24/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/21/2023
Permit issued — General Construction
Q00679812-I1-GC
08/09/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/05/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/02/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/19/2023
Filed — Alteration
Job filed in conjunction with previously filed GC job Q00679812. Installation of new gas range and kitchen sink in apartment 1 on the first floor. Installation of new sprinklers throughout the entire building.
Q08035468-P1
06/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/05/2023
Permit issued — Plumbing
Q08035468-I1-PL
06/05/2023
Permit issued — Plumbing
Q08035468-I1-EW-SP
06/05/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/08/2023
Permit issued — General Construction
Q00702247-I1-GC
04/12/2023
Permit issued — Plumbing
Q00702255-I1-PL
12/12/2022
Filed — Alteration
Job filed in conjunction with previously filed GC job Q00679812. Installation of new gas range and kitchen sink in apartment 1 on the first floor. Installation of new sprinklers throughout the entire building.
Q08035468-I1
06/28/2022
Permit issued — General Construction
Q00679812-I1-GC
06/08/2022
Objection raised — Scope
06/08/2022
Objection resolved — Addressed
06/08/2022
Objection raised — Accessibility
06/08/2022
Objection resolved — Addressed
06/05/2022
Filed — Alteration CO
Filing to change occupancy from existing 2 family to 3 family building. Interior partition and finish work as per plan. New C of O to be obtained.
Q00679812-I1
06/05/2022
Special inspection requirement — Lighting controls
Nikola Martinovic
06/05/2022
Special inspection requirement — Lighting in dwelling units
Nikola Martinovic
06/05/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nikola Martinovic
06/05/2022
Special inspection requirement — Energy Code Compliance Inspections
Nikola Martinovic
05/24/2022
Violation issued (HPD, closed)
B
05/24/2022
Violation issued (HPD, closed)
B
05/24/2022
Violation issued (HPD, closed)
B
05/24/2022
Violation issued (HPD, closed)
B
05/24/2022
Violation issued (HPD, closed)
C
05/24/2022
Violation issued (HPD, closed)
B
05/24/2022
Violation issued (HPD, closed)
C
04/29/2022
Violation issued (HPD, closed)
B
04/29/2022
Violation issued (HPD, closed)
B
04/29/2022
Violation issued (HPD, closed)
B
04/12/2022
Permit issued — General Construction
Q00702247-I1-GC
04/12/2022
Permit issued — Plumbing
Q00702255-I1-PL
03/24/2022
Filed — Alteration
Q00702255-I1
03/24/2022
Filed — Alteration
Filing application to remove ecb violations 39037872J & 39037871H and restore the first floor to existing conditions. Minor partition and finish work. No change in use, occupancy or egress.
Q00702247-I1
03/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nikola Martinovic
03/20/2022
Special inspection requirement — Final
Nikola Martinovic
02/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nikola Martinovic
02/14/2022
Special inspection requirement — Fire-Resistance Rated Construction
Nikola Martinovic
01/28/2022
Violation issued (ECB, closed)
Construction
01/28/2022
Violation issued (ECB, closed)
Construction
11/29/2021
Violation issued (ECB, closed)
Construction
11/29/2021
Violation issued (ECB, closed)
Construction
10/06/2021
Violation issued (ECB, closed)
Construction
10/06/2021
Violation issued (ECB, closed)
Construction
09/27/2021
Violation issued (HPD, closed)
B
09/27/2021
Violation issued (HPD, closed)
B
09/27/2021
Violation issued (HPD, open)
B
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedGO PRO RESTORATION & MAIN08/21/2023
DOB NOWPlumbingSigned-offGO PRO PLUMBING AND HEATI06/05/2023
DOB NOWPlumbingSigned-offGO PRO FIRE PROTECTION C06/05/2023
DOB NOWGeneral ConstructionSigned-offGO PRO RESTORATION & MAIN05/08/2023
DOB NOWPlumbingSigned-offGO PRO PLUMBING AND HEATI04/12/2023
DOB NOWGeneral ConstructionPermit IssuedGO PRO RESTORATION & MAIN06/28/2022
DOB NOWGeneral ConstructionSigned-offGO PRO RESTORATION & MAIN04/12/2022
DOB NOWPlumbingSigned-offGO PRO PLUMBING AND HEATI04/12/2022
1 project · most recent 05/13/2023
General Wiring
FiledStatusContractorScope
05/13/2023CompleteALL PURPOSE ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/25/2026Pass-Final CND-Occupancy InspectionPassView ↗
08/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/24/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/09/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/05/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/05/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
11/13/2023Fire-Resistant Penetrations and JointsNikola Martinovicspecial
11/13/2023Sprinkler SystemsRyan Hansenspecial
10/17/2023Fire-Resistant Penetrations and JointsNikola Martinovicspecial
10/17/2023Sprinkler SystemsRyan Hansenspecial
06/05/2022Lighting controlsNikola Martinovicenergy_progress
06/05/2022Lighting in dwelling unitsNikola Martinovicenergy_progress
06/05/2022Structural Stability – Alterations of existing buildingsNikola Martinovicspecial
06/05/2022Energy Code Compliance InspectionsNikola Martinovicprogress
03/24/2022Fire-Resistant Penetrations and JointsNikola Martinovicspecial
03/20/2022FinalNikola Martinovicprogress
02/14/2022Fire-Resistant Penetrations and JointsNikola Martinovicspecial
02/14/2022Fire-Resistance Rated ConstructionNikola Martinovicprogress
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026Q00702255-I1Request digital key ↗
08/26/2026Q00702247-I1Request digital key ↗
08/26/2026Q00679812-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00679812-I1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWSpecial Inspector Seal & Signature7
08/31/2026Q08035468-I1Open ↗
08/31/2026Q08035468-I1Open ↗
08/28/2026Q08035468-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026Q00702255-I1Open ↗
08/26/2026Q00679812-I1Open ↗
08/25/2026Q08035468-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026Q00702247-I1Open ↗
08/26/2026Q00679812-I1Open ↗
08/26/2026Q00679812-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00679812-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/26/2026Q00702255-I1Open ↗
08/26/2026Q00679812-I1Open ↗
08/25/2026Q08035468-P1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00679812-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/26/2026Q00679812-I1Open ↗