← Back
Two stories - detached, small or mid-size
49-06 21 AVENUE
QUEENS · BIN 4021212
💬 Discuss this project
1955Year Built
1Stories
A1Building Class
R4Zoning
983 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,300 sf lot · 0.3 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Floor 2Under Construction5p · 1 filing · 20 docs
Floor 1Under Construction7p · 1 filing · 20 docs
CellarUnder Construction8p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANK J QUATELA ARCHITECT P.C801/30/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Manetta architecture design pllc1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LUIGI CALIENDO & SONS,INCGeneral Contractor807/08/2026
CN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TRIANGLE INSPECTION & TES7495501/30/2026
Building Lifecycle
All (83)Filed (8)Permit Issued (7)Signed Off (1)Inspection (8)Objection (29)Special Inspection (30)
08/31/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/07/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/25/2026
Permit issued — General Construction
Q00477857-I1-GC
06/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Rajasekhar Sakhamuri
06/17/2026
Special inspection requirement — Fenestration air leakage
Rajasekhar Sakhamuri
06/17/2026
Special inspection requirement — Protection of exposed foundation insulation
Rajasekhar Sakhamuri
06/17/2026
Special inspection requirement — Masonry
Rajasekhar Sakhamuri
06/17/2026
Special inspection requirement — Maintenance information
Rajasekhar Sakhamuri
06/17/2026
Special inspection requirement — Permanent certificate
Rajasekhar Sakhamuri
06/17/2026
Special inspection requirement — Air barrier - visual inspection
Rajasekhar Sakhamuri
06/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Rajasekhar Sakhamuri
06/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Rajasekhar Sakhamuri
06/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
Rajasekhar Sakhamuri
06/17/2026
Special inspection requirement — Concrete - Cast-In-Place
Rajasekhar Sakhamuri
06/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
06/17/2026
Special inspection requirement — Interior lighting power
Rajasekhar Sakhamuri
06/17/2026
Special inspection requirement — Fireplaces
Rajasekhar Sakhamuri
06/17/2026
Special inspection requirement — Insulation placement and R values
Rajasekhar Sakhamuri
06/17/2026
Special inspection requirement — Fenestration areas
Rajasekhar Sakhamuri
04/24/2026
Objection raised — Zoning
04/24/2026
Objection raised — Admin
04/24/2026
Objection raised — Zoning
01/30/2026
Filed — Alteration CO
NEW HORIZONTAL ENLARGEMENT AT FIRST FLOOR. GUT RENOVATION AT CELLAR INCLUDING NEW FOOTING FOR EXTERIOR STEPS, FRAMING, PARTITIONS, DOORS WINDWS, CABINETRY, FINISHES AND HVAC.
Q00477857-P3
01/28/2026
Special inspection requirement — Energy Code Compliance Inspections
Rajasekhar Sakhamuri
01/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
Rajasekhar Sakhamuri
01/28/2026
Special inspection requirement — Protection of exposed foundation insulation
Rajasekhar Sakhamuri
01/28/2026
Special inspection requirement — Air barrier - visual inspection
Rajasekhar Sakhamuri
01/28/2026
Special inspection requirement — Concrete - Cast-In-Place
Rajasekhar Sakhamuri
01/28/2026
Special inspection requirement — Fenestration air leakage
Rajasekhar Sakhamuri
01/28/2026
Special inspection requirement — Maintenance information
Rajasekhar Sakhamuri
01/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
01/28/2026
Special inspection requirement — Masonry
Rajasekhar Sakhamuri
01/28/2026
Special inspection requirement — Fenestration areas
Rajasekhar Sakhamuri
01/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Rajasekhar Sakhamuri
01/28/2026
Special inspection requirement — Permanent certificate
Rajasekhar Sakhamuri
01/28/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Rajasekhar Sakhamuri
01/28/2026
Special inspection requirement — Insulation placement and R values
Rajasekhar Sakhamuri
01/10/2023
Signed off — Alteration
Q00478369-I1
07/12/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/12/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/27/2022
Objection resolved — Addressed
05/25/2022
Objection raised — Other
05/23/2022
Objection resolved — Addressed
05/19/2022
Objection raised — Scope
05/16/2022
Filed — Alteration
REPLACE EXISTING HOT WATER HEATER AND BOILER. NEW PLUMBING FIXTURES WITH ASSOCIATED PIPING THROUGHOUT. BUILDING IS TO REMAIN VACANT DURING CONSTRUCTION.
Q00444565-P2
05/16/2022
Filed — Alteration CO
NEW HORIZONTAL ENLARGEMENT AT FIRST FLOOR. GUT RENOVATION AT CELLAR INCLUDING NEW FOOTING FOR EXTERIOR STEPS, FRAMING, PARTITIONS, DOORS WINDWS, CABINETRY, FINISHES AND HVAC.
Q00477857-P2
03/16/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/16/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/25/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/19/2022
Permit issued — Plumbing
Q00444565-I1-PL
01/01/2022
Permit issued — Construction Fence
Q00478369-I1-FN
11/24/2021
Permit issued — General Construction
Q00477857-I1-GC
11/23/2021
Permit issued — Construction Fence
Q00478369-I1-FN
09/20/2021
Permit issued — General Construction
Q00477857-I1-GC
09/17/2021
Permit issued — Construction Fence
Q00478369-I1-FN
08/11/2021
Objection resolved — Addressed
07/23/2021
Objection raised — Scope
07/21/2021
Filed — Alteration
REPLACE EXISTING HOT WATER HEATER AND BOILER. NEW PLUMBING FIXTURES WITH ASSOCIATED PIPING THROUGHOUT. BUILDING IS TO REMAIN VACANT DURING CONSTRUCTION.
Q00444565-P1
07/21/2021
Filed — Alteration CO
NEW HORIZONTAL ENLARGEMENT AT FIRST FLOOR. GUT RENOVATION AT CELLAR INCLUDING NEW FOOTING FOR EXTERIOR STEPS, FRAMING, PARTITIONS, DOORS WINDWS, CABINETRY, FINISHES AND HVAC.
Q00477857-P1
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedLUIGI CALIENDO & SONS,INC06/25/2026
DOB NOWPlumbingSigned-offCN PLUMBING INC01/19/2022
DOB NOWConstruction FenceSigned-offLUIGI CALIENDO & SONS,INC01/01/2022
DOB NOWGeneral ConstructionPermit IssuedLUIGI CALIENDO & SONS,INC11/24/2021
DOB NOWConstruction FenceSigned-offLUIGI CALIENDO & SONS,INC11/23/2021
DOB NOWGeneral ConstructionPermit IssuedLUIGI CALIENDO & SONS,INC09/20/2021
DOB NOWConstruction FenceSigned-offLUIGI CALIENDO & SONS,INC09/17/2021
1 project · most recent 05/16/2022
Gas Water/Sanitary
FiledStatusContractorScope
05/16/2022Signed-offCN PLUMBING INCGas, Water/Sanitary
1 project · most recent 09/06/2023
General Wiring
FiledStatusContractorScope
09/06/2023CompleteNORTHEAST ELECTL CONTINGGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
08/31/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/07/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/12/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/12/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/16/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/25/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 82
DateRequirementInspectorRole
06/17/2026Permanent certificateRajasekhar Sakhamurienergy_progress
06/17/2026Insulation placement and R valuesRajasekhar Sakhamurienergy_progress
06/17/2026Fenestration areasRajasekhar Sakhamurienergy_progress
06/17/2026Fenestration and door U-factor and product ratingsRajasekhar Sakhamurienergy_progress
06/17/2026Protection of exposed foundation insulationRajasekhar Sakhamurienergy_progress
06/17/2026Energy Code Compliance InspectionsRajasekhar Sakhamuriprogress
06/17/2026Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
06/17/2026Concrete - Cast-In-PlaceRajasekhar Sakhamurispecial
06/17/2026Structural Stability – Alterations of existing buildingsRajasekhar Sakhamurispecial
06/17/2026MasonryRajasekhar Sakhamurispecial
06/17/2026Fire-Resistance Rated ConstructionRajasekhar Sakhamuriprogress
06/17/2026Maintenance informationRajasekhar Sakhamurienergy_progress
06/17/2026FireplacesRajasekhar Sakhamurienergy_progress
06/17/2026Interior lighting powerRajasekhar Sakhamurienergy_progress
06/17/2026Air barrier - visual inspectionRajasekhar Sakhamurienergy_progress
06/17/2026Fenestration air leakageRajasekhar Sakhamurienergy_progress
01/28/2026Fenestration air leakageRajasekhar Sakhamurienergy_progress
01/28/2026Fenestration and door U-factor and product ratingsRajasekhar Sakhamurienergy_progress
01/28/2026Fenestration areasRajasekhar Sakhamurienergy_progress
01/28/2026Permanent certificateRajasekhar Sakhamurienergy_progress
01/28/2026Air barrier - visual inspectionRajasekhar Sakhamurienergy_progress
01/28/2026Fire-Resistance Rated ConstructionRajasekhar Sakhamuriprogress
01/28/2026Energy Code Compliance InspectionsRajasekhar Sakhamuriprogress
01/28/2026Structural Stability – Alterations of existing buildingsRajasekhar Sakhamurispecial
01/28/2026MasonryRajasekhar Sakhamurispecial
Latest 25 of 82.
▾Documents — 108 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch5
08/27/2026Q00478369-I1Request digital key ↗
08/17/2026Q00477857-P3Request digital key ↗
08/17/2026Q00477857-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
08/27/2026Q00444565-I1Request digital key ↗
08/15/2026Q00444565-P2Request digital key ↗
08/15/2026Q00444565-P1Request digital key ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q00477857-P2Open ↗
08/13/2026Q00477857-I1Open ↗
08/13/2026Q00477857-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026Q00477857-I1Open ↗
▸Seals & Professional Certifications68
▸DOB NOWProgress Inspector Seal & Signature46
08/31/2026Q00477857-I1Open ↗
08/31/2026Q00477857-I1Open ↗
08/31/2026Q00477857-I1Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
08/31/2026Q00477857-I1Open ↗
08/31/2026Q00477857-I1Open ↗
08/31/2026Q00477857-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026Q00478369-I1Open ↗
08/17/2026Q00477857-P2Open ↗
08/17/2026Q00477857-P3Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist4
08/13/2026Q00477857-P1Open ↗
08/13/2026Q00477857-I1Open ↗
08/13/2026Q00477857-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00477857-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/17/2026Q00477857-P3Open ↗
08/17/2026Q00477857-P1Open ↗
08/15/2026Q00477857-I1Open ↗
Showing 3 of 7 on file for this type
▸Other Documents15
▸DOB NOWSURVEY: INITIAL4
08/13/2026Q00477857-I1Open ↗
08/13/2026Q00477857-P1Open ↗
08/13/2026Q00477857-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q00477857-P3Open ↗
08/13/2026Q00477857-I1Open ↗
08/13/2026Q00477857-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/13/2026Q00477857-I1Open ↗
08/13/2026Q00477857-P2Open ↗
08/13/2026Q00477857-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial2
08/15/2026Q00477857-I1Open ↗
08/13/2026Q00477857-P3Open ↗
▸DOB NOWFinal Survey1
08/15/2026Q00477857-I1Open ↗