4 Open Violations 1 unresolved · 3 paperwork only▸
DOB04/16/2000VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
ECB05/19/2026OBSERVED AT 3:56PM MAY19,2026, IN THE BACK OF THE BUILDING NEW ELECTRICAL WORK DONE IN THE NEWLY CONSTRUCTED UNPERMITTED STRUCTURE. INSTALLED JUNCTION BOXES, ELECTRICAL FIXTURES, ONE SPLIT UNIT AIR CONDITIONER,Hearing held — result not yet published$2K proposed
ECB05/19/2026OBSERVED IN THE BACK OF THE BUILDING CONSTRUCTED NEW STRUCTURE APPROXIMATELY 20'X10' WITH 2 WINDOWS, 2 DOORS, VINYL SIDING, SHINGLE ROOF. JOB IS 80% COMPLETED. NO CONSTRUCTION PERMIT FOR THIS WORK AT THE TIME OHearing held — result not yet published$2K proposed
ECB05/19/2026OBSERVED IN THE BACK OF THE BUILDING DEMOLISHED THE GARAGE TO THE GRADE. NO DEMOLITION PERMIT FOR THIS WORK AT THE TIME OF INSPECTION., OBTAIN REQUIRED DEMOLITION PERMITHearing held — result not yet published$5K proposed
Two family frame · 2,600 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.