3 Open Violations 0 unresolved · 3 paperwork only▸
ECB05/19/2026OBSERVED AT 3:56PM MAY19,2026, IN THE BACK OF THE BUILDING NEW ELECTRICAL WORK DONE IN THE NEWLY CONSTRUCTED UNPERMITTED STRUCTURE. INSTALLED JUNCTION BOXES, ELECTRICAL FIXTURES, ONE SPLIT UNIT AIR CONDITIONER,Hearing held — result not yet published$2K proposed
ECB05/19/2026OBSERVED IN THE BACK OF THE BUILDING CONSTRUCTED NEW STRUCTURE APPROXIMATELY 20'X10' WITH 2 WINDOWS, 2 DOORS, VINYL SIDING, SHINGLE ROOF. JOB IS 80% COMPLETED. NO CONSTRUCTION PERMIT FOR THIS WORK AT THE TIME OHearing held — result not yet published$2K proposed
ECB05/19/2026OBSERVED IN THE BACK OF THE BUILDING DEMOLISHED THE GARAGE TO THE GRADE. NO DEMOLITION PERMIT FOR THIS WORK AT THE TIME OF INSPECTION., OBTAIN REQUIRED DEMOLITION PERMITHearing held — result not yet published$5K proposed
Two family frame · 2,600 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
All (6)Filed (1)Violation (3)Objection (1)Special Inspection (1)
08/17/2026
Objection raised — Scope
07/01/2026
Filed — Alteration
TO PROPOSE INTERIOR REMOVAL OF EXISTING STRUCTURE WITH ROOF TO REMOVE VIOLATION #39189283Y, #39189284X, #39189285H AND RESTORE GARAGE AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY
Q01421602-I1
06/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints