← Back
Cape Cod
49-19 169 STREET
QUEENS · East Flushing · BIN 4125858
💬 Discuss this project
1955Year Built
1.5Stories
A0Building Class
R2AZoning
945 sfGross Floor Area
1Units
Cape Cod · 4,000 sf lot · 0.24 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalGeneral
Permit Issued — active, not yet Signed-off
AtticUnder Construction2p · 1 filing · 20 docs
Floor 2Under Construction2p · 1 filing · 20 docs
Floor 1Under Construction2p · 1 filing · 20 docs
CellarUnder Construction3p · 1 filing · 20 docs
Site & exteriorUnder Construction10p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/18/2025$800K—Private party → SUNFLOWER HOUSE LLC$847/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EDWARD LUI ARCHITECT PLLC505/27/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EXCELLENT METROPOLITANGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
G ENGINEERING PC7778305/27/2026
TRIANGLE INSPECTION & TES7495104/29/2026
Building Lifecycle
All (43)Filed (5)Permit Issued (2)Objection (6)Special Inspection (30)
06/10/2026
Permit issued — Mechanical Systems
Q01349377-I1-GC-CX
06/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIONGCAI GU
06/08/2026
Special inspection requirement — Concrete - Cast-In-Place
XIONGCAI GU
06/08/2026
Special inspection requirement — Structural Steel - High Strength Bolting
XIONGCAI GU
06/08/2026
Special inspection requirement — Mechanical Systems
XIONGCAI GU
06/08/2026
Special inspection requirement — Structural Steel - Welding
XIONGCAI GU
06/08/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
06/08/2026
Special inspection requirement — Structural Steel - Details
XIONGCAI GU
06/08/2026
Special inspection requirement — Heating Systems
XIONGCAI GU
06/08/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIONGCAI GU
06/08/2026
Special inspection requirement — Subgrade Inspections
XIONGCAI GU
06/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
06/08/2026
Special inspection requirement — Masonry
XIONGCAI GU
06/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
XIONGCAI GU
06/08/2026
Special inspection requirement — Final
DENIS PORTAEV
06/08/2026
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
06/08/2026
Special inspection requirement — Structural Wood Frame
XIONGCAI GU
06/08/2026
Special inspection requirement — Footing and Foundation
XIONGCAI GU
06/08/2026
Special inspection requirement — Insulation placement and R values
XIONGCAI GU
06/08/2026
Special inspection requirement — Fenestration air leakage
XIONGCAI GU
06/08/2026
Special inspection requirement — Protection of exposed foundation insulation
XIONGCAI GU
06/08/2026
Special inspection requirement — Electric vehicle service equipment requirements
XIONGCAI GU
06/08/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
XIONGCAI GU
06/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
XIONGCAI GU
06/08/2026
Special inspection requirement — Air barrier — testing
XIONGCAI GU
06/08/2026
Special inspection requirement — Air barrier - visual inspection
XIONGCAI GU
06/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
XIONGCAI GU
06/08/2026
Special inspection requirement — Permanent certificate
XIONGCAI GU
06/08/2026
Special inspection requirement — Maintenance information
XIONGCAI GU
06/08/2026
Special inspection requirement — Interior lighting power
XIONGCAI GU
06/08/2026
Special inspection requirement — Ventilation and air distribution system
XIONGCAI GU
05/27/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
CURB CUT WORK TYPE FILED IN CONJUNCTION WITH NB Q01371117-I1 DETACHED 1-CAR GARAGE AND ALT-CO JOB# Q01349377-I1 ALTERATION & EXPANSION OF DETACHED 1-FAMILY PLUS 1-ADU HOUSE.
Q01349377-P1
04/29/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
CURB CUT WORK TYPE FILED IN CONJUNCTION WITH NB Q01371117-I1 DETACHED 1-CAR GARAGE AND ALT-CO JOB# Q01349377-I1 ALTERATION & EXPANSION OF DETACHED 1-FAMILY PLUS 1-ADU HOUSE.
Q01349377-S3
04/28/2026
Permit issued — Construction Fence
Q01349377-S1-FN
04/15/2026
Objection resolved — Addressed
04/15/2026
Objection resolved — Addressed
04/13/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
CURB CUT WORK TYPE FILED IN CONJUNCTION WITH NB Q01371117-I1 DETACHED 1-CAR GARAGE AND ALT-CO JOB# Q01349377-I1 ALTERATION & EXPANSION OF DETACHED 1-FAMILY PLUS 1-ADU HOUSE.
Q01349377-S1
04/03/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
CURB CUT WORK TYPE FILED IN CONJUNCTION WITH NB Q01371117-I1 DETACHED 1-CAR GARAGE AND ALT-CO JOB# Q01349377-I1 ALTERATION & EXPANSION OF DETACHED 1-FAMILY PLUS 1-ADU HOUSE.
Q01349377-S2
04/03/2026
Objection raised — Energy
04/03/2026
Objection raised — Plumbing
03/28/2026
Objection resolved — Addressed
03/11/2026
Objection raised — Other
03/03/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
CURB CUT WORK TYPE FILED IN CONJUNCTION WITH NB Q01371117-I1 DETACHED 1-CAR GARAGE AND ALT-CO JOB# Q01349377-I1 ALTERATION & EXPANSION OF DETACHED 1-FAMILY PLUS 1-ADU HOUSE.
Q01349377-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedEXCELLENT METROPOLITAN06/10/2026
DOB NOWConstruction FencePermit IssuedEXCELLENT METROPOLITAN04/28/2026
1 project · most recent 05/27/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/27/2026Permit IssuedEXCELLENT METROPOLITANHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Gree GREE LIV09HP115V1R32AO 13,000 BTU · Condensing Unit ×4
GREE MUL18HP230V1R32AO 18,000 BTU · Condensing Unit ×4
Ventilation
Renewaire RENEWAIRE #EV90 90 CFM · Erv ×2
1 project · most recent 07/29/2026
General Wiring
FiledStatusContractorScope
07/29/2026Permit IssuedTOWER FIRE & ELECT SVCSGeneral Wiring
1 project · most recent 05/27/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
05/27/2026Permit IssuedEXCELLENT METROPOLITANSteel, Concrete, Masonry, Wood
1 project · most recent 05/27/2026
Fence
FiledStatusContractorScope
05/27/2026Permit IssuedEXCELLENT METROPOLITANFence
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
06/08/2026Structural Stability – Alterations of existing buildingsXIONGCAI GUspecial
06/08/2026Concrete - Cast-In-PlaceXIONGCAI GUspecial
06/08/2026Structural Steel - High Strength BoltingXIONGCAI GUspecial
06/08/2026Mechanical SystemsXIONGCAI GUspecial
06/08/2026Structural Steel - WeldingXIONGCAI GUspecial
06/08/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
06/08/2026Structural Steel - DetailsXIONGCAI GUspecial
06/08/2026Heating SystemsXIONGCAI GUspecial
06/08/2026Excavations - Sheeting, Shoring, and BracingXIONGCAI GUspecial
06/08/2026Subgrade InspectionsXIONGCAI GUspecial
06/08/2026Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
06/08/2026MasonryXIONGCAI GUspecial
06/08/2026Fire-Resistance Rated ConstructionXIONGCAI GUprogress
06/08/2026FinalDENIS PORTAEVprogress
06/08/2026Energy Code Compliance InspectionsXIONGCAI GUprogress
06/08/2026Structural Wood FrameXIONGCAI GUprogress
06/08/2026Footing and FoundationXIONGCAI GUprogress
06/08/2026Insulation placement and R valuesXIONGCAI GUenergy_progress
06/08/2026Fenestration air leakageXIONGCAI GUenergy_progress
06/08/2026Protection of exposed foundation insulationXIONGCAI GUenergy_progress
06/08/2026Electric vehicle service equipment requirementsXIONGCAI GUenergy_progress
06/08/2026Fenestration and door U-factor and product ratingsXIONGCAI GUenergy_progress
06/08/2026HVAC-R and service water piping design and insulationXIONGCAI GUenergy_progress
06/08/2026Air barrier — testing XIONGCAI GUenergy_progress
06/08/2026Air barrier - visual inspectionXIONGCAI GUenergy_progress
Latest 25 of 33.
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/16/2026Q01349377-P1Request digital key ↗
08/16/2026Q01349377-S3Request digital key ↗
08/16/2026Q01349377-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/16/2026Q01349377-P1Open ↗
08/16/2026Q01349377-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/16/2026Q01349377-P1Open ↗
08/16/2026Q01349377-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026Q01349377-I1Open ↗
▸Seals & Professional Certifications38
▸DOB NOWProgress Inspector Seal & Signature21
08/25/2026Q01349377-I1Open ↗
08/25/2026Q01349377-I1Open ↗
08/25/2026Q01349377-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
08/25/2026Q01349377-I1Open ↗
08/25/2026Q01349377-I1Open ↗
08/25/2026Q01349377-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/16/2026Q01349377-P1Open ↗
08/16/2026Q01349377-S3Open ↗
08/16/2026Q01349377-S2Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/16/2026Q01349377-P1Open ↗
08/16/2026Q01349377-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/16/2026Q01349377-P1Open ↗
08/16/2026Q01349377-S3Open ↗
08/16/2026Q01349377-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/16/2026Q01349377-P1Open ↗
08/16/2026Q01349377-S3Open ↗
08/16/2026Q01349377-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/16/2026Q01349377-S3Open ↗
08/16/2026Q01349377-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/16/2026Q01349377-I1Open ↗
08/16/2026Q01349377-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/16/2026Q01349377-P1Open ↗
08/16/2026Q01349377-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/16/2026Q01349377-P1Open ↗
08/16/2026Q01349377-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/16/2026Q01349377-I1Open ↗