← Back
BuildNYC
Two stories - detached, small or mid-size
49 CANTERBURY AVENUE
STATEN ISLAND · BIN 5030264
💬 Discuss this project
1955Year Built
2Stories
A1Building Class
R3XZoning
3,023 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,000 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2p · 1 filing · 20 docs
Floor 214p · 1 filing · 20 docs
Floor 1Curb cut application19p · 3 filings · 20 docs
Cellar21p · 2 filings · 20 docs
Site & exteriorConstruction fence installation1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ryan Design Architecture912/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Aprile Bonamo Filing Rep203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.D. Alpha ConstructionGeneral Contractor1203/21/2026
A.D. Alpha ConstructionScaffold603/21/2026
EH Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ryan Design Architecture7159312/18/2024
Building Lifecycle
01/02/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/19/2024
Special inspection requirement — Concrete - Cast-In-Place
Daniel Ryan
12/19/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Daniel Ryan
12/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel Ryan
12/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Daniel Ryan
63 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offA.D. Alpha Construction04/20/2023
DOB NOWStructuralPermit IssuedA.D. Alpha Construction02/15/2023
DOB NOWConstruction FenceSigned-offA.D. Alpha Construction05/18/2022
DOB NOWStructuralPermit IssuedA.D. Alpha Construction05/18/2022
DOB NOWPlumbingSigned-offEH Plumbing & Heating04/27/2022
DOB NOWFoundationPermit IssuedA.D. Alpha Construction02/01/2022
DOB NOWConstruction FenceSigned-offA.D. Alpha Construction08/19/2021
2 projects · most recent 05/18/2022
General Wiring
FiledStatusContractorScope
05/18/2022CompleteApco ElectricalGeneral Wiring
02/13/2022CompleteApco ElectricalGeneral Wiring
1 project · most recent 12/18/2024
Concrete Wood
FiledStatusContractorScope
12/18/2024Permit IssuedA.D. Alpha ConstructionConcrete, Wood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
01/02/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/27/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
04/25/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/05/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/05/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/05/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/05/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/18/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
12/19/2024Concrete - Cast-In-PlaceDaniel Ryanspecial
12/19/2024Subsurface Investigations (Borings/Test Pits)Daniel Ryanspecial
12/19/2024Fire-Resistant Penetrations and JointsDaniel Ryanspecial
12/19/2024Structural Stability – Alterations of existing buildingsDaniel Ryanspecial
12/19/2024Subgrade InspectionsDaniel Ryanspecial
12/19/2024Energy Code Compliance InspectionsDaniel Ryanprogress
12/19/2024Footing and FoundationDaniel Ryanprogress
12/19/2024Fire-Resistance Rated ConstructionDaniel Ryanprogress
12/19/2024FinalJIAN DENGprogress
12/19/2024Structural Wood FrameDaniel Ryanprogress
12/19/2024Fenestration air leakageDaniel Ryanenergy_progress
12/19/2024Maintenance informationDaniel Ryanenergy_progress
12/19/2024Insulation placement and R valuesDaniel Ryanenergy_progress
12/19/2024Interior lighting powerDaniel Ryanenergy_progress
12/19/2024Fenestration areasDaniel Ryanenergy_progress
12/19/2024HVAC-R and service water piping design and insulationDaniel Ryanenergy_progress
12/19/2024Fenestration and door U-factor and product ratingsDaniel Ryanenergy_progress
12/19/2024Air barrier - visual inspectionDaniel Ryanenergy_progress
05/08/2023HVAC-R and service water piping design and insulationDaniel Ryanenergy_progress
05/08/2023HVAC-R and service water heating equipmentDaniel Ryanenergy_progress
05/08/2023HVAC-R and service water heating system controlsDaniel Ryanenergy_progress
05/08/2023Maintenance informationDaniel Ryanenergy_progress
04/26/2023HVAC-R and service water piping design and insulationDaniel Ryanenergy_progress
04/26/2023HVAC-R and service water heating equipmentDaniel Ryanenergy_progress
04/26/2023HVAC-R and service water heating system controlsDaniel Ryanenergy_progress
Latest 25 of 34.
101 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account