← Back
Condo, residential unit in 2-10 unit building
49 CLINTON AVENUE
STATEN ISLAND · BIN 5095140
💬 Discuss this project
0Year Built
3Stories
R1Building Class
M1-1Zoning
4,696 sfGross Floor Area
6Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Condo, residential unit in 2-10 unit building · 4,850 sf lot · 0.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction73p · 1 filing · 20 docs
Floor 3Under Construction75p · 1 filing · 20 docs
Floor 2Under Construction77p · 1 filing · 20 docs
Floor 1Under Construction81p · 1 filing · 20 docs
CellarUnder Construction86p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ST JOSEPH'S HOSPITAL, YONKERS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROSENTHAL ENGINEERING PLLC1306/16/2026
MICHAEL WALCH ARCHITECT PC305/26/2026
ASHRAF CORP205/07/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PHOENIX SUTTON STR INCGeneral Contractor508/04/2026
ERIN CONSTRUCTION & DEVELOPMENTGeneral Contractor403/21/2026
VAND MECHANICAL INCPlumbing408/30/2026
FIVE BOROUGH NYC LLCFire Protection107/08/2026
CENTRAL AIR CONDITIONINGGeneral Contractor104/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RICHMOND TESTING LAB2631106/16/2026
Building Lifecycle
All (82)Filed (18)Permit Issued (13)Signed Off (1)Violation (7)Inspection (7)Objection (6)Special Inspection (30)
08/27/2026
Permit issued — Plumbing
S01092223-S2-PL
08/27/2026
Permit issued — Boiler Equipment
S01125308-I1-BE
08/03/2026
Permit issued — Sidewalk Shed
S01382040-I1-SH
06/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
RICHARD LEMANSKY
06/22/2026
Special inspection requirement — Final
RICHARD LEMANSKY
06/22/2026
Special inspection requirement — Energy Code Compliance Inspections
RICHARD LEMANSKY
06/22/2026
Special inspection requirement — Maintenance information
RICHARD LEMANSKY
06/22/2026
Special inspection requirement — Mechanical Systems
RICHARD LEMANSKY
06/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
RICHARD LEMANSKY
06/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD LEMANSKY
06/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
RICHARD LEMANSKY
06/16/2026
Filed — Alteration
PROPOSED SPRINKLER WORK IN CONJUNCTION TO GENERAL CONSTRUCTION WORKS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
S01092223-P8
06/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
RICHARD LEMANSKY
06/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
RICHARD LEMANSKY
06/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
RICHARD LEMANSKY
06/12/2026
Special inspection requirement — Energy Code Compliance Inspections
RICHARD LEMANSKY
06/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD LEMANSKY
06/12/2026
Special inspection requirement — Maintenance information
RICHARD LEMANSKY
06/09/2026
Special inspection requirement — Heating Systems
RICHARD LEMANSKY
06/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
RICHARD LEMANSKY
06/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
RICHARD LEMANSKY
06/09/2026
Special inspection requirement — Maintenance information
RICHARD LEMANSKY
06/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
RICHARD LEMANSKY
06/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD LEMANSKY
06/08/2026
Special inspection requirement — Sprinkler Systems
RICHARD LEMANSKY
06/05/2026
Filed — Alteration
PROPOSED SPRINKLER WORK IN CONJUNCTION TO GENERAL CONSTRUCTION WORKS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
S01092223-A1
06/05/2026
Filed — Alteration
PROPOSED SPRINKLER WORK IN CONJUNCTION TO GENERAL CONSTRUCTION WORKS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
S01092223-P9
06/05/2026
Filed — Alteration
Propose to install Two gas fired boilers @ cellar in conjunction with ALT-2 GC #S01092223-I1,
S01125308-P2
05/26/2026
Filed — Alteration
PROPOSED SPRINKLER WORK IN CONJUNCTION TO GENERAL CONSTRUCTION WORKS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
S01092223-P7
05/12/2026
Signed off — Alteration
S01242589-I1
05/11/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/08/2026
Permit issued — Sidewalk Shed
S01382040-I1-SH
05/08/2026
Permit issued — Sidewalk Shed
S01382040-I1-SF
05/07/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
S01382040-I1
05/07/2026
Violation issued (HPD, open)
A
04/22/2026
Special inspection requirement — Masonry
RICHARD LEMANSKY
04/22/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
RICHARD LEMANSKY
04/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD LEMANSKY
04/22/2026
Special inspection requirement — Structural Steel - Details
RICHARD LEMANSKY
04/22/2026
Special inspection requirement — Structural Steel - High Strength Bolting
RICHARD LEMANSKY
04/22/2026
Special inspection requirement — Wood – Seismic Resistance
04/22/2026
Special inspection requirement — Concrete - Cast-In-Place
RICHARD LEMANSKY
04/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD LEMANSKY
04/22/2026
Special inspection requirement — Structural Steel - Welding
RICHARD LEMANSKY
04/16/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/01/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/01/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/18/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/04/2026
Permit issued — Boiler Equipment
S01125308-I1-BE
01/30/2026
Permit issued — Plumbing
S01092223-S2-PL
11/21/2025
Violation issued (HPD, closed)
I
11/13/2025
Permit issued — Structural
S01092223-I1-GC
10/01/2025
Permit issued — Sprinklers
S01092223-S3-EW-SP
10/01/2025
Permit issued — Mechanical Systems
S01092223-S1-MS
08/20/2025
Permit issued — General Construction
S01092223-I1-GC
08/15/2025
Filed — Alteration
PROPOSED SPRINKLER WORK IN CONJUNCTION TO GENERAL CONSTRUCTION WORKS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
S01092223-P4
08/15/2025
Filed — Alteration
PROPOSED SPRINKLER WORK IN CONJUNCTION TO GENERAL CONSTRUCTION WORKS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
S01092223-P5
08/15/2025
Filed — Alteration
Propose to install Two gas fired boilers @ cellar in conjunction with ALT-2 GC #S01092223-I1,
S01125308-P1
08/15/2025
Filed — Alteration
PROPOSED SPRINKLER WORK IN CONJUNCTION TO GENERAL CONSTRUCTION WORKS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
S01092223-P3
08/13/2025
Filed — Alteration
PROPOSED SPRINKLER WORK IN CONJUNCTION TO GENERAL CONSTRUCTION WORKS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
S01092223-P2
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedVAND MECHANICAL INC08/27/2026
DOB NOWBoiler EquipmentPermit IssuedVAND MECHANICAL INC08/27/2026
DOB NOWSidewalk ShedPermit IssuedPHOENIX SUTTON STR INC08/03/2026
DOB NOWSidewalk ShedPermit IssuedPHOENIX SUTTON STR INC05/08/2026
DOB NOWSidewalk ShedPermit IssuedPHOENIX SUTTON STR INC05/08/2026
DOB NOWBoiler EquipmentPermit IssuedVAND MECHANICAL INC02/04/2026
DOB NOWPlumbingPermit IssuedVAND MECHANICAL INC01/30/2026
DOB NOWStructuralPermit IssuedERIN CONSTRUCTION & DEVELOPMENT11/13/2025
DOB NOWSprinklersPermit IssuedFIVE BOROUGH NYC LLC10/01/2025
DOB NOWMechanical SystemsPermit IssuedCENTRAL AIR CONDITIONING10/01/2025
DOB NOWGeneral ConstructionPermit IssuedERIN CONSTRUCTION & DEVELOPMENT08/20/2025
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC06/27/2025
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC06/27/2025
1 project · most recent 06/16/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/16/2026Permit IssuedERIN CONSTRUCTION & DEVELHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-3C24NA4 30,600 BTU · Vrf Outdoor ×18
Ventilation
Panasonic FV-05-11VK2 50 CFM · Exhaust Fan ×12
FV-11-15VK 100 CFM · Exhaust Fan ×12
1 project · most recent 06/16/2026
FiledStatusContractorScope
06/16/2026Permit IssuedFIVE BOROUGH NYC LLC128 heads
1 project · most recent 06/16/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/16/2026Permit IssuedVAND MECHANICAL INCGas, Water/Sanitary
3 projects · most recent 02/10/2026
General Wiring
FiledStatusContractorScope
02/10/2026Permit IssuedTITAN ELEC'L & ELEV CONTR—
09/08/2025Permit IssuedVALENTIS ELECTRIC, INC.General Wiring
06/28/2025Permit IssuedRICHARD NEU—
1 project · most recent 06/16/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
06/16/2026Permit IssuedVAND MECHANICAL INCSteel, Concrete, Masonry, Wood
1 project · most recent 05/07/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
05/07/2026Permit IssuedPHOENIX SUTTON STR INCScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/11/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/16/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/01/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/01/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/18/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/21/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
03/21/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 114
DateRequirementInspectorRole
06/22/2026Maintenance informationRICHARD LEMANSKYenergy_progress
06/22/2026Fire-Resistant Penetrations and JointsRICHARD LEMANSKYspecial
06/22/2026Mechanical SystemsRICHARD LEMANSKYspecial
06/22/2026Energy Code Compliance InspectionsRICHARD LEMANSKYprogress
06/22/2026FinalRICHARD LEMANSKYprogress
06/22/2026HVAC-R and service water heating equipmentRICHARD LEMANSKYenergy_progress
06/22/2026HVAC-R and service water heating system controlsRICHARD LEMANSKYenergy_progress
06/22/2026HVAC-R and service water piping design and insulationRICHARD LEMANSKYenergy_progress
06/12/2026Energy Code Compliance InspectionsRICHARD LEMANSKYprogress
06/12/2026HVAC-R and service water heating equipmentRICHARD LEMANSKYenergy_progress
06/12/2026HVAC-R and service water heating system controlsRICHARD LEMANSKYenergy_progress
06/12/2026HVAC-R and service water piping design and insulationRICHARD LEMANSKYenergy_progress
06/12/2026Maintenance informationRICHARD LEMANSKYenergy_progress
06/12/2026Fire-Resistant Penetrations and JointsRICHARD LEMANSKYspecial
06/09/2026HVAC-R and service water heating equipmentRICHARD LEMANSKYenergy_progress
06/09/2026HVAC-R and service water heating system controlsRICHARD LEMANSKYenergy_progress
06/09/2026Maintenance informationRICHARD LEMANSKYenergy_progress
06/09/2026HVAC-R and service water piping design and insulationRICHARD LEMANSKYenergy_progress
06/09/2026Heating SystemsRICHARD LEMANSKYspecial
06/08/2026Fire-Resistant Penetrations and JointsRICHARD LEMANSKYspecial
06/08/2026Sprinkler SystemsRICHARD LEMANSKYspecial
04/22/2026Maintenance informationRICHARD LEMANSKYenergy_progress
04/22/2026Fire-Resistant Penetrations and JointsRICHARD LEMANSKYspecial
04/22/2026MasonryRICHARD LEMANSKYspecial
04/22/2026Structural Stability – Alterations of existing buildingsRICHARD LEMANSKYspecial
Latest 25 of 114.
▾Documents — 85 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/19/2026S01242589-I1Request digital key ↗
08/16/2026S01125308-I1Request digital key ↗
08/16/2026S01125308-P2Request digital key ↗
Showing 3 of 17 on file for this type
▸Seals & Professional Certifications45
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/19/2026S01242589-I1Open ↗
08/16/2026S01125308-P1Open ↗
08/16/2026S01125308-P2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/18/2026S01092223-P2Open ↗
09/18/2026S01092223-P2Open ↗
09/18/2026S01092223-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/18/2026S01092223-P2Open ↗
09/18/2026S01092223-P2Open ↗
09/02/2026S01092223-S2Open ↗
Showing 3 of 12 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/16/2026S01125308-I1Open ↗
08/13/2026S01092223-I1Open ↗
08/13/2026S01092223-I1Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs17
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
08/16/2026S01125308-P2Open ↗
08/16/2026S01092223-P7Open ↗
08/16/2026S01092223-A1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDEP Variance (V5) letter1
08/13/2026S01092223-I1Open ↗