← Back
BuildNYC
Elevator cooperative
49 EAST 96TH STREET
MANHATTAN · BIN 1051443
💬 Discuss this project
1939Year Built
19Stories
D4Building Class
R10Zoning
141,058 sfGross Floor Area
80Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: 49 E 96th Realty · 10,183 sf lot · 13.85 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofRenovate existing commercial officeUnder Construction8p · 4 filings · 20 docs
BulkheadExterior Restoration1p · 1 filing · 4 docs
PenthouseUnit PHE1p · 1 filing · 4 docs
Floor 12Unit 12A2p · 1 filing · 2 docs
Floor 11
Floor 10Unit 10E11p · 4 filings · 20 docs
Floor 9
Floor 8
Floor 7Unit 7D12p · 3 filings · 17 docs
Floor 6
Floor 5Unit 5A3p · 2 filings · 4 docs
Floor 4
Floor 3
Floor 2
Floor 1Renovate existing commercial officeUnder Construction145p · 6 filings · 20 docs
CellarInterior Fit-out of Cafe Style Restaurant and Kitchen Eatery133p · 6 filings · 20 docs
Sub-BasementCommercial space removals7p · 1 filing · 11 docs
Site & exteriorExterior Restoration23p · 5 filings · 20 docs
Filed — no permit issued1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
49 East 96 St Realty7003/22/2026
John B. Lovett & Associates2807/08/2026
The Lovett Company1103/21/2026
Jerrick Associates203/21/2026
KTLJ103/21/2026
3 Guys Retsaurant103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Synergy Building Consultants203/21/2026
Kna Consulting403/21/2026
Lee Engineering Consulting403/21/2026
William Vitacco Associates1303/21/2026
BMB Building Consulting603/21/2026
Shalat Architects P C603/21/2026
Boutiqkey1203/21/2026
Municipal Building Consultants203/21/2026
Code203/21/2026
Leder-Luis Architectural Design303/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Nicon BuildGeneral Contractor907/08/2026
Aik RenovationGeneral Contractor807/08/2026
Everest ScaffoldingScaffold403/21/2026
DL Restoration & BuildersScaffold403/21/2026
A & B Contracting ServicesGeneral Contractor307/08/2026
Aerial Design Build ServicesGeneral Contractor303/21/2026
Ceprine ConstructionScaffold303/21/2026
Empire State Electric MaintenanceElectrical303/22/2026
Done Right Hood & Fire SAGeneral Contractor303/21/2026
Rock E Small Plumbing & HeatingPlumbing207/08/2026
360 General Contracting IGeneral Contractor207/08/2026
Adriatic Plumbing & HeatingPlumbing207/08/2026
R.J.C. MechanicalPlumbing207/08/2026
Warren Ostroff ElectricElectrical103/21/2026
Dynamic Blue Water MechanicalPlumbing107/08/2026
Ranco ElectricalElectrical103/21/2026
?Leonard SchiffmanElectrical103/21/2026
Y ElectricElectrical103/21/2026
Hundertmark RichardElectrical103/21/2026
Patriot ElectricElectrical103/21/2026
Pna ContractingGeneral Contractor107/08/2026
Denmar ElectricElectrical103/22/2026
Borowide Elect'l ContractorsElectrical103/22/2026
Accurate ElectricalElectrical103/21/2026
Nicon BuildScaffold107/08/2026
Avellino Electrical ContractingElectrical103/21/2026
Aqueduct MechanicalPlumbing107/08/2026
Pugliese FrankElectrical103/21/2026
Ranieri NicolaElectrical103/21/2026
High Beam ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sandeep Gunnala Engineering8482110/20/2026
BFS Architect7477211/10/2025
Tan Engineering12911304/21/2025
Domani Inspection Service843407/01/2024
Paradigm Architecture5931203/21/2024
Forum Engineering, P907101/19/2024
Prudigm Engineering Llcu4304112/21/2023
Shalat Architects2036305/23/2023
Building Lifecycle
All (221)Filed (41)Permit Issued (30)Signed Off (13)Facade (FISP) (12)Violation (60)Inspection (13)Objection (22)Special Inspection (30)
10/20/2026
Filed — Alteration
HEREWITH FILING FOR FACADE REPAIRS AS SHOWN ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01459511-I1
09/15/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Sandeep Gunnala
09/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
Sandeep Gunnala
09/15/2026
Special inspection requirement — Masonry
Sandeep Gunnala
09/14/2026
Special inspection requirement — Final
Sandeep Gunnala
06/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/27/2026
Permit issued — Plumbing
M01327639-I1-PL
03/16/2026
Permit issued — Plumbing
M00975403-I1-PL
03/02/2026
Filed — Alteration
MINOR ARCHITECTURAL WORK FILED IN CONJUNCTION WITH PLUMBING FOR GAS DRYER INSTALLATION FOR APARTMENT 5A.
M01338834-I1
03/02/2026
Special inspection requirement — Fenestration air leakage
03/02/2026
Special inspection requirement — Insulation placement and R values
01/29/2026
Permit issued — Plumbing
M01331680-I1-PL
12/22/2025
Special inspection requirement — Final
12/16/2025
Filed — Alteration
M01327639-I1
12/16/2025
Filed — Alteration
M01331680-I1
12/08/2025
Permit issued — Mechanical Systems
M01270625-S1-MS
12/05/2025
Permit issued — General Construction
M01270625-I1-GC
11/10/2025
Filed — Alteration
FILED HEREWITH FOR MACHINICAL WORK AS PER PLANS.
M01270625-S1
10/24/2025
Filed — Alteration
FILED HEREWITH FOR MACHINICAL WORK AS PER PLANS.
M01270625-I1
10/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
Belal Salim
10/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Belal Salim
10/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
Daniel Samton
10/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Daniel Samton
10/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
Daniel Samton
10/21/2025
Special inspection requirement — Mechanical Systems
Belal Salim
10/21/2025
Special inspection requirement — Final
Daniel Samton
10/08/2025
Permit issued — Mechanical Systems
M00975404-I1-MS
10/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/13/2025
Special inspection requirement — Tenant Protection Plan Compliance
Belal Salim
08/13/2025
Special inspection requirement — Interior lighting power
Daniel Samton
08/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Belal Salim
08/13/2025
Special inspection requirement — Final
Daniel Samton
07/31/2025
Permit issued — Plumbing
M00975403-I1-PL
06/25/2025
Permit issued — General Construction
M00975402-I1-GC
06/04/2025
Violation issued (HPD, closed)
A
04/22/2025
Special inspection requirement — Shutoff dampers
Roger Tan
04/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
04/22/2025
Special inspection requirement — Final
JOHN MCMONAGLE
04/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Roger Tan
04/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
04/22/2025
Special inspection requirement — Mechanical Systems
Roger Tan
04/22/2025
Special inspection requirement — Maintenance information
Roger Tan
04/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
04/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
04/21/2025
Filed — Alteration
Plumbing work as shown on plans. No change to use, egress or occupancy. (Daily Provisions)
M00979508-P6
04/15/2025
Special inspection requirement — Shutoff dampers
Roger Tan
04/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
04/15/2025
Special inspection requirement — Maintenance information
Roger Tan
04/14/2025
Permit issued — Plumbing
M00979508-S1-PL
08/12/2024
Filed — Alteration
Plumbing work as shown on plans. No change to use, egress or occupancy. (Daily Provisions)
M00979508-P5
07/01/2024
Filed — Alteration
Plumbing work as shown on plans. No change to use, egress or occupancy. (Daily Provisions)
M00979508-P3
07/01/2024
Signed off — Alteration
Foundation work as shown on plans filed herewith.
M01008479-S1
06/27/2024
Signed off — Alteration
M01023179-I1
06/20/2024
Filed — Alteration
Plumbing work as shown on plans. No change to use, egress or occupancy. (Daily Provisions)
M00979508-P4
06/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/14/2024
Signed off — Alteration
Foundation work as shown on plans filed herewith.
M01008479-I1
05/25/2024
Violation issued (HPD, closed)
C
05/25/2024
Violation issued (HPD, closed)
A
Latest 60 of 221 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAdriatic Plumbing & Heating05/27/2026
DOB NOWPlumbingPermit IssuedRock E Small Plumbing & Heating03/16/2026
DOB NOWPlumbingSigned-offAdriatic Plumbing & Heating01/29/2026
DOB NOWMechanical SystemsPermit Issued360 General Contracting I12/08/2025
DOB NOWGeneral ConstructionPermit Issued360 General Contracting I12/05/2025
DOB NOWMechanical SystemsPermit IssuedA B Contracting Services10/08/2025
DOB NOWPlumbingPermit IssuedRock E Small Plumbing & Heating07/31/2025
DOB NOWGeneral ConstructionSigned-offA B Contracting Services06/25/2025
DOB NOWPlumbingSigned-offR.J.C. Mechanical04/14/2025
DOB NOWStructuralSigned-offNicon Build04/12/2024
DOB NOWStructuralSigned-offNicon Build04/05/2024
DOB NOWFoundationSigned-offNicon Build04/05/2024
DOB NOWConstruction FencePermit IssuedNicon Build03/05/2024
DOB NOWMechanical SystemsSigned-offDone Right Hood & Fire SA02/28/2024
DOB NOWPlumbingSigned-offR.J.C. Mechanical02/02/2024
DOB NOWGeneral ConstructionSigned-offNicon Build01/26/2024
DOB NOWMechanical SystemsPermit IssuedNicon Build01/25/2024
DOB NOWPlumbingSigned-offAqueduct Mechanical06/02/2023
DOB NOWGeneral ConstructionSigned-offAerial Design Build Services05/25/2023
DOB NOWMechanical SystemsSigned-offAik Renovation05/08/2023
DOB NOWGeneral ConstructionSigned-offAik Renovation05/08/2023
DOB NOWGeneral ConstructionSigned-offPna Contracting02/07/2023
DOB NOWSidewalk ShedSigned-offCeprine Construction01/23/2023
DOB NOWPlumbingSigned-offSuper Plumbers11/28/2022
DOB NOWGeneral ConstructionSigned-offAik Renovation11/16/2022
DOB NOWMechanical SystemsSigned-offAik Renovation11/16/2022
DOB NOWSidewalk ShedSigned-offEverest Scaffolding08/22/2019
DOB NOWSupported ScaffoldSigned-offDL Restoration & Builders12/06/2018
DOB NOWSupported ScaffoldSigned-offDL Restoration & Builders11/09/2018
DOB NOWSidewalk ShedSigned-offEverest Scaffolding09/06/2018
BISPLISSUEDPipe Solutions Advis08/25/2023
BISOTISSUEDDL Restoration & Builders05/09/2019
BISOTISSUEDDL Restoration & Builders05/09/2019
BISOTISSUEDCoastal Points Construction04/29/2019
BISOTISSUEDDL Restoration & Builders10/10/2018
BISOTISSUEDDL Restoration & Builders10/01/2018
BISPLISSUEDAdriatic Plumbing & Heating08/24/2018
BISPLISSUEDWasoff Plumbing & Utility Co03/28/2018
BISOTISSUEDRise Construction Solutio01/25/2018
BISPLISSUEDAdriatic Plumbing & Heating01/25/2017
+ 40 more permits on file
2 projects · most recent 11/10/2025
Heating and Air Conditioning Systems Ventilation Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/10/2025Permit Issued360 General Contracting IHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PKFY-L06NLMU-A 6,000 BTU · Vrf Indoor ×20
MXZ-SM36NL 36,000 BTU · Condensing Unit ×4
PKFY-L04NLMU-A 4,000 BTU · Vrf Indoor ×4
Ventilation
Mitsubishi Electric LGH-F300RVX2-E 150 CFM · Erv ×4
04/21/2025Signed-offNicon BuildAir Conditioning Systems
Cooling
Lg ARNU243M1A4 24,200 BTU · Vrf Indoor ×10
ARNU363M2A4 36,000 BTU · Vrf Indoor ×5
ARUN072BSS5 69,000 BTU · Vrf Outdoor ×6
LAU090HSV5 9,000 BTU ×2
LSN090HSV5 9,000 BTU · Split System ×2
3 projects · most recent 04/21/2025
Water/Sanitary Gas Plumbing-Sprinkler
FiledStatusContractorScope
04/21/2025Signed-offGreat Oaks MechanicalGas, Plumbing-Sprinkler, Water/Sanitary
01/04/2024Permit IssuedNew Age Plumbing MechanicalGas, Water/Sanitary
08/06/2020——Water/Sanitary
24 projects · most recent 08/24/2026
General Wiring Lighting
FiledStatusContractorScope
08/24/2026Permit IssuedK.N.C. ElectricGeneral Wiring
06/10/2026CompleteEmpire State Electric MaintenanceGeneral Wiring, Lighting
05/21/2026Permit IssuedKwong Ming Electric80 meters, 1 new_meters
02/25/2026Permit IssuedKwong Ming ElectricGeneral Wiring
01/27/2026CompleteLuna NYC ElectricGeneral Wiring
11/22/2025CompleteY ElectricGeneral Wiring
07/09/2025CompleteDenmar ElectricGeneral Wiring
02/03/2025CompleteEmpire State Electric Maintenance—
05/30/2024CompleteEmpire State Electric MaintenanceGeneral Wiring
02/12/2024CompleteEmpire State Electric Maintenance—
02/12/2024CompleteEmpire State Electric MaintenanceGeneral Wiring, Lighting
11/29/2023CompletePaterny ElectricGeneral Wiring
09/07/2023CompleteDenmar Electric1 meters, 1 new_meters
06/26/2023CompleteJas Electrical ServicesGeneral Wiring
05/25/2023CompleteAttractive Lighting Electrical—
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
09/15/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/29/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/14/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/14/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/11/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/21/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/21/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 77
DateRequirementInspectorRole
09/15/2026MasonrySandeep Gunnalaspecial
09/15/2026Tenant Protection Plan ComplianceSandeep Gunnalaspecial
09/15/2026Structural Stability – Alterations of existing buildingsSandeep Gunnalaspecial
09/14/2026FinalSandeep Gunnalaprogress
03/02/2026Insulation placement and R values—energy_progress
03/02/2026Fenestration air leakage—energy_progress
12/22/2025Final—progress
10/22/2025HVAC-R and service water heating equipmentDaniel Samtonenergy_progress
10/22/2025HVAC-R and service water piping design and insulationDaniel Samtonenergy_progress
10/22/2025HVAC-R and service water heating system controlsDaniel Samtonenergy_progress
10/22/2025Fire-Resistant Penetrations and JointsBelal Salimspecial
10/22/2025Tenant Protection Plan ComplianceBelal Salimspecial
10/21/2025Mechanical SystemsBelal Salimspecial
10/21/2025FinalDaniel Samtonprogress
08/13/2025Interior lighting powerDaniel Samtonenergy_progress
08/13/2025Fire-Resistant Penetrations and JointsBelal Salimspecial
08/13/2025Tenant Protection Plan ComplianceBelal Salimspecial
08/13/2025FinalDaniel Samtonprogress
04/22/2025Mechanical SystemsRoger Tanspecial
04/22/2025HVAC-R and service water heating equipmentRoger Tanenergy_progress
04/22/2025HVAC-R and service water heating system controlsRoger Tanenergy_progress
04/22/2025Shutoff dampersRoger Tanenergy_progress
04/22/2025HVAC-R and service water piping design and insulationRoger Tanenergy_progress
04/22/2025FinalJOHN MCMONAGLEprogress
04/22/2025Energy Code Compliance InspectionsRoger Tanprogress
Latest 25 of 77.
▾Documents — 746 on file (BIS + DOB NOW)
▸Plans & Drawings42
▸DOB NOWPlans/Sketch38
10/21/2026M01459511-I1Request digital key ↗
09/06/2026M00074799-I1Request digital key ↗
09/06/2026M00096485-I1Request digital key ↗
Showing 3 of 38 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/06/2026M00096485-I1Request digital key ↗
08/15/2026M00096485-P2Request digital key ↗
08/15/2026M00096485-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/15/2026M00341926-I1Request digital key ↗
▸Applications & Permits124
▸BISWORK PERMIT APPLICATION62
08/28/2023103093297Open ↗
05/24/2019123834912Open ↗
04/29/2019123834912Open ↗
Showing 3 of 62 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION58
06/16/2023103093297Open ↗
01/13/2023110437787Open ↗
11/05/2021120463612Open ↗
Showing 3 of 58 on file for this type
▸BISPLACE OF ASSEMBLY3
05/10/2017122955926Open ↗
03/15/2017122955926Open ↗
Showing 2 of 3 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
05/10/2017122955926Open ↗
▸Seals & Professional Certifications225
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION88
03/13/2020123834912Open ↗
01/08/2020123127909Open ↗
01/08/2020123127909Open ↗
Showing 3 of 88 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature41
10/21/2026M01459511-I1Open ↗
09/06/2026M00074799-I1Open ↗
09/06/2026M00096485-P2Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWProgress Inspector Seal & Signature31
10/22/2026M01459511-I1Open ↗
09/01/2026M00979508-P6Open ↗
09/01/2026M00979508-P6Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
10/22/2026M01459511-I1Open ↗
10/22/2026M01459511-I1Open ↗
10/22/2026M01459511-I1Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST16
04/09/2019123834912Open ↗
04/04/2019123834912Open ↗
08/23/2018123127909Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
04/09/2019123834912Open ↗
04/04/2019123834912Open ↗
08/23/2018123127909Open ↗
Showing 3 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
06/30/2015140368466Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
06/30/2015140368466Open ↗
Showing 1 of 3 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/28/2020140911226Open ↗
▸Trade Schedules & Equipment63
▸BISSELF-CERT PLUMBING NOTICE19
07/06/2015122174912Open ↗
06/24/2015122174912Open ↗
05/27/2015121631001Open ↗
Showing 3 of 19 on file for this type
▸BISSCHEDULE B - PLUMBING17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE13
03/02/2020123834912Open ↗
02/21/2020123834912Open ↗
04/09/2019123834912Open ↗
Showing 3 of 13 on file for this type
▸BISEQUIPMENT USE PERMITS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection9
▸BISTenant Protection Plan and Notes5
09/27/2018123453486Open ↗
08/23/2018123127909Open ↗
01/25/2018123167241Open ↗
Showing 3 of 5 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00341926-I1Open ↗
▸Environmental & Asbestos61
▸DOB NOWDEP ACP-5: Asbestos Assessment Report30
10/21/2026M01459511-I1Open ↗
09/02/2026M00682624-I1Open ↗
09/02/2026M00682383-I1Open ↗
Showing 3 of 30 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
04/04/2019123834912Open ↗
08/23/2018123127909Open ↗
01/25/2018123167241Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance35
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS19
01/08/2020123127909Open ↗
01/08/2020123127909Open ↗
04/09/2019123834912Open ↗
Showing 3 of 19 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
03/13/2020123834912Open ↗
01/08/2020123127909Open ↗
08/07/2018123167241Open ↗
Showing 3 of 9 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
06/30/2015140368466Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/02/2022122273798Open ↗
05/02/2022122273798Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026M00765363-I1Open ↗
08/13/2026M00682624-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/02/2022122273798Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY9
07/25/2023103093297Open ↗
05/02/2022122273798Open ↗
05/02/2022122273798Open ↗
Showing 3 of 9 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
07/25/2023103093297Open ↗
07/24/2023103093297Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
03/13/2020123834912Open ↗
03/13/2020123834912Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/05/2021120463612Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
03/13/2020123834912Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
05/10/2017122955926Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
07/11/2023103093297Open ↗
▸Approvals, Objections & Sign-offs57
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST25
01/17/2023110437787Open ↗
05/03/2022122273798Open ↗
11/04/2021120463612Open ↗
Showing 3 of 25 on file for this type
▸BISADMINISTRATIVE OBJECTIONS19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
06/16/2023103093297Open ↗
03/16/2017122699650Open ↗
09/09/2016121631001Open ↗
Showing 3 of 7 on file for this type
▸BISCCD1-Construction Code Determination3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSUPERSEDING LETTER1
08/28/2023103093297Open ↗
▸BISFINAL1
11/05/2021120463612Open ↗
▸BISCONSTRUCTION (OT) SIGNOFF1
07/11/2023103093297Open ↗
▸Cost, Insurance & Ownership56
▸BISCOST AFFIDAVIT50
07/19/2023103093297Open ↗
08/28/2020140911226Open ↗
03/13/2020123834912Open ↗
Showing 3 of 50 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT4
10/01/2018123453486Open ↗
05/24/2016122699650Open ↗
12/09/2015122273798Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
05/02/2022122273798Open ↗
11/05/2021120463612Open ↗
▸Filing & Intake Forms51
▸BISEFILING COVER SHEET27
04/09/2019123834912Open ↗
04/04/2019123834912Open ↗
09/25/2018123453486Open ↗
Showing 3 of 27 on file for this type
▸BISADDITIONAL INFORMATION13
05/22/2019123453486Open ↗
11/02/2018123453486Open ↗
09/01/2017122829038Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM7
08/28/2023103093297Open ↗
03/13/2020123834912Open ↗
02/21/2020123834912Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
08/28/2020140911226Open ↗
06/30/2015140368466Open ↗
Showing 2 of 4 on file for this type
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type