← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
49 MERCER STREET
MANHATTAN · BIN 1007041
💬 Discuss this project
1873Year Built
7Stories
RMBuilding Class
M1-5/R7XZoning
30,300 sfGross Floor Area
6Units
LL97 CoveredRent Stabilized3 Active Violations 1 unresolved · 2 paperwork only 3 likely answered ▸
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 5,017 sf lot · 6.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofExterior and interior renovation of 6th floor, penthouse, anUnder Construction75p · 2 filings · 20 docs
BulkheadExterior and interior renovation of 6th floor, penthouse, anUnder Construction4p · 1 filing · 20 docs
PenthouseStudio MBM, Unit PH1, Unit PH4Under Construction79p · 3 filings · 20 docs
Floor 6Studio MBMUnder Construction82p · 3 filings · 20 docs
Floor 5
Floor 4Under Construction12p · 1 filing · 20 docs
Floor 3
Floor 2
Floor 1Toteme, Acne Studios44p · 10 filings · 20 docs
CellarToteme32p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DL Mercer3503/21/2026
AZ Mercer2503/21/2026
West 54th Street807/08/2026
47 Mercer Street Condominium603/21/2026
Mercer Station103/22/2026
Schimenti103/22/2026
47 Mercer103/21/2026
Grand Mercer103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Gregg Rothstein Architect303/21/2026
J.A.M. Associates2403/21/2026
Code1403/21/2026
Municipal Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Certified of N.YGeneral Contractor1307/15/2026
FolorGeneral Contractor507/08/2026
Reliable EnterprisesScaffold407/08/2026
KG SprinklerFire Protection407/08/2026
GDC ContractingGeneral Contractor207/04/2026
Henry Myers P & HPlumbing207/08/2026
A&A PlumbingPlumbing107/08/2026
Bass ElectricalElectrical103/22/2026
PSI PartnersFire Protection107/08/2026
C. B. ElectricElectrical103/21/2026
Crosswire ElectricalElectrical103/22/2026
Phong ElectricElectrical103/21/2026
Schimenti Construction CoGeneral Contractor107/08/2026
L.S. Sign CoSign hanger107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Forum Engineering, P907112/17/2025
Ryan Special Engineering2018312/17/2025
Cheung Showman Architects7598509/19/2025
Kadan5956207/22/2025
HT Engineering6274511/12/2024
Iva Filipovic Architect3142111/07/2023
Rosini Engineering3282402/06/2023
Chen Engineering Services1826201/13/2022
Building Lifecycle
All (184)Filed (27)Permit Issued (28)Signed Off (8)Violation (47)Inspection (14)Objection (30)Special Inspection (30)
07/14/2026
Permit issued — Mechanical Systems
M00958057-S2-MS
07/03/2026
Violation issued (HPD, open)
B
07/02/2026
Permit issued — Mechanical Systems
M01327499-S2-MS
07/01/2026
Permit issued — General Construction
M01327499-I1-GC
05/05/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/22/2026
Permit issued — General Construction
M00958057-I1-GC
03/03/2026
Objection resolved — Addressed
03/03/2026
Objection resolved — Addressed
03/03/2026
Objection resolved — Addressed
03/02/2026
Objection resolved — Addressed
03/02/2026
Objection resolved — Addressed
03/02/2026
Objection resolved — Addressed
03/02/2026
Objection resolved — Addressed
03/02/2026
Objection resolved — Addressed
01/27/2026
Permit issued — General Construction
M01005828-I1-GC
12/29/2025
Objection raised — Admin
12/29/2025
Objection raised — Admin
12/29/2025
Objection raised — Cost
12/26/2025
Objection raised — Scope
12/26/2025
Objection raised — Scope
12/26/2025
Objection raised — Energy
12/26/2025
Objection raised — Scope
12/26/2025
Objection raised — Admin
12/26/2025
Objection raised — Scope
12/26/2025
Objection raised — Admin
12/17/2025
Filed — Alteration
Remodel 4th floor JLWQA. Mechanical and Plumbing filed as subsequent documents. No change in use, egress or occupancy.
M01327499-S2
12/12/2025
Filed — Alteration
Remodel 4th floor JLWQA. Mechanical and Plumbing filed as subsequent documents. No change in use, egress or occupancy.
M01327499-S1
12/11/2025
Filed — Alteration
Remodel 4th floor JLWQA. Mechanical and Plumbing filed as subsequent documents. No change in use, egress or occupancy.
M01327499-I1
12/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
William Ryan
12/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Alexander Rodsen
12/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
William Ryan
12/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
William Ryan
12/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Rodsen
12/05/2025
Special inspection requirement — Maintenance information
Alexander Rodsen
12/02/2025
Special inspection requirement — Final
Alexander Rodsen
12/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
12/02/2025
Special inspection requirement — Final
SCOTT DEVERE
12/02/2025
Special inspection requirement — Mechanical Systems
Alexander Rodsen
10/30/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/24/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/23/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/21/2025
Permit issued — Sprinklers
M00958057-S4-EW-SP
10/21/2025
Permit issued — Sprinklers
M01022056-I1-EW-SP
10/21/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/20/2025
Permit issued — Plumbing
M00958057-S3-PL
10/14/2025
Special inspection requirement — Energy Code Compliance Inspections
George Showman
10/14/2025
Special inspection requirement — Final
George Showman
10/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
IVA FILIPOVIC
10/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
George Showman
09/19/2025
Filed — Alteration
Exterior and interior renovation of 6th Fl JLWQA, penthouse and private terrace. No change to use, occupancy, or egress.
M00958057-P4
09/19/2025
Special inspection requirement — Energy Code Compliance Inspections
George Showman
09/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
George Showman
09/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/19/2025
Special inspection requirement — Final
George Showman
09/03/2025
Permit issued — Structural
M00958057-S1-ST
08/18/2025
Violation issued (ECB, closed)
Elevators
08/17/2025
Special inspection requirement — Final
GEORGE OZAETA
08/17/2025
Special inspection requirement — Structural Cold-Formed Steel
GEORGE OZAETA
08/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE OZAETA
08/17/2025
Special inspection requirement — Post-installed Anchors
GEORGE OZAETA
Latest 60 of 184 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCertified of N.Y07/14/2026
DOB NOWMechanical SystemsPermit IssuedGDC Contracting07/02/2026
DOB NOWGeneral ConstructionPermit IssuedGDC Contracting07/01/2026
DOB NOWGeneral ConstructionPermit IssuedCertified of N.Y04/22/2026
DOB NOWGeneral ConstructionPermit IssuedCertified of N.Y01/27/2026
DOB NOWSprinklersPermit IssuedH M Sprinkler10/21/2025
DOB NOWSprinklersPermit IssuedH M Sprinkler10/21/2025
DOB NOWPlumbingPermit IssuedHenry Myers P & H10/20/2025
DOB NOWStructuralPermit IssuedCertified of N.Y09/03/2025
DOB NOWMechanical SystemsPermit IssuedCertified of N.Y07/16/2025
DOB NOWGeneral ConstructionPermit IssuedCertified of N.Y04/29/2025
DOB NOWGeneral ConstructionPermit IssuedCertified of N.Y02/13/2025
DOB NOWStructuralPermit IssuedCertified of N.Y10/02/2024
DOB NOWPlumbingPermit IssuedHenry Myers P & H07/16/2024
DOB NOWMechanical SystemsPermit IssuedCertified of N.Y07/03/2024
DOB NOWSprinklersPermit IssuedH M Sprinkler06/26/2024
DOB NOWSprinklersPermit IssuedH M Sprinkler06/26/2024
DOB NOWGeneral ConstructionPermit IssuedCertified of N.Y05/21/2024
DOB NOWGeneral ConstructionPermit IssuedCertified of N.Y03/15/2024
DOB NOWStructuralSigned-offFolor03/14/2022
DOB NOWSprinklersSigned-offMora Fire Protection03/08/2022
DOB NOWMechanical SystemsSigned-offFolor02/24/2022
DOB NOWPlumbingSigned-offA&A Plumbing02/19/2022
DOB NOWGeneral ConstructionSigned-offFolor01/19/2022
DOB NOWSidewalk ShedSigned-offReliable Enterprises11/12/2021
DOB NOWSupported ScaffoldSigned-offReliable Enterprises11/10/2021
DOB NOWSignPermit IssuedWeinfeld, Elliot05/26/2021
DOB NOWGeneral ConstructionSigned-offSchimenti Construction Co04/05/2021
BISPLISSUEDTop Plumbing Group11/17/2016
BISOTISSUEDTCM09/21/2016
BISPLISSUEDGreat City Plumbing09/08/2016
BISOTISSUEDTCM08/29/2016
BISEQISSUEDBrenmac Construction08/01/2014
BISPLISSUEDMarathon Mechanical01/10/2012
BISOTISSUEDTatras Construction01/09/2012
BISEQISSUEDPhoenix Bridging01/03/2012
BISEQISSUEDPhoenix Bridging12/28/2011
BISOTISSUEDJepol Construction08/15/2011
BISEQISSUEDPhoenix Bridging08/12/2011
BISEQISSUEDPhoenix Bridging08/09/2011
+ 38 more permits on file
1 project · most recent 09/19/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/19/2025Permit IssuedCertified of N.YHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PEFY-P24NAMU-E4 25,934 BTU · Vrf Indoor ×2
MXZ-SM36NAMHZ2 42,000 BTU · Condensing Unit ×1
MXZ-SM48NAMHZ2 54,000 CFM · Condensing Unit ×1
MXZ-SM60NAM2 66,000 BTU · Condensing Unit ×1
PEFY-P36NAMU-E4 34,583 BTU · Vrf Indoor ×1
PEFY-P72NMHSU-E 37,703 BTU · Vrf Indoor ×1
PKA-A12LA 10,600 BTU · Heat Pump Outdoor ×1
PUZ-A12NKA7 18,000 BTU · Condensing Unit ×1
Ventilation
Ortal VERTICAL POWER VENT SYSTEM 250 CFM ×1
2 projects · most recent 09/19/2025
Sprinkler System
FiledStatusContractorScope
09/19/2025Permit IssuedKG SprinklerSprinkler System
11/12/2024Permit IssuedKG Sprinkler26 heads
2 projects · most recent 12/17/2025
Gas Water/Sanitary
FiledStatusContractorScope
12/17/2025——Gas, Water/Sanitary
09/19/2025Permit IssuedHenry Myers P & HGas, Water/Sanitary
5 projects · most recent 09/25/2025
General Wiring
FiledStatusContractorScope
09/25/2025CompleteBass ElectricalGeneral Wiring
04/03/2025CompleteAll Ways Electric Corp.w—
02/02/2022CompleteElpo Electrical ContgGeneral Wiring
11/16/2021Permit IssuedRichard Neu—
04/16/2021CompleteCrosswire ElectricalGeneral Wiring
1 project · most recent 09/19/2025
Steel
FiledStatusContractorScope
09/19/2025Permit IssuedCertified of N.YSteel
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
05/05/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/23/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/21/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/13/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/05/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/31/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/28/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/26/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/26/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/31/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
12/11/2025Tenant Protection Plan ComplianceWilliam Ryanspecial
12/05/2025HVAC-R and service water piping design and insulationAlexander Rodsenenergy_progress
12/05/2025Tenant Protection Plan ComplianceWilliam Ryanspecial
12/05/2025Tenant Protection Plan ComplianceWilliam Ryanspecial
12/05/2025Fire-Resistant Penetrations and JointsAlexander Rodsenspecial
12/05/2025Maintenance informationAlexander Rodsenenergy_progress
12/02/2025FinalAlexander Rodsenprogress
12/02/2025Fire-Resistant Penetrations and JointsWilliam Ryanspecial
12/02/2025FinalSCOTT DEVEREprogress
12/02/2025Mechanical SystemsAlexander Rodsenspecial
10/14/2025Energy Code Compliance InspectionsGeorge Showmanprogress
10/14/2025FinalGeorge Showmanprogress
10/14/2025Tenant Protection Plan ComplianceIVA FILIPOVICspecial
10/14/2025Fire-Resistant Penetrations and JointsGeorge Showmanspecial
09/19/2025Energy Code Compliance InspectionsGeorge Showmanprogress
09/19/2025Fire-Resistant Penetrations and JointsGeorge Showmanspecial
09/19/2025Tenant Protection Plan Compliance—special
09/19/2025FinalGeorge Showmanprogress
08/17/2025FinalGEORGE OZAETAprogress
08/17/2025Structural Cold-Formed SteelGEORGE OZAETAspecial
08/17/2025Structural Stability – Alterations of existing buildingsGEORGE OZAETAspecial
08/17/2025Post-installed AnchorsGEORGE OZAETAspecial
08/17/2025Structural Steel - DetailsGEORGE OZAETAspecial
08/17/2025Structural Steel - WeldingGEORGE OZAETAspecial
08/17/2025Structural Steel - High Strength BoltingGEORGE OZAETAspecial
Latest 25 of 57.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Studio MBMArts / Culture / EntertainmentFloor 6, Penthouse
Project M01022056 Alteration · Permit Entire · 04/19/2024
TotemeRetailCellar, Floor 1
Project M00634858 Alteration · LOC Issued · 01/13/2022
Project M00634839 Alteration · LOC Issued · 01/12/2022
Project M00634846 Alteration · LOC Issued · 01/12/2022
Project M00634851 Alteration · LOC Issued · 01/12/2022
Project M00634815 Alteration · LOC Issued · 01/11/2022
Acne StudiosRetailFloor 1
Project M00480220 Alteration · LOC Issued · 03/17/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 298 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch27
09/04/2026M00480220-I1Request digital key ↗
09/03/2026M00481136-I1Request digital key ↗
09/03/2026M00628472-I1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
09/03/2026M00637150-I1Request digital key ↗
▸Applications & Permits51
▸DOB NOWLPC Approval/Permit20
09/03/2026M00634815-I1Open ↗
09/03/2026M00634839-I1Open ↗
09/03/2026M00634846-I1Open ↗
Showing 3 of 20 on file for this type
▸BISWORK PERMIT APPLICATION19
12/13/2016122841452Open ↗
10/11/2016122841452Open ↗
10/11/2016122841452Open ↗
Showing 3 of 19 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION12
01/17/2024120084069Open ↗
01/16/2024104170594Open ↗
11/17/2016122841452Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications103
▸DOB NOWDPL-1: Design Professional Seal & Signature28
09/04/2026M00480220-I1Open ↗
09/03/2026M00628472-I1Open ↗
09/03/2026M00628473-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
10/19/2026M00634851-P1Open ↗
09/28/2026M01005828-I1Open ↗
09/24/2026M01327499-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
09/28/2026M01005828-I1Open ↗
09/28/2026M01005828-I1Open ↗
09/24/2026M01327499-I1Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION20
05/08/2017122841452Open ↗
05/08/2017122841452Open ↗
07/28/2016122841452Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
08/16/2011120786391Open ↗
08/15/2011120786300Open ↗
06/15/2010120377877Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
08/16/2011120786391Open ↗
08/15/2011120786300Open ↗
06/15/2010120377877Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/31/2014140233744Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/31/2014140233744Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/31/2014140233744Open ↗
▸Trade Schedules & Equipment8
▸BISSELF-CERT PLUMBING NOTICE3
04/26/2012120940107Open ↗
02/23/2012120940107Open ↗
05/19/2009110154136Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
11/17/2016122841452Open ↗
10/13/2016122841452Open ↗
07/28/2016122841452Open ↗
▸BISSCHEDULE B - PLUMBING2
01/10/2012120940107Open ↗
05/07/2008110154136Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
07/28/2016122841452Open ↗
▸Environmental & Asbestos35
▸DOB NOWDEP ACP-5: Asbestos Assessment Report24
09/04/2026M00480220-I1Open ↗
09/03/2026M00634815-I1Open ↗
09/03/2026M00634839-I1Open ↗
Showing 3 of 24 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
01/10/2012120940107Open ↗
08/16/2011120786391Open ↗
06/29/2011120741135Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/28/2016122841452Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
08/15/2011120786300Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
05/08/2017122841452Open ↗
08/12/2016122841452Open ↗
07/28/2016122841452Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
05/08/2017122841452Open ↗
01/29/2013120940107Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
01/29/2024120084069Open ↗
01/29/2024120084069Open ↗
07/31/2014140233744Open ↗
▸Approvals, Objections & Sign-offs29
▸BISLANDMARKS APPROVAL7
08/26/2016122841452Open ↗
07/31/2014140233744Open ↗
01/10/2012120940107Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
08/16/2011120786391Open ↗
08/15/2011120786300Open ↗
06/29/2011120741135Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
01/29/2024120084069Open ↗
05/08/2017122841452Open ↗
04/01/2013120786391Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS4
04/01/2013120786300Open ↗
04/01/2013120786300Open ↗
04/01/2013120786391Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
12/13/2016122841452Open ↗
01/05/2012120786300Open ↗
01/05/2012120786391Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
09/03/2026M00628472-I1Open ↗
09/03/2026M00628473-I1Open ↗
▸BISLANDMARKS SIGNOFF1
01/29/2024120084069Open ↗
▸BISFINAL1
01/29/2024120084069Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT10
05/08/2017122841452Open ↗
07/28/2016122841452Open ↗
01/29/2013120940107Open ↗
Showing 3 of 10 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/16/2024120084069Open ↗
▸Filing & Intake Forms13
▸BISEFILING COVER SHEET8
07/28/2016122841452Open ↗
01/10/2012120940107Open ↗
08/16/2011120786391Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION3
10/17/2016122841452Open ↗
01/10/2012120940107Open ↗
08/04/2011120741135Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/31/2014140233744Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026M00634839-P1Open ↗
▸Other Documents9
▸DOB NOWProof of Historic Building9
09/03/2026M00634815-I1Open ↗
09/03/2026M00634839-I1Open ↗
09/03/2026M00634846-I1Open ↗
Showing 3 of 9 on file for this type