← Back
Two stories - detached, small or mid-size
49 WEED AVENUE
STATEN ISLAND · New Dorp-Midland Beach · BIN 5055786
💬 Discuss this project
1935Year Built
2Stories
A1Building Class
R3-1Zoning
1,800 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,050 sf lot · 0.36 FAR built · Flood zone X500
Locations of Work
Electrical
Roof4p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC106/29/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272106/29/2026
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Inspection (1)Special Inspection (5)
08/13/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/01/2026
Permit issued — Solar
S01420379-I1-SL
06/29/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01420379-I1
06/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
06/29/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
06/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
06/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
06/22/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC07/01/2026
1 project · most recent 06/29/2026
FiledStatusContractorScope
06/29/2026CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 06/29/2026
FiledStatusContractorScope
06/29/2026Signed-offSUNRUN INSTALLATION SVC20 panels, 9 kw, 420.45 roof_area_sqft
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/13/2026Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/29/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
06/29/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
06/22/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
06/22/2026Energy Code Compliance InspectionsWalid Abdullaprogress
06/22/2026FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026S01420379-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026S01420379-I1Open ↗
09/01/2026S01420379-I1Open ↗
09/01/2026S01420379-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026S01420379-I1Open ↗
09/01/2026S01420379-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026S01420379-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026S01420379-I1Open ↗