Office with commercial, 7-19 stories
49 WEST 24 STREET
MANHATTAN · BIN 1015592
💬 Discuss this project
1915Year Built
11Stories
O6Building Class
M1-8A/R11Zoning
41,800 sfGross Floor Area
13Units
LL97 CoveredRent Stabilized14 Open Violations 13 unresolved · 1 paperwork only ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: 49 W 24 ST TENANTS CORP. · 4,551 sf lot · 9.18 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof2p · 1 filing · 2 docs
Floor 1013p · 5 filings · 20 docs
Floor 95p · 3 filings · 20 docs
Floor 82p · 1 filing · 2 docs
Floor 73p · 1 filing · 2 docs
Floor 63p · 2 filings · 4 docs
Floor 52p · 1 filing · 2 docs
Floor 46p · 3 filings · 7 docs
Floor 32p · 1 filing · 2 docs
Floor 213p · 6 filings · 18 docs
Floor 1Under Construction19p · 2 filings · 20 docs
Mezzanine1p · 1 filing · 2 docs
CellarUnder Construction20p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
T C DESIGN707/08/2026
CANIDO BASONAS CONSTRUCTION607/08/2026
49 W 24 ST TENANTS3203/22/2026
WINOKER REALTY203/22/2026
49 WEST 24 TENANTS CORP403/22/2026
49 W 24 TENANTS CORP203/22/2026
OWNER OF PREMISES 49 W 24103/22/2026
BUCHBINDER AND WARKEN LLC103/22/2026
49 W 37 ST REALTY CO103/22/2026
OWNER OF 49 WEST 24 STREE103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING803/21/2026
LAM & LAM ENGINEERING D.P.C.603/21/2026
LAM & LAM DESIGNS DPC203/21/2026
RAYMOND HO ARCHITECT1203/21/2026
WALTER T GORMAN PE203/21/2026
BASIC GROUPS403/21/2026
ACA ASSOCIATES103/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PHOENIX SUTTON STR INCGeneral Contractor907/08/2026
EMPRISE CONSTRUCTION INCGeneral Contractor807/08/2026
CANIDO BASONAS CONSTRUCTIGeneral Contractor407/08/2026
SWE DEVELOPMENT CORPGeneral Contractor307/08/2026
CANIDO BASONAS CONST SVCGeneral Contractor303/21/2026
VMC PLUMBING & HEATING INPlumbing207/08/2026
BHA CONSULTANTS LLCGeneral Contractor207/08/2026
CASTILLO JR, JORGEElectrical103/21/2026
AMERICAN STANDARD PLUMBING &Fire Protection107/08/2026
RONALD TESTA, JR.Electrical103/21/2026
KRSLOVIC, ANTEElectrical103/21/2026
FLO RESTORATION INCGeneral Contractor107/08/2026
INNER CITY CONTRACTINGElectrical103/21/2026
PREMIER SANITATION LLCGeneral Contractor107/08/2026
C SCHLOSBERG INCElectrical103/21/2026
WING JAY CONSTRUCTION INCGeneral Contractor104/09/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
HUDSON PLMBING & MCH, LLCPlumbing107/08/2026
CASE PLUMBING LLCFire Protection107/04/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARNOLD MONTAG ARCHITECT,4599404/13/2026
NIC DESIGN INC9758102/06/2026
LAM&LAM DESIGNS DPC3563412/15/2025
NIC 88 CORP8371105/20/2025
RAYMOND HO ARCHITECT, PLL1654510/05/2023
GOLDMAN COPELAND ASSOCIAT2826307/08/2022
SPECIAL TESTING & CONSULT1688104/08/2022
AK ENGINEERING PC678105/14/2021
Building Lifecycle
All (204)Filed (28)Permit Issued (29)Signed Off (7)Facade (FISP) (15)Violation (60)Inspection (15)Objection (20)Special Inspection (30)
09/01/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/14/2026
Cycle 10 facade report submitted
08/11/2026
Signed off — Alteration
Filing for facade repairs as per plans filed herewith. No change in use, occupancy or egress.
M00693834-I1
08/04/2026
Signed off — Alteration
Interior alteration for wig manufacturing and accessory use offices.
M01244583-I1
08/03/2026
Cycle 10 facade report signed — SWARMP
06/23/2026
Cycle 10 facade inspection completed
04/14/2026
Special inspection requirement — Interior lighting power
Arnold Montag
04/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Arnold Montag
04/14/2026
Special inspection requirement — Lighting controls
Arnold Montag
04/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Arnold Montag
04/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
Arnold Montag
04/13/2026
Filed — Alteration
Interior alteration for wig manufacturing and accessory use offices.
M01244583-P1
04/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/23/2026
Violation issued (FDNY_ORDER, closed)
03/23/2026
Violation issued (FDNY_NOV, closed)
03/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
Arnold Montag
03/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Arnold Montag
03/16/2026
Special inspection requirement — Interior lighting power
Arnold Montag
03/16/2026
Special inspection requirement — Lighting controls
Arnold Montag
03/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Arnold Montag
03/12/2026
Permit issued — Plumbing
M01244583-S2-PL
03/12/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
03/11/2026
Permit issued — Sprinklers
M01226986-I1-EW-SP
03/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/11/2026
Filed — Alteration
Interior alteration for wig manufacturing and accessory use offices.
M01244583-S1
02/11/2026
Filed — Alteration
Interior alteration for wig manufacturing and accessory use offices.
M01244583-S2
02/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Arnold Montag
02/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
Arnold Montag
02/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
Arnold Montag
02/10/2026
Special inspection requirement — Maintenance information
Arnold Montag
02/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
Arnold Montag
02/10/2026
Special inspection requirement — Duct leakage testing, insulation and design
Arnold Montag
02/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
Arnold Montag
02/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Arnold Montag
02/10/2026
Special inspection requirement — Maintenance information
Arnold Montag
02/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Arnold Montag
02/10/2026
Special inspection requirement — Shutoff dampers
Arnold Montag
02/06/2026
Filed — Alteration
M01226986-I1
02/04/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/08/2026
Permit issued — Sprinklers
M01191955-S5-EW-SP
12/24/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/15/2025
Filed — Alteration CO
MODIFY EXISTING SPRINKLER SYSTEM FOR CELLAR AND 1ST FLOOR.
M01191955-P1
12/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Lam
12/12/2025
Filed — Alteration CO
MODIFY EXISTING SPRINKLER SYSTEM FOR CELLAR AND 1ST FLOOR.
M01191955-S5
12/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Lam
11/18/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/18/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/05/2025
Special inspection requirement — Sprinkler Systems
Benjamin Lam
10/15/2025
Permit issued — Plumbing
M01191955-S4-PL
09/25/2025
Filed — Alteration CO
MODIFY EXISTING SPRINKLER SYSTEM FOR CELLAR AND 1ST FLOOR.
M01191955-S4
08/04/2025
Permit issued — General Construction
M01244583-I1-GC
07/10/2025
Special inspection requirement — Mechanical Systems
Arnold Montag
07/10/2025
Special inspection requirement — Final
Arnold Montag
07/09/2025
Permit issued — Plumbing
M00934903-I1-PL
07/09/2025
Permit issued — Mechanical Systems
M00934911-I1-MS
07/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Latest 60 of 204 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM. SPINELLI PLB & HTG INC03/12/2026
DOB NOWSprinklersPermit IssuedS & L PLUMBING INC03/11/2026
DOB NOWSprinklersPermit IssuedAMERICAN STANDARD PLUMBIN01/08/2026
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.10/15/2025
DOB NOWGeneral ConstructionSigned-offEMPRISE CONSTRUCTION INC08/04/2025
DOB NOWPlumbingPermit IssuedM. SPINELLI PLB & HTG INC07/09/2025
DOB NOWMechanical SystemsPermit IssuedEMPRISE CONSTRUCTION INC07/09/2025
DOB NOWGeneral ConstructionSigned-offEMPRISE CONSTRUCTION INC05/28/2025
DOB NOWGeneral ConstructionPermit IssuedWING JAY CONSTRUCTION INC05/08/2025
DOB NOWStructuralSigned-offEMPRISE CONSTRUCTION INC09/11/2024
DOB NOWGeneral ConstructionPermit IssuedEMPRISE CONSTRUCTION INC09/28/2023
DOB NOWGeneral ConstructionSigned-offEMPRISE CONSTRUCTION INC09/01/2023
DOB NOWGeneral ConstructionSigned-offPREMIER SANITATION LLC08/01/2023
DOB NOWStructuralSigned-offBHA CONSULTANTS LLC10/06/2022
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC08/03/2022
DOB NOWGeneral ConstructionPermit IssuedSWE DEVELOPMENT CORP07/18/2022
DOB NOWMechanical SystemsPermit IssuedSWE DEVELOPMENT CORP07/18/2022
DOB NOWGeneral ConstructionPermit IssuedSWE DEVELOPMENT CORP06/14/2022
DOB NOWGeneral ConstructionSigned-offCANIDO BASONAS CONST SVC04/15/2022
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC03/18/2022
DOB NOWStructuralSigned-offBHA CONSULTANTS LLC10/12/2021
DOB NOWGeneral ConstructionPermit IssuedFLO RESTORATION INC07/21/2021
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC03/26/2021
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC03/30/2020
DOB NOWSupported ScaffoldPermit IssuedCANIDO BASONAS CONSTRUCTI07/01/2019
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC03/21/2019
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC11/02/2018
DOB NOWSupported ScaffoldPermit IssuedCANIDO BASONAS CONSTRUCTI06/26/2018
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC05/24/2018
BISOTISSUEDEMPRISE CONSTRUCTION INC09/03/2024
BISOTISSUEDEMPRISE CONSTRUCTION INC02/16/2024
BISOTISSUEDBHA CONSULTANTS LLC07/08/2021
BISOTISSUEDBHA CONSULTANTS LLC04/16/2021
BISPLISSUEDCOPPER PLUMBING INC04/10/2019
BISOTISSUEDCANIDO BASONAS CONSTRUCTI04/01/2019
BISOTISSUEDKGUK CORP03/16/2019
BISOTISSUEDAGGRESSIVE HEATING INC10/19/2018
BISPLISSUEDWARD PLUMBING CORP10/19/2018
BISOTISSUEDCANIDO BASONAS CONSTRUCTI06/15/2018
BISPLISSUEDAAA TOTAL PLUMBING, INC01/25/2018
+ 39 more permits on file
1 project · most recent 04/18/2023
Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
04/18/2023——Associated Ducts and Piping
Ducts & Piping
N/A NA 144,000 BTU · Ductwork ×1
2 projects · most recent 12/15/2025
Sprinkler System
FiledStatusContractorScope
12/15/2025Permit IssuedAMERICAN STANDARD PLUMBINSprinkler System
07/08/2022——10 heads
2 projects · most recent 12/15/2025
Water/Sanitary Gas
FiledStatusContractorScope
12/15/2025Permit IssuedAMERICAN STANDARD P&H CORGas, Water/Sanitary
07/08/2022Signed-offHUDSON PLMBING & MCH, LLCWater/Sanitary
9 projects · most recent 07/02/2026
General Wiring Lighting
FiledStatusContractorScope
07/02/2026CompleteJAM ELECTRICAL CORP—
10/06/2025Permit IssuedW 8 ELECTRIC CORPGeneral Wiring
06/30/2025Permit IssuedKJK ELECTRIC INCGeneral Wiring
06/16/2022CompleteEMELEC ELECTRIC CORPGeneral Wiring
04/02/2021Permit IssuedR.C.M. ELECTRIC CORP.—
10/11/2019Permit IssuedUNITED ELEC'L CONT'G CORPGeneral Wiring
05/07/2018CompleteELPO ELECTRICAL CONTG INC—
03/14/2018CancelledMEGA ELEC'L CONTR'G, INC—
12/22/2017CompleteAERO ELECTRIC CORPGeneral Wiring, Lighting
1 project · most recent 07/06/2022
FiledStatusContractorScope
07/06/2022Permit IssuedSWE DEVELOPMENT CORP1 scope_items
1 project · most recent 06/26/2018
Scaffold
FiledStatusContractorScope
06/26/2018Permit IssuedCANIDO BASONAS CONSTRUCTIScaffold
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
09/01/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/12/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/24/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/24/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/25/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/22/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/16/2023Pass-Final PL - UndergroundPassView ↗
08/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
04/14/2026Fire-Resistant Penetrations and JointsArnold Montagspecial
04/14/2026Interior lighting powerArnold Montagenergy_progress
04/14/2026Lighting controlsArnold Montagenergy_progress
04/14/2026Fire-Resistance Rated ConstructionArnold Montagprogress
04/14/2026Energy Code Compliance InspectionsArnold Montagprogress
03/16/2026Fire-Resistant Penetrations and JointsArnold Montagspecial
03/16/2026Interior lighting powerArnold Montagenergy_progress
03/16/2026Lighting controlsArnold Montagenergy_progress
03/16/2026Fire-Resistance Rated ConstructionArnold Montagprogress
03/16/2026Energy Code Compliance InspectionsArnold Montagprogress
03/12/2026Fire-Resistant Penetrations and Joints—special
03/12/2026Fire-Resistance Rated Construction—progress
02/11/2026Fire-Resistant Penetrations and JointsArnold Montagspecial
02/10/2026Duct leakage testing, insulation and designArnold Montagenergy_progress
02/10/2026HVAC-R and service water heating system controlsArnold Montagenergy_progress
02/10/2026HVAC-R and service water heating equipmentArnold Montagenergy_progress
02/10/2026HVAC-R and service water heating equipmentArnold Montagenergy_progress
02/10/2026Maintenance informationArnold Montagenergy_progress
02/10/2026HVAC-R and service water heating system controlsArnold Montagenergy_progress
02/10/2026Shutoff dampersArnold Montagenergy_progress
02/10/2026HVAC-R and service water piping design and insulationArnold Montagenergy_progress
02/10/2026HVAC-R and service water piping design and insulationArnold Montagenergy_progress
02/10/2026Maintenance informationArnold Montagenergy_progress
12/15/2025Fire-Resistant Penetrations and JointsBenjamin Lamspecial
12/12/2025Fire-Resistant Penetrations and JointsBenjamin Lamspecial
Latest 25 of 66.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Old Print ShopRetailFloor 2
Project M00763086 Alteration · Permit Issued · 07/08/2022
Project M00763150 Alteration · Permit Entire · 07/08/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 547 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch27
09/06/2026M00045540-I1Request digital key ↗
09/06/2026M00056490-I1Request digital key ↗
09/03/2026M00538306-I1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Structural1
08/15/2026M00449528-I1Request digital key ↗
▸Applications & Permits101
▸BISPLAN / WORK APPROVAL APPLICATION55
01/21/2021123900868Open ↗
11/30/2020122272389Open ↗
07/31/2020123701583Open ↗
Showing 3 of 55 on file for this type
▸BISWORK PERMIT APPLICATION43
02/16/2024123900868Open ↗
02/06/2024123900868Open ↗
04/19/2021123900868Open ↗
Showing 3 of 43 on file for this type
▸BISPLACE OF ASSEMBLY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
11/30/2020122272389Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZoning Diagram (ZD1)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Seals & Professional Certifications158
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION45
04/06/2020123320520Open ↗
04/06/2020123320520Open ↗
03/23/2020123701583Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature28
09/02/2026M00736755-I1Open ↗
09/02/2026M00761193-I1Open ↗
08/31/2026M00844092-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
09/01/2026M00934911-I1Open ↗
09/01/2026M00934911-I1Open ↗
09/01/2026M00449528-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
09/01/2026M00934911-I1Open ↗
09/01/2026M00449528-I1Open ↗
09/01/2026M00538306-I1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST15
03/23/2020123701583Open ↗
10/10/2018123320520Open ↗
Showing 2 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
03/23/2020123701583Open ↗
03/06/2019140835577Open ↗
10/17/2018123320520Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
03/06/2019140835577Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
03/06/2019140835577Open ↗
Showing 1 of 3 on file for this type
▸BISProfessional and Owner Certification (POC3)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment31
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE13
12/13/2019140835577Open ↗
12/04/2019140835577Open ↗
11/29/2019140835577Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING7
03/06/2019140835577Open ↗
Showing 1 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/10/2018123320520Open ↗
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST2
03/23/2020123701583Open ↗
Showing 1 of 2 on file for this type
▸BISTenant Protection Plan and Notes2
07/19/2019123900868Open ↗
10/05/2017123337665Open ↗
▸DOB NOWStreet Tree Checklist2
08/20/2026M01191955-I1Open ↗
08/13/2026M00889922-I1Open ↗
▸Environmental & Asbestos48
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
09/02/2026M00736755-I1Open ↗
09/02/2026M00761193-I1Open ↗
08/31/2026M00844092-I1Open ↗
Showing 3 of 23 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)16
02/25/2021123900868Open ↗
03/18/2019140835577Open ↗
03/06/2019140835577Open ↗
Showing 3 of 16 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS INSPECTION REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance36
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS22
11/30/2020121741348Open ↗
04/06/2020123320520Open ↗
03/23/2020123701583Open ↗
Showing 3 of 22 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
10/25/2024123900868Open ↗
07/02/2020123337665Open ↗
04/06/2020123320520Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
10/25/2024123900868Open ↗
07/02/2020123337665Open ↗
03/06/2019140835577Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/06/2019140835577Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
09/02/2026M00693834-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY6
10/25/2024123900868Open ↗
07/02/2020123337665Open ↗
07/02/2020123337665Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
01/25/2018123189334Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
01/25/2018123189334Open ↗
▸Approvals, Objections & Sign-offs30
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
10/25/2024123900868Open ↗
07/02/2020123337665Open ↗
04/06/2020123320520Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
07/02/2020123337665Open ↗
04/06/2020123320520Open ↗
11/07/2019121741348Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
07/31/2020123701583Open ↗
03/23/2020123701583Open ↗
Showing 2 of 3 on file for this type
▸BISSUPERSEDING LETTER2
02/16/2024123900868Open ↗
12/22/2017122861019Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership35
▸BISCOST AFFIDAVIT34
10/25/2024123900868Open ↗
07/02/2020123337665Open ↗
04/06/2020123320520Open ↗
Showing 3 of 34 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
07/02/2020123337665Open ↗
▸Filing & Intake Forms59
▸BISEFILING COVER SHEET22
03/23/2020123701583Open ↗
07/19/2019123900868Open ↗
10/10/2018123320520Open ↗
Showing 3 of 22 on file for this type
▸BISBOROUGH INTAKE FORM19
04/06/2020123320520Open ↗
03/06/2020122861019Open ↗
03/06/2020122861019Open ↗
Showing 3 of 19 on file for this type
▸BISADDITIONAL INFORMATION15
01/08/2021123900868Open ↗
02/24/2020123337665Open ↗
12/13/2019140835577Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
03/06/2019140835577Open ↗
Showing 1 of 3 on file for this type
▸Other Documents4
▸BISPLOT DIAGRAM2
03/23/2020123701583Open ↗
Showing 1 of 2 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
06/18/2018123337665Open ↗
▸DOB NOWProperty Ownership Certification1
08/20/2026M01191955-I1Open ↗