DOB07/09/2026EMERGENCY WORK ORDER DUE TO CRACKED/SPALLING MASONRY CORNICE NEW ROOF LVL. DEFECTIVE/SPALLING BRK NEAR ROOF LVL. CRACKED,SPALLING COPING STONES @ MULT SETBACK LOCATIONS. REMEDY:IMMED TAKE/PROVIDE SAFE MEAS & INSTALL PUB PROT EXP1 S ELE. ADDITIONALLY REMOVE/SECURE LOOSE/HANGIN MATERIAL. MAKE REPAIRS U/SUPERVISION OF A LICENSED PROFESSIONAL
ECB04/20/2026FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8C AND 9C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #904108. AGG1: PRIOR NOV 37026219K UNDER$3K due
ECB02/08/2024FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8C & 9C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #904108.REMEDY:FILE ACCEPTABLE REPORT$6K due
DOB04/29/2021FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
DOB11/02/2020CYCLE 9C UNSAFE REPORT FILED
ECB12/16/2019AC279291-FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY JULY 1,2019,IN AN OFFICE BUILDING 100 FEE$6K due
DOB09/06/2019VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
DOB09/06/2019VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
DOB09/03/2019FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
DOB04/30/2019FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019
DOB01/26/2018VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
DOB01/26/2018VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
DOB11/14/2016VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
DOB11/14/2016VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
DOB11/14/2016VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
DOB02/02/2016FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB11/02/2015FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB08/02/2015FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB06/06/2014FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB12/31/2013FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013
DOB06/03/2013FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB05/03/2012FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB01/01/2012FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB11/30/2007V-DOB VIOLATION - ACTIVE
DOB11/30/2007V-DOB VIOLATION - ACTIVE
DOB02/10/1997V-DOB VIOLATION - ACTIVE
DOB08/29/1995V-DOB VIOLATION - ACTIVE
DOB06/18/1993V-DOB VIOLATION - ACTIVE
DOB06/18/1993V-DOB VIOLATION - ACTIVE
ECB08/12/2020AC 27-929 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY JULY 1, 2019 IN AN OFFICE BUILDING 100 FENothing owed — awaiting certificate of correction
ECB04/14/2020FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#804108. REMEDY: SUBMIT ACCEPTABLE REQUIRENothing owed — awaiting certificate of correction
ECB07/19/2012FAILURE TO FILE AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCEW/ARTICLE 28-302 OF THE BLDG CODE AND DOB'S RULES AND REGULATIONS. RESPONDENT HAS DEMONSTRATED A HISTORY OF NON-COMPLIANCE W/DEPT RULES ANDNothing owed — awaiting certificate of correction
ECB02/21/2012FAILURE TO FILE AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY ARTICLE 28.302 & THE DEPT OF BLDGS RULES & REGULNothing owed — awaiting certificate of correction
ECB04/28/2011FAILURE TO FILE AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE W/ CODE PROVISIONS PERIODIC INSP OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY ARTICLE 28.302 AND THE DOB RULES AND REGULATIONS REM:Nothing owed — awaiting certificate of correction
ECB06/02/2010FAILURE TO FILE AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE W/ CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY ARTICLE 28.302 & THE D.O.B. RULE AND REGULATIONSNothing owed — awaiting certificate of correction
ECB06/02/2010FAILURE TO FILE AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE W/ CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY ARTICLE 28.302 & THE D.O.B. RULE AND REGULATIONSNothing owed — awaiting certificate of correction
ECB12/12/2008FAILURE TO SUBMIT AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE W/CODE PROVISIONS PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY ARTICLE 28.302 AND THE DEPT OF BLDG RULES & REGUNothing owed — awaiting certificate of correction