← Back
BuildNYC
Single or multiple dwelling with stores or offices
49 WEST 8TH STREET
MANHATTAN · Greenwich Village · BIN 1009447
💬 Discuss this project
1845Year Built
4.5Stories
S9Building Class
C4-5Zoning
7,817 sfGross Floor Area
8Units
Rent Stabilized19 Active Violations 16 unresolved · 3 paperwork only ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: Waverly Realty Co · 2,160 sf lot · 3.62 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Construction 338 II2p · 2 filings · 15 docs
Floor 1Harran Holding CORP1 filing · 17 docs
Site & exteriorHeavy duty sidewalk shed installation6p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Waverly Realty Co803/22/2026
Harran Holding803/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
David Turner Architect301/14/2026
Farhad Bassiri-Tehrani208/13/2025
Enthink Engineers102/23/2023
J&R Design and Inspection208/05/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
High Quality 338403/21/2026
M W Expediting203/21/2026
KTC Design Group403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Phoenix Sutton STRScaffold403/21/2026
Splen ConstructionGeneral Contractor303/21/2026
CL ElectricalElectrical103/21/2026
Elpo Electrical ContgElectrical103/22/2026
Elpo Electrical ContgElectrical103/21/2026
Whitestone PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
David Turner Architect3829211/20/2025
J&R Design and Inspection6637208/05/2021
Building Lifecycle
All (127)Filed (8)Permit Issued (4)Signed Off (1)Violation (60)Objection (33)Special Inspection (21)
07/07/2026
Violation issued (HPD, open)
B
07/07/2026
Violation issued (HPD, open)
C
06/30/2026
Violation issued (HPD, open)
B
06/30/2026
Violation issued (HPD, open)
B
06/30/2026
Violation issued (HPD, open)
B
04/23/2026
Objection resolved — Resolved
04/23/2026
Objection resolved — Resolved
03/23/2026
Objection resolved — Addressed
02/07/2026
Objection raised — Scope
02/07/2026
Objection raised — Cost
01/27/2026
Objection resolved — Addressed
01/27/2026
Objection resolved — Addressed
01/14/2026
Filed — Alteration
Plumbing work for beauty parlor and to address ECB violations 39141871H; 3914872J, 39141870X
M01275714-S2
01/14/2026
Special inspection requirement — Mechanical Systems
01/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/14/2026
Special inspection requirement — Final
01/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
01/14/2026
Special inspection requirement — Duct leakage testing, insulation and design
01/14/2026
Special inspection requirement — Maintenance information
01/14/2026
Special inspection requirement — Permanent certificate
01/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
01/14/2026
Special inspection requirement — Ventilation and air distribution system
12/17/2025
Objection raised — Scope
12/17/2025
Objection raised — Scope
11/20/2025
Filed — Alteration
Plumbing work for beauty parlor and to address ECB violations 39141871H; 3914872J, 39141870X
M01275714-S1
11/16/2025
Objection raised — Cost
11/16/2025
Objection raised — Scope
11/16/2025
Objection raised — Scope
11/16/2025
Objection raised — Scope
11/14/2025
Objection raised — Other
10/13/2025
Filed — Alteration
Plumbing work for beauty parlor and to address ECB violations 39141871H; 3914872J, 39141870X
M01275714-I1
10/13/2025
Special inspection requirement — Lighting controls
DAVID TURNER
10/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAVID TURNER
10/13/2025
Special inspection requirement — Energy Code Compliance Inspections
DAVID TURNER
10/13/2025
Special inspection requirement — Interior lighting power
DAVID TURNER
10/03/2025
Violation issued (ECB, open)
Construction
09/09/2025
Objection raised — Other
09/09/2025
Objection raised — Other
09/04/2025
Violation issued (HPD, open)
A
09/04/2025
Violation issued (HPD, open)
B
09/04/2025
Violation issued (HPD, open)
B
09/04/2025
Violation issued (HPD, open)
B
09/04/2025
Violation issued (HPD, closed)
B
09/04/2025
Violation issued (HPD, closed)
C
08/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
DAVID TURNER
08/13/2025
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES FOR EXISTING 1ST FLOOR COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01209878-S1
08/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/11/2025
Objection resolved — Addressed
08/11/2025
Objection resolved — Addressed
08/11/2025
Objection resolved — Addressed
08/11/2025
Objection resolved — Addressed
08/11/2025
Objection resolved — Addressed
08/11/2025
Objection resolved — Addressed
08/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/04/2025
Violation issued (HPD, closed)
A
05/13/2025
Violation issued (HPD, open)
B
05/13/2025
Violation issued (HPD, open)
B
05/06/2025
Violation issued (HPD, closed)
C
04/17/2025
Objection raised — Other
04/17/2025
Objection raised — Other
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR02/24/2023
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR02/24/2023
DOB NOWPlumbingPermit IssuedWhitestone Plumbing11/08/2021
DOB NOWGeneral ConstructionPermit IssuedSplen Construction11/05/2021
BISOTISSUEDCyclone Range Hoods12/30/2011
BISBLISSUEDCalaray Gas HGHT06/30/1999
BISPLISSUEDCalaray Gas HGHT06/30/1999
BISOTISSUEDWolf Installations04/20/1998
BISEQISSUEDSpring Enterpris04/14/1998
BISOTISSUEDDafna Con Co09/06/1996
1 project · most recent 01/14/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/14/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin FRXC@$AXVJU 24,000 BTU · Ahu ×1
RXC24AXVJU 24,000 BTU · Condensing Unit ×1
Oxbox J4AC3060B1000AA 60,000 BTU · Condensing Unit ×1
J4AH4P60BICC00AA 60,000 BTU · Ahu ×1
Ventilation
2 projects · most recent 01/14/2026
Water/Sanitary
FiledStatusContractorScope
01/14/2026——Water/Sanitary
08/13/2025——Water/Sanitary
2 projects · most recent 05/24/2025
General Wiring
FiledStatusContractorScope
05/24/2025Permit IssuedCL ElectricalGeneral Wiring
02/17/2023CompleteElpo Electrical Contg—
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
01/14/2026Mechanical Systems—special
01/14/2026Tenant Protection Plan Compliance—special
01/14/2026Final—progress
01/14/2026HVAC-R and service water heating system controls—energy_progress
01/14/2026Duct leakage testing, insulation and design—energy_progress
01/14/2026Maintenance information—energy_progress
01/14/2026Permanent certificate—energy_progress
01/14/2026HVAC-R and service water piping design and insulation—energy_progress
01/14/2026Ventilation and air distribution system—energy_progress
10/13/2025Lighting controlsDAVID TURNERenergy_progress
10/13/2025Fire-Resistant Penetrations and JointsDAVID TURNERspecial
10/13/2025Energy Code Compliance InspectionsDAVID TURNERprogress
10/13/2025Interior lighting powerDAVID TURNERenergy_progress
08/22/2025Tenant Protection Plan ComplianceDAVID TURNERspecial
08/12/2025Fire-Resistant Penetrations and Joints—special
08/11/2025Tenant Protection Plan Compliance—special
08/05/2021Interior lighting powerRobert Truskoskyenergy_progress
07/23/2021Fire-Resistance Rated ConstructionRobert Truskoskyprogress
07/23/2021Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
07/23/2021FinalRobert Truskoskyprogress
07/23/2021Energy Code Compliance InspectionsRobert Truskoskyprogress
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/03/2026M00565995-I1Request digital key ↗
08/31/2026M00831865-I1Request digital key ↗
08/19/2026M01275714-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits12
▸DOB NOWLPC Approval/Permit7
08/13/2026M01209878-S1Open ↗
08/13/2026M01275714-I1Open ↗
08/13/2026M01275714-S2Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION3
01/04/2012120937745Open ↗
12/01/2010120536839Open ↗
12/01/2010120536839Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
01/04/2012120937745Open ↗
12/01/2010120536839Open ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/03/2026M00565995-I1Open ↗
08/22/2026M01209878-I1Open ↗
08/22/2026M01209878-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/28/2026M01275714-I1Open ↗
08/28/2026M01275714-I1Open ↗
08/28/2026M01275714-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026M01275714-I1Open ↗
08/28/2026M01275714-I1Open ↗
08/24/2026M00564060-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/04/2012120937745Open ↗
09/26/2011120536839Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
01/04/2012120937745Open ↗
12/01/2010120536839Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
01/04/2012120937745Open ↗
12/01/2010120536839Open ↗
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE3
06/07/2011120536839Open ↗
02/15/2011120536839Open ↗
02/02/2011120536839Open ↗
▸BISSCHEDULE B - PLUMBING1
12/01/2010120536839Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/03/2026M00565995-I1Open ↗
08/19/2026M01275714-S2Open ↗
08/19/2026M01275714-S1Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
01/04/2012120937745Open ↗
12/01/2010120536839Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY1
01/04/2012120937745Open ↗
▸Approvals, Objections & Sign-offs5
▸BISADMINISTRATIVE OBJECTIONS2
01/04/2012120937745Open ↗
12/01/2010120536839Open ↗
▸BISLANDMARKS APPROVAL2
01/04/2012120937745Open ↗
09/26/2011120536839Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/26/2011120536839Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
01/04/2012120937745Open ↗
09/26/2011120536839Open ↗
12/01/2010120536839Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
01/13/2012120937745Open ↗
12/01/2010120536839Open ↗
▸Other Documents2
▸DOB NOWDHCR Document2
08/13/2026M00564060-I1Open ↗
08/13/2026M00565995-I1Open ↗