← Back
MANHATTAN
490 FDR DRIVE
MANHATTAN · BIN 1091915
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 20 docs
Floor 1Under Construction40p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SAMY ABOUZID ENGINEERING PC107/21/2026
KS ENGINEERS, P.C.104/15/2026
Munoz Engineering104/14/2026
INFOTRAN ENGINEERS AND ARCHITECTS303/20/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AKSH QUALITY CONTRACTINGGeneral Contractor507/28/2026
WASOFF PLBG & UTILITY COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC LOGISTICS DBA JPCL EN351404/15/2026
Building Lifecycle
All (45)Filed (6)Permit Issued (6)Inspection (3)Objection (6)Special Inspection (24)
08/03/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/28/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/27/2026
Permit issued — Construction Fence
M01424840-I1-FN
07/21/2026
Filed — Alteration
Installation of a temporary construction fence for the proposed public restroom as per the plan. No change to use, egress, or occupancy under this application.
M01424840-I1
06/18/2026
Permit issued — Plumbing
M01339527-S3-PL
06/17/2026
Permit issued — Earth Work
M01339527-S1-FO-EA
06/15/2026
Permit issued — Structural
M01339527-S4-ST
06/04/2026
Permit issued — Mechanical Systems
M01339527-S2-MS
04/22/2026
Permit issued — General Construction
M01339527-I1-GC
04/15/2026
Filed — New Building
Structural work for NEW PUBLIC RESTROOM
M01339527-S4
04/14/2026
Filed — New Building
Structural work for NEW PUBLIC RESTROOM
M01339527-S1
04/10/2026
Objection resolved — Addressed
03/27/2026
Objection raised — Energy
03/20/2026
Filed — New Building
Structural work for NEW PUBLIC RESTROOM
M01339527-S2
03/20/2026
Filed — New Building
Structural work for NEW PUBLIC RESTROOM
M01339527-S3
03/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
03/16/2026
Special inspection requirement — Post-installed Anchors
Asma Hashmi
03/13/2026
Objection resolved — Addressed
03/12/2026
Objection resolved — Addressed
02/27/2026
Special inspection requirement — Duct leakage testing, insulation and design
Asma Hashmi
02/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
02/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
02/27/2026
Special inspection requirement — Maintenance information
Asma Hashmi
02/27/2026
Special inspection requirement — Shutoff dampers
Asma Hashmi
02/26/2026
Objection raised — Structural
02/25/2026
Objection raised — Energy
02/19/2026
Filed — New Building
Structural work for NEW PUBLIC RESTROOM
M01339527-I1
01/27/2026
Special inspection requirement — Maintenance information
Asma Hashmi
01/27/2026
Special inspection requirement — Lighting controls
Asma Hashmi
01/27/2026
Special inspection requirement — Metering
Asma Hashmi
01/27/2026
Special inspection requirement — Interior lighting power
Asma Hashmi
01/27/2026
Special inspection requirement — Exterior lighting power
Asma Hashmi
01/12/2026
Special inspection requirement — Air barrier - visual inspection
Asma Hashmi
01/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
01/12/2026
Special inspection requirement — Fenestration areas
Asma Hashmi
01/12/2026
Special inspection requirement — Fenestration air leakage
Asma Hashmi
01/12/2026
Special inspection requirement — Insulation placement and R values
Asma Hashmi
01/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Asma Hashmi
01/12/2026
Special inspection requirement — Air barrier continuity plan testing
Asma Hashmi
01/12/2026
Special inspection requirement — Masonry
Asma Hashmi
01/02/2026
Special inspection requirement — Final
Asma Hashmi
01/02/2026
Special inspection requirement — Mechanical Systems
Asma Hashmi
01/02/2026
Special inspection requirement — Footing and Foundation
Asma Hashmi
01/02/2026
Special inspection requirement — Final
Asma Hashmi
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedAKSH QUALITY CONTRACTING07/27/2026
DOB NOWPlumbingPermit IssuedWASOFF PLBG & UTILITY CO06/18/2026
DOB NOWEarth WorkPermit IssuedAKSH QUALITY CONTRACTING06/17/2026
DOB NOWStructuralPermit IssuedAKSH QUALITY CONTRACTING06/15/2026
DOB NOWMechanical SystemsPermit IssuedAKSH QUALITY CONTRACTING06/04/2026
DOB NOWGeneral ConstructionPermit IssuedAKSH QUALITY CONTRACTING04/22/2026
1 project · most recent 04/15/2026
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/15/2026Permit IssuedAKSH QUALITY CONTRACTINGHeating Systems, Ventilation Systems
Heating
Berko MODEL:HUHAA AND MAKE: BERKO 4 kW · Electric Heater ×1
Neptronic MAKE: NEPTRONIC AND MODEL : DFCI00H 5 kW · Ductwork ×1
Ventilation
Greenheck GREENHECK AND MINIVENT-750-VG 430 CFM · Erv ×1
3 projects · most recent 05/21/2026
General Wiring
FiledStatusContractorScope
05/21/2026Permit IssuedJOSEPH WEINSTEIN ELECTRIC1 meters, 1 new_meters
05/21/2026Permit IssuedJOSEPH WEINSTEIN ELECTRIC1 meters, 1 new_meters
04/23/2026Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
1 project · most recent 04/15/2026
Steel Concrete Masonry
FiledStatusContractorScope
04/15/2026Permit IssuedWASOFF PLBG & UTILITY COSteel, Concrete, Masonry
1 project · most recent 07/21/2026
Fence
FiledStatusContractorScope
07/21/2026Permit IssuedAKSH QUALITY CONTRACTINGFence
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/03/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/03/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/28/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
03/16/2026HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
03/16/2026Post-installed AnchorsAsma Hashmispecial
02/27/2026Duct leakage testing, insulation and designAsma Hashmienergy_progress
02/27/2026HVAC-R and service water heating system controlsAsma Hashmienergy_progress
02/27/2026HVAC-R and service water heating equipmentAsma Hashmienergy_progress
02/27/2026Maintenance informationAsma Hashmienergy_progress
02/27/2026Shutoff dampersAsma Hashmienergy_progress
01/27/2026Maintenance informationAsma Hashmienergy_progress
01/27/2026Lighting controlsAsma Hashmienergy_progress
01/27/2026MeteringAsma Hashmienergy_progress
01/27/2026Interior lighting powerAsma Hashmienergy_progress
01/27/2026Exterior lighting powerAsma Hashmienergy_progress
01/12/2026Air barrier - visual inspectionAsma Hashmienergy_progress
01/12/2026Energy Code Compliance InspectionsAsma Hashmiprogress
01/12/2026Fenestration areasAsma Hashmienergy_progress
01/12/2026Fenestration air leakageAsma Hashmienergy_progress
01/12/2026Insulation placement and R valuesAsma Hashmienergy_progress
01/12/2026Fenestration and door U-factor and product ratingsAsma Hashmienergy_progress
01/12/2026Air barrier continuity plan testingAsma Hashmienergy_progress
01/12/2026MasonryAsma Hashmispecial
01/02/2026FinalAsma Hashmiprogress
01/02/2026Mechanical SystemsAsma Hashmispecial
01/02/2026Footing and FoundationAsma Hashmiprogress
01/02/2026FinalAsma Hashmiprogress
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/17/2026M01339527-S1Request digital key ↗
08/17/2026M01339527-S3Request digital key ↗
08/17/2026M01339527-S4Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026M01339527-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026M01339527-I1Open ↗
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature21
08/29/2026M01339527-I1Open ↗
08/29/2026M01339527-I1Open ↗
08/29/2026M01339527-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/17/2026M01339527-S2Open ↗
08/17/2026M01339527-I1Open ↗
08/17/2026M01339527-S4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026M01339527-I1Open ↗
08/27/2026M01339527-S2Open ↗
08/27/2026M01339527-S2Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/17/2026M01339527-I1Open ↗
▸Approvals, Objections & Sign-offs7
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/17/2026M01339527-S3Open ↗
08/17/2026M01339527-S2Open ↗
08/17/2026M01339527-S4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
08/16/2026M01424840-I1Open ↗
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026M01339527-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/17/2026M01339527-I1Open ↗