← Back
Two family brick
490 IRVING AVENUE
BROOKLYN · BIN 3078403
💬 Discuss this project
1915Year Built
2Stories
B1Building Class
R6Zoning
3,288 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Two family brick · Owner of record: 490 IRVING PROJECT LLC · 1,892 sf lot · 1.74 FAR built · Flood zone X
Locations of Work
Plumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction9p · 1 filing · 20 docs
Floor 1Under Construction8p · 1 filing · 20 docs
Sub-BasementUnder Construction8p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
G K ENGG GROUP407/08/2026
HPD303/22/2026
SWEET HOME RESIDENCE LLC503/22/2026
LAKHI GENERAL CONTRACTOR203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/23/2025$1.1M—NORTH ELLIOT HOLDINGS LLC → 490 IRVING PROJECT LLC$319/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHARLES MALLEA ARCHITECT PLLC606/10/2026
ARQUITECTURA VARELA101/26/2024
DERMAN ENGINEERING PLLC112/28/2023
KNF SERVICES CROP109/18/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANICO SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
K.W.MCINTOSH CONSTRUCTIONGeneral Contractor704/09/2026
LAKHI GENERAL CONTRACTORGeneral Contractor203/21/2026
GREEN POWER ELECTRIC CORPElectrical103/22/2026
RICHARD NEUElectrical103/22/2026
G K ENGG GROUP LLCGeneral Contractor107/08/2026
PLBG P & H INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519706/10/2026
Building Lifecycle
All (77)Filed (9)Permit Issued (6)Signed Off (4)Violation (14)Inspection (4)Objection (10)Special Inspection (30)
08/06/2026
Signed off — Alteration
FILING FOR PL WORK & HWH. INCLUDING MINOR GAS WORK FOR DOMESTIC RANGES ONLY.
B00971555-S1
06/18/2026
Signed off — Alteration
FILING FOR PL WORK & HWH. INCLUDING MINOR GAS WORK FOR DOMESTIC RANGES ONLY.
B00971555-I1
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/11/2026
Special inspection requirement — Masonry
Younes Abouyaala
06/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
06/11/2026
Special inspection requirement — Final
NAVEEN KUMAR
06/11/2026
Special inspection requirement — Interior lighting power
Younes Abouyaala
06/11/2026
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
06/11/2026
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
06/11/2026
Special inspection requirement — Lighting controls
Younes Abouyaala
06/11/2026
Special inspection requirement — Fenestration areas
Younes Abouyaala
06/11/2026
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
06/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
06/11/2026
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
06/10/2026
Filed — Alteration
FILING FOR PL WORK & HWH. INCLUDING MINOR GAS WORK FOR DOMESTIC RANGES ONLY.
B00971555-P4
01/09/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
01/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
01/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
01/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
01/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
01/08/2026
Filed — Alteration
FILING FOR PL WORK & HWH. INCLUDING MINOR GAS WORK FOR DOMESTIC RANGES ONLY.
B00971555-P3
01/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
01/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
01/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
01/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
01/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
01/06/2026
Filed — Alteration
FILING FOR PL WORK & HWH. INCLUDING MINOR GAS WORK FOR DOMESTIC RANGES ONLY.
B00971555-P2
11/05/2025
Signed off — Alteration
STRL DRAWINGS TO REPAIR DAMAGE TO THE EXISTING BUILDING
B00975525-I1
09/09/2025
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR GENERAL CONSTRUCTION AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FOOT. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
B00996903-I1
08/08/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/16/2025
Permit issued — Plumbing
B00971555-S1-PL
06/18/2025
Permit issued — General Construction
B00971555-I1-GC
01/21/2025
Filed — Alteration
FILING FOR PL WORK & HWH. INCLUDING MINOR GAS WORK FOR DOMESTIC RANGES ONLY.
B00971555-P1
07/18/2024
Permit issued — Structural
B00975525-I1-ST
07/01/2024
Permit issued — General Construction
B00971555-I1-GC
03/29/2024
Permit issued — Sidewalk Shed
B00996903-I1-SH
01/26/2024
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR GENERAL CONSTRUCTION AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FOOT. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
B00996903-I1
01/18/2024
Filed — Alteration
FILING FOR PL WORK & HWH. INCLUDING MINOR GAS WORK FOR DOMESTIC RANGES ONLY.
B00971555-S1
01/11/2024
Objection raised — Scope
01/11/2024
Objection resolved — Addressed
01/11/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
01/10/2024
Objection resolved — Addressed
01/10/2024
Objection resolved — Addressed
01/05/2024
Objection resolved — Addressed
01/02/2024
Objection resolved — Addressed
12/29/2023
Objection raised — Scope
12/29/2023
Objection raised — Scope
12/29/2023
Objection raised — Scope
12/29/2023
Objection raised — Other
12/28/2023
Filed — Alteration
STRL DRAWINGS TO REPAIR DAMAGE TO THE EXISTING BUILDING
B00975525-I1
12/14/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Younes Abouyaala
12/14/2023
Special inspection requirement — Wood – Seismic Resistance
Younes Abouyaala
12/14/2023
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
12/14/2023
Special inspection requirement — Structural Wood Frame
Younes Abouyaala
12/14/2023
Special inspection requirement — Structural Steel - Welding
Younes Abouyaala
12/14/2023
Special inspection requirement — Post-installed Anchors
Younes Abouyaala
12/11/2023
Special inspection requirement — Final
NAVEEN KUMAR
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPLBG P & H INC07/16/2025
DOB NOWGeneral ConstructionSigned-offK.W.MCINTOSH CONSTRUCTION06/18/2025
DOB NOWStructuralSigned-offK.W.MCINTOSH CONSTRUCTION07/18/2024
DOB NOWGeneral ConstructionSigned-offK.W.MCINTOSH CONSTRUCTION07/01/2024
DOB NOWSidewalk ShedSigned-offG K ENGG GROUP LLC03/29/2024
DOB NOWSidewalk ShedPermit IssuedLAKHI GENERAL CONTRACTOR09/18/2019
1 project · most recent 06/10/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/10/2026Permit IssuedPLBG P & H INCGas, Water/Sanitary
3 projects · most recent 06/05/2025
General Wiring
FiledStatusContractorScope
06/05/2025CompleteVILLAGE ELECTL CONTRS INCGeneral Wiring
07/09/2024Permit IssuedRICHARD NEU—
09/03/2019Permit IssuedGREEN POWER ELECTRIC CORP—
1 project · most recent 09/18/2019
Sidewalk Shed
FiledStatusContractorScope
09/18/2019Permit IssuedLAKHI GENERAL CONTRACTORSidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/08/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/08/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
06/11/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
06/11/2026MasonryYounes Abouyaalaspecial
06/11/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
06/11/2026FinalNAVEEN KUMARprogress
06/11/2026Interior lighting powerYounes Abouyaalaenergy_progress
06/11/2026Insulation placement and R valuesYounes Abouyaalaenergy_progress
06/11/2026Fenestration air leakageYounes Abouyaalaenergy_progress
06/11/2026Lighting controlsYounes Abouyaalaenergy_progress
06/11/2026Fenestration areasYounes Abouyaalaenergy_progress
06/11/2026Air barrier - visual inspectionYounes Abouyaalaenergy_progress
06/11/2026Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
06/11/2026Lighting in dwelling unitsYounes Abouyaalaenergy_progress
01/09/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
01/09/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
01/09/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
01/09/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
01/09/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
01/08/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
01/08/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
01/08/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
01/08/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
01/08/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
01/11/2024Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
12/14/2023Structural Steel - High Strength BoltingYounes Abouyaalaspecial
12/14/2023Wood – Seismic ResistanceYounes Abouyaalaspecial
Latest 25 of 30.
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
08/26/2026B00975525-I1Request digital key ↗
08/26/2026B00996903-I1Request digital key ↗
08/16/2026B00971555-P3Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00218542-I1Request digital key ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026B00975525-I1Open ↗
08/16/2026B00971555-P4Open ↗
08/16/2026B00971555-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/28/2026B00971555-S1Open ↗
08/28/2026B00971555-S1Open ↗
08/24/2026B00975525-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026B00971555-S1Open ↗
08/24/2026B00975525-I1Open ↗
08/24/2026B00971555-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026B00218542-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/26/2026B00975525-I1Open ↗
08/16/2026B00971555-P4Open ↗
08/16/2026B00971555-S1Open ↗
Showing 3 of 7 on file for this type