HPD06/02/2004Section 27-2005 admin. Code: properly repair the broken or defective locking device at vestibule door to 1 sty. Public hall.
HPD06/02/2004Section 27-2005 admin. Code: abate the nuisance consisting of concealed water leak at ceiling of kitchen 2 sty. Apt. #1.
HPD06/02/2004Section 27-2005 admin. Code: properly repair with similar material the broken or defective ceramic tile floor at bathroom 2 sty. Apt. #1.
HPD06/02/2004Section 27-2018 admin. Code: abate the nuisance consisting of vermin mice and roaches thru/out 2 sty. Apt. #1.
HPD06/02/2004Section 27-2005 admin. Code: replace with new the missing door knob at vestibule door.
HPD06/02/2004Section 27-2005 admin. Code: repair the broken or defective plastered surfaces and paint in uniform color east wall 1ST. To 2ND sty. Public hall.
ECB05/17/2002Work w/o a permit : work noted : 1ST floor commerical store note job #301126671 disapproved 3/12/02 : work noted new interior partitions, new awning, new roll up gates, new hung ceiling remedy : obtian a permitNothing owed — awaiting certificate of correction
Nursing home · Owner of record: Boro Park Land Co · 38,600 sf lot · 7.57 FAR built · Flood zone X
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.