← Back
School site or yard
4911 19TH AVENUE
BROOKLYN · Mapleton-Midwood (West) · BIN 3429251
💬 Discuss this project
0Year Built
—Stories
V5Building Class
C4-5XZoning
0 sfGross Floor Area
0Units
4 Open Violations 3 unresolved · 1 paperwork only ▸FDNY Report ↗
School site or yard · Owner of record: 49-19 LLC · 3,301 sf lot · 0 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Permit Issued — active, not yet Signed-off
Site & exteriorUnder Construction1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KAUFMAN GROUP203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/27/2022$4.0M—19TH AVENUE PROPERTIES LLC → 49-19 LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FISCHER MAKOOI ARCHITECTS PLLC412/17/2025
MEY ASSOCIATES110/01/2024
EYAL LEVITT ARCHITECT PC305/16/2024
R & O ENGINEERING309/11/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ERETZ BUILDERS ASSISTANCE.1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KAUFMAN GROUP INCGeneral Contractor404/09/2026
POWER DIRECT ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616812/17/2025
Building Lifecycle
All (122)Filed (11)Permit Issued (2)Violation (6)Objection (73)Special Inspection (30)
06/10/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/26/2026
Permit issued — Construction Fence
B01113454-I1-FN
02/27/2026
Violation issued (DOB, open)
VPW-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-ACTIVE
02/27/2026
Violation issued (ECB, open)
Construction
02/13/2026
Special inspection requirement — Air barrier continuity plan testing
FAHAD FATEH
02/13/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
FAHAD FATEH
02/13/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
02/13/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
02/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/13/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
02/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
02/13/2026
Special inspection requirement — Metering
FAHAD FATEH
02/13/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
02/13/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
02/13/2026
Special inspection requirement — Vestibules
FAHAD FATEH
02/13/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FERAS AYOUB
02/13/2026
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
02/13/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
02/13/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
FAHAD FATEH
02/13/2026
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
02/13/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
02/13/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
02/13/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
02/13/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
02/13/2026
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
02/13/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
02/12/2026
Objection resolved — Addressed
02/04/2026
Objection raised — Zoning
01/08/2026
Objection resolved — Addressed
01/03/2026
Objection raised — Other
12/17/2025
Filed — New Building
Structural work for New building filed in conjunction with GC #B00648841-I1
B00648841-P3
12/11/2025
Violation issued (ECB, closed)
Unknown
12/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
12/11/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
12/11/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
12/11/2025
Special inspection requirement — Vestibules
FAHAD FATEH
12/11/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
12/11/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
12/11/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
FAHAD FATEH
12/11/2025
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
07/16/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/16/2024
Violation issued (ECB, closed)
Construction
12/13/2024
Objection resolved — Addressed
12/03/2024
Objection raised — Admin
11/22/2024
Filed — New Building
Structural work for New building filed in conjunction with GC #B00648841-I1
B00648841-P2
10/07/2024
Permit issued — Construction Fence
B01113454-I1-FN
10/01/2024
Filed — Alteration
INSTALLING 8'-0" HIGH CONSTRUCTION FENCE
B01113454-I1
09/19/2024
Objection resolved — Addressed
09/12/2024
Objection resolved — Addressed
09/12/2024
Objection resolved — Addressed
09/12/2024
Objection resolved — Addressed
09/06/2024
Objection raised — Scope
09/06/2024
Objection raised — Scope
09/06/2024
Objection raised — Admin
09/06/2024
Objection raised — Scope
09/04/2024
Objection resolved — Addressed
08/22/2024
Objection resolved — Addressed
08/22/2024
Objection resolved — Addressed
08/21/2024
Objection raised — Zoning
08/21/2024
Objection raised — Fire_Protection
Latest 60 of 122 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedKAUFMAN GROUP INC03/26/2026
DOB NOWConstruction FencePermit IssuedKAUFMAN GROUP INC10/07/2024
1 project · most recent 12/17/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/17/2025——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PURY-EP288TSNU-A 288,000 BTU · Vrf Outdoor ×2
PURY-EP432TSNU-A 432,000 BTU · Vrf Outdoor ×1
PUZ-A36NKA7 36,000 BTU · Condensing Unit ×1
Ventilation
Mitsubishi Electric LGH-F600RVX2-E 600 CFM · Erv ×3
LGH-F1200RVX2-E 1,200 CFM · Erv ×2
LGH-F300RVX2-E 300 CFM · Erv ×1
1 project · most recent 12/17/2025
Sprinkler System
FiledStatusContractorScope
12/17/2025——Sprinkler System
1 project · most recent 12/17/2025
Storm Water/Sanitary
FiledStatusContractorScope
12/17/2025——Storm, Water/Sanitary
1 project · most recent 12/05/2024
FiledStatusContractorScope
12/05/2024Permit IssuedPOWER DIRECT ELECTRIC INC—
1 project · most recent 12/17/2025
FiledStatusContractorScope
12/17/2025——5 scope_items
1 project · most recent 10/01/2024
Fence
FiledStatusContractorScope
10/01/2024Permit IssuedKAUFMAN GROUP INCFence
▾Special Inspection Requirements (DOB NOW) — 119
DateRequirementInspectorRole
02/13/2026Maintenance informationFAHAD FATEHenergy_progress
02/13/2026Electrical motors and elevatorsFAHAD FATEHenergy_progress
02/13/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
02/13/2026VestibulesFAHAD FATEHenergy_progress
02/13/2026Air barrier continuity plan testingFAHAD FATEHenergy_progress
02/13/2026Lighting controlsFAHAD FATEHenergy_progress
02/13/2026Interior lighting powerFAHAD FATEHenergy_progress
02/13/2026Subsurface Investigations (Borings/Test Pits)FERAS AYOUBspecial
02/13/2026Excavations - Sheeting, Shoring, and BracingFAHAD FATEHspecial
02/13/2026Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
02/13/2026Concrete - Cast-In-PlaceFAHAD FATEHspecial
02/13/2026Wall Panels, Curtain Walls, and VeneersFAHAD FATEHspecial
02/13/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/13/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
02/13/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
02/13/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
02/13/2026Exterior lighting powerFAHAD FATEHenergy_progress
02/13/2026MeteringFAHAD FATEHenergy_progress
02/13/2026Fenestration areasFAHAD FATEHenergy_progress
02/13/2026Fenestration air leakageFAHAD FATEHenergy_progress
02/13/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
02/13/2026Protection of exposed foundation insulationFAHAD FATEHenergy_progress
12/11/2025Fenestration air leakageFAHAD FATEHenergy_progress
12/11/2025Lighting controlsFAHAD FATEHenergy_progress
12/11/2025Protection of exposed foundation insulationFAHAD FATEHenergy_progress
Latest 25 of 119.
▾Documents — 100 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/25/2026B00648841-P2Request digital key ↗
08/25/2026B00648841-S1Request digital key ↗
08/25/2026B00648841-S2Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026B00648841-AR01Open ↗
08/13/2026B00648841-I1Open ↗
08/13/2026B00648841-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026B00648841-P2Open ↗
08/13/2026B00648841-I1Open ↗
08/13/2026B00648841-P3Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications47
▸DOB NOWSpecial Inspector Seal & Signature24
08/22/2026B00648841-S2Open ↗
08/22/2026B00648841-S4Open ↗
08/22/2026B00648841-S4Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
08/22/2026B00648841-S1Open ↗
08/22/2026B00648841-S5Open ↗
08/22/2026B00648841-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/25/2026B00648841-I1Open ↗
08/25/2026B00648841-S1Open ↗
08/25/2026B00648841-S2Open ↗
Showing 3 of 11 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026B00648841-P3Open ↗
08/13/2026B00648841-P2Open ↗
08/13/2026B00648841-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/25/2026B00648841-I1—
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist4
08/25/2026B00648841-I1Open ↗
08/25/2026B00648841-P2Open ↗
08/25/2026B00648841-AR01Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00648841-I1Open ↗
▸Inspections & Test Reports10
▸DOB NOWSOIL REPORT6
08/13/2026B00648841-I1Open ↗
08/13/2026B00648841-P2Open ↗
08/13/2026B00648841-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram3
08/13/2026B00648841-I1Open ↗
08/13/2026B00648841-S5Open ↗
08/13/2026B00648841-S4Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00648841-I1Open ↗
▸Other Documents14
▸DOB NOWSite Survey: Initial4
08/13/2026B00648841-I1Open ↗
08/13/2026B00648841-P2Open ↗
08/13/2026B00648841-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026B00648841-P3Open ↗
08/13/2026B00648841-P2Open ↗
08/13/2026B00648841-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/25/2026B00648841-I1Open ↗
08/25/2026B00648841-AR01Open ↗
08/25/2026B00648841-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00648841-S4Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00648841-I1Open ↗