Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFire Sprinklers System Installation40p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Sprinklers · Structural
Install new fire sprinkler system in the entire building I.A.W. NFPA 13R 2007 Edit, as modified by NYC BC 2014 Appendix Q as per plan. Filed in conjunction with NB application DOB Job#: 321729714.
On file for this project
2 documents
INSTALLATION OF PIPING, PLUMBING AND GAS FIXTURES, IN NEW 4 STORY & CELLAR, 7 FAMILY BUILDING
On file for this project
9 documents · 1 drawing sheet
Mechanical work filed in conjunction with GC Application Job #321729714.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
BulkheadVertical addition to existing building2p · 1 filing · 20 docs
Structural
To file structural plans for construction of new 4 story cellar.
On file for this project
32 documents · 2 drawing sheets
Floor 4Fire Sprinklers System Installation45p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
Install new fire sprinkler system in the entire building I.A.W. NFPA 13R 2007 Edit, as modified by NYC BC 2014 Appendix Q as per plan. Filed in conjunction with NB application DOB Job#: 321729714.
On file for this project
2 documents
INSTALLATION OF PIPING, PLUMBING AND GAS FIXTURES, IN NEW 4 STORY & CELLAR, 7 FAMILY BUILDING
On file for this project
9 documents
Mechanical work filed in conjunction with GC Application Job #321729714.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
Floor 3Fire Sprinklers System Installation45p · 4 filings · 20 docs
DMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
Install new fire sprinkler system in the entire building I.A.W. NFPA 13R 2007 Edit, as modified by NYC BC 2014 Appendix Q as per plan. Filed in conjunction with NB application DOB Job#: 321729714.
On file for this project
2 documents
INSTALLATION OF PIPING, PLUMBING AND GAS FIXTURES, IN NEW 4 STORY & CELLAR, 7 FAMILY BUILDING
On file for this project
9 documents
Mechanical work filed in conjunction with GC Application Job #321729714.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
Floor 2Fire Sprinklers System Installation48p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
Install new fire sprinkler system in the entire building I.A.W. NFPA 13R 2007 Edit, as modified by NYC BC 2014 Appendix Q as per plan. Filed in conjunction with NB application DOB Job#: 321729714.
On file for this project
2 documents
INSTALLATION OF PIPING, PLUMBING AND GAS FIXTURES, IN NEW 4 STORY & CELLAR, 7 FAMILY BUILDING
On file for this project
9 documents
Mechanical work filed in conjunction with GC Application Job #321729714.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
Floor 1Fire Sprinklers System Installation45p · 4 filings · 20 docs
DMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
Install new fire sprinkler system in the entire building I.A.W. NFPA 13R 2007 Edit, as modified by NYC BC 2014 Appendix Q as per plan. Filed in conjunction with NB application DOB Job#: 321729714.
On file for this project
2 documents
INSTALLATION OF PIPING, PLUMBING AND GAS FIXTURES, IN NEW 4 STORY & CELLAR, 7 FAMILY BUILDING
On file for this project
9 documents
Mechanical work filed in conjunction with GC Application Job #321729714.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
CellarFire Sprinklers System Installation44p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
Install new fire sprinkler system in the entire building I.A.W. NFPA 13R 2007 Edit, as modified by NYC BC 2014 Appendix Q as per plan. Filed in conjunction with NB application DOB Job#: 321729714.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION OF PIPING, PLUMBING AND GAS FIXTURES, IN NEW 4 STORY & CELLAR, 7 FAMILY BUILDING
On file for this project
9 documents
Mechanical work filed in conjunction with GC Application Job #321729714.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
Site & exteriorFire Sprinklers System Installation25p · 5 filings · 10 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · Sidewalk Shed · Sprinklers · Supported Scaffold
Install new fire sprinkler system in the entire building I.A.W. NFPA 13R 2007 Edit, as modified by NYC BC 2014 Appendix Q as per plan. Filed in conjunction with NB application DOB Job#: 321729714.
On file for this project
2 documents · 4 drawing sheets
INSTALLING 8'-0 HIGH CONSTRUCTION FENCE AROUND THE PROPERTY
On file for this project
2 documents · 1 drawing sheet
INSTALLATION OF 300 PSF SIDEWALK SHED, PIPE SCAFFOLDING, AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
2 documents · 9 drawing sheets
Latest 3 of 5 filings on this floor.