ECB07/01/2026BC3314.1 at time of inspection observed supported scaffold installed at exp# 3 not maintained as per code supported scaffold not fully plank loses not tie down bicycles missing locking pins. Missing netting.$3K due
ECB07/01/2026At time of inspection observed at first floor large accumulation of combustible debris approximately 7FT height. This creates fire hazard. Stop all work entire site only allow to maintain housekeeping.$3K due
ECB02/26/2026Observed a 9-story building, w/ needle beams installed contrary to plans on floors 3/5 &7, multiple makeshift steel angles & connections, nonconforming span/length dimensions. Installation deviated from pe desi$2K due
ECB02/26/2026Observed first floor with combustible & construction materials & debris scattered@multiple locations with snow &ice not contained or stored on designated containers to be removed, same condition observed @multi$2K due
ECB02/26/2026Observed workers working on the pipe scaffold at exposure 2 directly above demolition operations located at 4917 4 ave. Upon request for the workers' training cards, none were provided since the workers and sup$2K due
ECB02/26/2026Obs workers working on non-conforming scaffold @expo 2 working directly above workers were performing demolition ops@4917 4 ave,w/out any safety protocols to monitor multiple operations adj to each site.ssplan$5K due
ECB02/26/2026Unlawfully continued work while on notice of a stop work order. 9-story building under a partial stop work order issued on 01/12/2026 reference compliant 3A39928 by the borough commissioner for permit B00750328$10K due
ECB11/17/2025At the time of my inspection of a 9 story new building, i observed on the 2ND floor a set back with materials storing on it and there were no control access to prevent unauthorized workers to enter this area,$10K due
ECB11/17/2025At the time of my inspection of a 9 story new building, i observed needle beams at exposure #2 AND3 at the 4 and 5 floor, upon review of the site safety plan location of needle beams was not on it. Failure to c$12K due
ECB11/17/2025At the time of my inspection of a 9 story new building, i observed large amount construction debris, garbage and combustible materials at various locations approximately 7 feet in height, failure to provide and$12K due
ECB11/17/2025At the time of my inspection of a 9 story new building, i observed guardrails at various floors were missing mid rails and toe board. Failure to provide and maintain adequate guardrails creates a hazard for wor$25K due
ECB08/22/2025At the time of my inspection, 9 story building approximately 85 feet in height. Active jobsite upon request for hydrostatic test for standpipe to verify compliance with code and fire safety none was provided. F$10K due
ECB08/19/2025At the time of inspection active site i observed building at the 9TH floor level approximately 85FT in height not provided with an elevator in readiness, failure to provided elevator in readiness creates a haza$10K due
ECB08/19/2025At the time of inspection active site, i observed concrete operations at exposure#1,4 with concrete pump and truck parked adjacent to sidewalk shed open to public was not provided with mesh screen, 4FT wood ba$10K due
ECB08/19/2025At the time of inspection active jobsite, i observed building at the 9TH floor level above 75 feet in height was not provided with horizontal safety netting system, at the 6 floor level below working deck to ca$10K due
ECB08/19/2025At the time of inspection, i observed concrete operations in progress along with street and sidewalk closure at exposure#1,4 with concrete truck and pump obstructing street upon request for d.o.t permit for con$10K due
ECB07/19/2025Proposed 9 stories NB with a building footprint (sq. Ft.) 17235, walk jobsite perimeters, knock & called out, i observed no competent watch personnel as per bc 3303.7.7.6 a watchperson requirements of section 3$2K due
ECB07/02/20253301.6 manufacturer specifications, design, and capacity. Observed 9 story NB with shoring installed throughout jobsite. Upon review of manufacture specification and designed plans provided onsite, diagonal sho$10K due
ECB07/02/2025Observed active jobsite on 4TH fl working deck with installation of single phased wall forms @ expo 3 adjacent property. Adjacent property window not protected within 20 feet from construction operations as per$12K due
ECB06/07/2025Observed yodoks installed at expo#1 and #4 of the site, contrary to manufacturing specifications. Upon checking department records, observed no DOT permit was issued for this site to have yodoks occupying the r$10K due
ECB06/07/2025Observed yodoks installed at expo#1 #4 of the site, contrary to manufacturing specifications. Mix match components in use preventing all yodoks from interlocking together, also not filled with water as per spec$6K due
ECB05/15/2025At the time of my inspection of active job site observed foundation work in process/support of excavation(aprox. 10-12 feet deep-upon checking departments records -no notification to department made prior to co$12K due