← Back
Walk-up apt, over six families with stores
492 9 AVENUE
MANHATTAN · Chelsea-Hudson Yards · BIN 1013614
💬 Discuss this project
1901Year Built
5Stories
C7Building Class
C1-7AZoning
19,398 sfGross Floor Area
17Units
Rent Stabilized12 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: 492 NINTH AVENUE, LLC · 4,933 sf lot · 3.93 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Roof1p · 1 filing · 17 docs
Cellar2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHI407/08/2026
BROADWAY 922 ENTERPRISES LLC1103/22/2026
492 NINTH AVENUE, LLC103/22/2026
OWNER OF PREMISES103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZHENG & ASSOCIATES LLC904/13/2026
ALLEN SHINFELD, P.E. PLLC212/19/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YOUN DESIGN CORP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPLEN CONSTRUCTION INCGeneral Contractor407/08/2026
JONG HYUN KIMElectrical103/22/2026
XH&RC PLBG AND HTG INCPlumbing107/08/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZHENG & ASSOCIATES LLC7330507/02/2025
Building Lifecycle
All (93)Filed (11)Permit Issued (4)Signed Off (4)Violation (45)Inspection (5)Objection (2)Special Inspection (22)
04/29/2026
Violation issued (HPD, closed)
A
04/22/2026
Special inspection requirement — Public Assembly Emergency Lighting
Jinfar Liu
04/13/2026
Filed — No Work
M01245986-P3
04/13/2026
Special inspection requirement — Public Assembly Emergency Lighting
Jinfar Liu
03/26/2026
Filed — No Work
M01245986-P2
03/25/2026
Special inspection requirement — Public Assembly Emergency Lighting
Jinfar Liu
07/30/2025
Objection resolved — Addressed
07/18/2025
Objection raised — Fire_Protection
07/08/2025
Signed off — Alteration
INTERIOR RENOVATION FOR EXISTING RESTAURANT @ 1ST. FLOOR. (1) EXISTING KITCHEN HOOD TO BE EXTENDED. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00682534-I1
07/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
07/03/2025
Special inspection requirement — Interior lighting power
Jinfar Liu
07/03/2025
Special inspection requirement — Lighting controls
Jinfar Liu
07/03/2025
Special inspection requirement — Lighting in dwelling units
Jinfar Liu
07/03/2025
Special inspection requirement — Mechanical Systems
Jinfar Liu
07/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
07/03/2025
Special inspection requirement — Final
Jinfar Liu
07/02/2025
Filed — No Work
M01245986-I1
07/02/2025
Filed — Alteration
INTERIOR RENOVATION FOR EXISTING RESTAURANT @ 1ST. FLOOR. (1) EXISTING KITCHEN HOOD TO BE EXTENDED. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00682534-P2
06/23/2025
Special inspection requirement — Final
Jinfar Liu
06/23/2025
Special inspection requirement — Lighting controls
Jinfar Liu
06/23/2025
Special inspection requirement — Interior lighting power
Jinfar Liu
06/23/2025
Special inspection requirement — Lighting in dwelling units
Jinfar Liu
06/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
06/23/2025
Special inspection requirement — Mechanical Systems
Jinfar Liu
06/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
04/01/2024
Violation issued (HPD, closed)
A
12/01/2023
Signed off — Alteration
GAS WORK FOR EXISTING RESTAURANT @ 1ST. FLOOR. INSTALL (1) FIRE SUPPRESSION SHUT-OFF VALVE FOR COMMERICAL KITCHEN. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00684011-I1
08/29/2023
Signed off — Alteration
INSTALL NEW TEMPORARY CONSTRUCTION FENCE. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00697641-I1
01/10/2023
Signed off — Alteration
INSTALLATION OF A ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08024155-I1
12/28/2022
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
12/23/2022
Inspection — Fail-Final Sign Permit Inspection
Fail
View inspection ↗
12/19/2022
Filed — Alteration
INSTALLATION OF A ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08024155-P1
11/28/2022
Inspection — Fail-Final Sign Permit Inspection
Fail
View inspection ↗
11/03/2022
Permit issued — Sign
M08024155-I1-SG
10/19/2022
Filed — Alteration
INSTALLATION OF A ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08024155-I1
06/07/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/04/2022
Filed — Alteration
GAS WORK FOR EXISTING RESTAURANT @ 1ST. FLOOR. INSTALL (1) FIRE SUPPRESSION SHUT-OFF VALVE FOR COMMERICAL KITCHEN. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00684011-P2
06/03/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/19/2022
Filed — Alteration
GAS WORK FOR EXISTING RESTAURANT @ 1ST. FLOOR. INSTALL (1) FIRE SUPPRESSION SHUT-OFF VALVE FOR COMMERICAL KITCHEN. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00684011-P1
04/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
04/26/2022
Special inspection requirement — HVAC-R and service water heating equipment
Jinfar Liu
04/26/2022
Special inspection requirement — HVAC-R and service water heating system controls
Jinfar Liu
04/26/2022
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
04/26/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Jinfar Liu
03/17/2022
Permit issued — Construction Fence
M00697641-I1-FN
03/14/2022
Filed — Alteration
INSTALL NEW TEMPORARY CONSTRUCTION FENCE. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00697641-I1
03/10/2022
Permit issued — Plumbing
M00684011-I1-PL
02/28/2022
Permit issued — Mechanical Systems
M00682534-I1-GC-CX
02/21/2022
Filed — Alteration
INTERIOR RENOVATION FOR EXISTING RESTAURANT @ 1ST. FLOOR. (1) EXISTING KITCHEN HOOD TO BE EXTENDED. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00682534-I1
02/21/2022
Filed — Alteration
GAS WORK FOR EXISTING RESTAURANT @ 1ST. FLOOR. INSTALL (1) FIRE SUPPRESSION SHUT-OFF VALVE FOR COMMERICAL KITCHEN. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00684011-I1
03/03/2020
Violation issued (HPD, closed)
A
09/04/2019
Violation issued (HPD, closed)
A
09/04/2019
Violation issued (HPD, closed)
B
06/24/2019
Violation issued (HPD, closed)
A
06/24/2019
Violation issued (HPD, closed)
A
06/24/2019
Violation issued (HPD, open)
A
06/24/2019
Violation issued (HPD, closed)
A
06/24/2019
Violation issued (HPD, closed)
A
06/24/2019
Violation issued (HPD, open)
C
06/24/2019
Violation issued (HPD, closed)
A
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC11/03/2022
DOB NOWConstruction FenceSigned-offSPLEN CONSTRUCTION INC03/17/2022
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC03/10/2022
DOB NOWMechanical SystemsSigned-offSPLEN CONSTRUCTION INC02/28/2022
BISOTISSUEDNY SIGN CONTRACTOR12/05/2006
BISPLISSUEDLAB PLBG & HTG CO INC12/20/2004
BISPLISSUEDJ & D LPLUMBING & HEATING LLC06/14/2001
BISPLISSUEDJ.D. PLUMBING HEATING LLC02/21/2001
BIS—ISSUEDBERGER SIGN FABRICTION,INC.07/19/2000
BIS—ISSUEDDERIGGI AND SONS CONST CORP02/25/2000
BISEQISSUEDDERIGGI AND SONS CONST CORP02/25/2000
BISSPRE-ISSUEDCHIEF FIRE CONTR. CO. INC10/12/1999
BISPLRE-ISSUEDJ.D..PLUMBING & HEATING,LLC10/07/1999
BISEQISSUEDDERIGGI AND SONS CONST CORP04/19/1999
BIS—ISSUEDDERIGGI AND SONS CONST CORP04/19/1999
BIS—ISSUEDPHOENIX BUILDERS, INC.03/26/1998
BISEQISSUEDATLANTIC SCAFFOLDING12/16/1997
BISPLISSUEDKIN CHI PLG AND HTG CORP07/01/1997
BISEQISSUEDPHOENIX BUILDERS, INC.05/05/1997
BISFPISSUEDSENTINEL FIRE CONTROL INC12/06/1996
BISPLISSUEDGAS HEAT CORP.06/11/1993
BISBLISSUEDGAS HEAT CORP.06/11/1993
BISBLISSUEDGAS HEAT CORP.12/30/1992
BISPLISSUEDGAS HEAT CORP.12/23/1992
BISOTISSUEDROBERT LEONARD, INC.03/05/1992
BISFPISSUEDMASTER FIRE PREVENTION SYSTEMS I08/23/1991
1 project · most recent 10/12/2022
FiledStatusContractorScope
10/12/2022CompleteJONG HYUN KIM—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/28/2022Pass-Final Sign Permit InspectionPassView ↗
12/23/2022Fail-Final Sign Permit InspectionFailView ↗
11/28/2022Fail-Final Sign Permit InspectionFailView ↗
06/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/03/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
04/22/2026Public Assembly Emergency LightingJinfar Liuprogress
04/13/2026Public Assembly Emergency LightingJinfar Liuprogress
03/25/2026Public Assembly Emergency LightingJinfar Liuprogress
07/03/2025Energy Code Compliance InspectionsJinfar Liuprogress
07/03/2025Interior lighting powerJinfar Liuenergy_progress
07/03/2025Lighting controlsJinfar Liuenergy_progress
07/03/2025Lighting in dwelling unitsJinfar Liuenergy_progress
07/03/2025Mechanical SystemsJinfar Liuspecial
07/03/2025Fire-Resistant Penetrations and JointsJinfar Liuspecial
07/03/2025FinalJinfar Liuprogress
06/23/2025FinalJinfar Liuprogress
06/23/2025Lighting controlsJinfar Liuenergy_progress
06/23/2025Interior lighting powerJinfar Liuenergy_progress
06/23/2025Lighting in dwelling unitsJinfar Liuenergy_progress
06/23/2025Fire-Resistant Penetrations and JointsJinfar Liuspecial
06/23/2025Mechanical SystemsJinfar Liuspecial
06/23/2025Energy Code Compliance InspectionsJinfar Liuprogress
04/26/2022Fire-Resistant Penetrations and JointsJinfar Liuspecial
04/26/2022HVAC-R and service water heating equipmentJinfar Liuenergy_progress
04/26/2022HVAC-R and service water heating system controlsJinfar Liuenergy_progress
04/26/2022Energy Code Compliance InspectionsJinfar Liuprogress
04/26/2022HVAC-R and service water piping design and insulationJinfar Liuenergy_progress
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch6
09/02/2026M00682534-I1Request digital key ↗
09/02/2026M00682534-P2Request digital key ↗
09/02/2026M00697641-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
08/23/2026M01245986-P3Request digital key ↗
08/23/2026M01245986-P2Request digital key ↗
08/23/2026M01245986-I1Request digital key ↗
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature11
09/05/2026M01245986-I1Open ↗
09/01/2026M00682534-I1Open ↗
09/01/2026M00682534-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/02/2026M00682534-I1Open ↗
09/02/2026M00682534-P2Open ↗
09/02/2026M00684011-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026M00682534-I1Open ↗
08/26/2026M00682534-P2Open ↗
08/23/2026M00684011-P1Open ↗
▸Safety & Tenant Protection8
▸DOB NOWHPD-1: Anti-Harassment Area Checklist8
09/02/2026M00682534-P2Open ↗
09/02/2026M00682534-I1Open ↗
09/02/2026M00684011-P1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/02/2026M00682534-I1Open ↗
09/02/2026M00682534-P2Open ↗
09/02/2026M00684011-P1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
09/02/2026M00682534-I1Open ↗
09/02/2026M00684011-I1Open ↗