ECB03/27/2026FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. DOB FTC VIOLATION #012926PI30112AG, AND CONTROL #348456 ISSUED ON JAN 29TH 2026, 2ND NOTICE TO OWNER FOR NOT SUBMITTING THE REQUIRED DOCUMENTS FOR CORRECTIVE ACTION$2K due
DOB01/29/2026FTC W/COMMISSIONER'S ORDER DOB CONTROL#348432 AND DOB CAP VIO# 011426PI30101SB DATED 01/14/2026 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 01/28/2026. AS OF 01/29/2026 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER DOB CONTROL#348432 AND DOB CAP VIO#011426PI30101SB
ECB01/14/2026FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. PROPERTY IS 3STORIES MIXED USE ON AN INTERIOR LOT.-OBSERVED AT EXPOSURE 1 SEVERLY CRACKED/BULGING MASONRY BRICKS AND WINDOW HEADER STOVE ABOVE 3RD FLOOR$6K due
DOB01/14/2026CORRECTIVE ACTION PLAN REQ'D(14 DAY CAP)OBSVD SEVERELY CRACKED/BULGING MASONRY @ WINDOW HEADER STONE @ EXP1/4 PARAPET. ASLO @ EXP1 OBSVD DAMAGED/OPEN CORNICE & SEVERAL AREAS OF CRACKED/LOOSE MASONRY. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL ENTIRE BLDG AND TO SUBMIT A CORRECTIVE ACTION PLAN BY 02/28/26
ECB09/11/2024I OBSERVED THROUGHOUT THE ENTIRE MAIN HALLWAY FLOORS FIRST AND SECOND FOUR NEW LIGHT FIXTURES. NO APPLICATION FILED WITH D.O.B., OBTAIN PERMIT; FRONT DOOR$500 due
HPD01/09/2009§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR NORTH WALL (EAST BATHROOM) IN THE BATHROOM LOCATED AT APT 3, 3rd STORY