← Back
BROOKLYN
The 493-495 Myrtle Avenue Condominium
493 MYRTLE AVENUE · BIN 3429221
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof12p · 3 filings · 7 docs
Bulkhead4p · 2 filings · 20 docs
Floor 810p · 2 filings · 20 docs
Floor 79p · 3 filings · 20 docs
Floor 610p · 4 filings · 20 docs
Floor 510p · 2 filings · 20 docs
Floor 410p · 3 filings · 20 docs
Floor 311p · 3 filings · 20 docs
Floor 210p · 4 filings · 20 docs
Floor 116p · 4 filings · 20 docs
Cellar2p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LEMX2907/08/2026
493 MYRTLE AVENUE REALTY GROUP5407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZENITH HOME INSPECTIONS106/19/2025
AMA CONSULTING ENGINEERS, PC201/28/2025
LAWRENCE GROUP101/24/2025
A&D ENGINEERING, PLLC911/06/2023
ENTHINK ENGINEERS LLC1112/09/2022
ZAMBRANO ARCHITECTURAL208/23/2021
WEXLER ASSOCIATES110/06/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.1803/21/2026
LOUIS STRIAR203/21/2026
PAUL FUSCO CONSULTING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RGB PARTNERS LLCGeneral Contractor1407/08/2026
M&D FIRE SPRINKLER INCFire Protection1207/08/2026
LEMX CORPGeneral Contractor807/08/2026
MMI PLUMBING & HEATING INC.Plumbing407/08/2026
M D FIRE SPRINKLERPlumbing303/22/2026
RELIABLE ELEC'L CONTR'SElectrical303/22/2026
CM PLUMBING INCPlumbing307/08/2026
COYLE CONTRACTING CORPGeneral Contractor207/08/2026
CAPITOL DESIGN MAINT INScaffold107/08/2026
S & D ELECTRIC NY CORPElectrical103/22/2026
ELPO ELECTRICAL CONTG INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK ENGINEERING PC678301/28/2025
BUILDING CONSULTING ENGIN1034911/06/2023
ENTHINK ENGINEERS LLC6247312/09/2022
HYKE ENGINEERING & MANAGE2422109/09/2021
Building Lifecycle
All (134)Filed (27)Permit Issued (30)Signed Off (12)Violation (16)Inspection (17)Objection (2)Special Inspection (30)
05/08/2026
Violation issued (HPD, closed)
A
02/11/2026
Violation issued (HPD, open)
C
10/07/2025
Signed off — Alteration
INTERIOR ALTERATIONS OF EXISTING GROUND FLOOR COMMERCIAL SPACE TO INCLUDE NON-LOAD BEARING DEMOLITION AND GENERAL CONSTRUCTION. NO CHANGE TO USE, OCCUPANCY OR EGRESS
B01167544-I1
10/07/2025
Signed off — Alteration
INTERIOR ALTERATIONS OF EXISTING GROUND FLOOR COMMERCIAL SPACE TO INCLUDE NON-LOAD BEARING DEMOLITION AND GENERAL CONSTRUCTION. NO CHANGE TO USE, OCCUPANCY OR EGRESS
B01167544-S1
09/23/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/19/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/22/2025
Signed off — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - TEND. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01227972-I1
07/24/2025
Permit issued — Sprinklers
B01167544-S2-EW-SP
06/25/2025
Permit issued — Sign
B01227972-I1-SG
06/19/2025
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - TEND. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01227972-I1
06/19/2025
Special inspection requirement — Final
ADITYA DESAI
06/16/2025
Violation issued (HPD, closed)
A
04/04/2025
Permit issued — Sprinklers
B01167544-S2-EW-SP
03/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/18/2025
Permit issued — Plumbing
B01167544-S2-EW-SP
02/18/2025
Permit issued — Plumbing
B01167544-S2-PL
02/11/2025
Permit issued — Mechanical Systems
B01167544-S1-MS
02/11/2025
Permit issued — General Construction
B01167544-I1-GC
01/28/2025
Filed — Alteration
INTERIOR ALTERATIONS OF EXISTING GROUND FLOOR COMMERCIAL SPACE TO INCLUDE NON-LOAD BEARING DEMOLITION AND GENERAL CONSTRUCTION. NO CHANGE TO USE, OCCUPANCY OR EGRESS
B01167544-S1
01/28/2025
Filed — Alteration
INTERIOR ALTERATIONS OF EXISTING GROUND FLOOR COMMERCIAL SPACE TO INCLUDE NON-LOAD BEARING DEMOLITION AND GENERAL CONSTRUCTION. NO CHANGE TO USE, OCCUPANCY OR EGRESS
B01167544-S2
01/24/2025
Filed — Alteration
INTERIOR ALTERATIONS OF EXISTING GROUND FLOOR COMMERCIAL SPACE TO INCLUDE NON-LOAD BEARING DEMOLITION AND GENERAL CONSTRUCTION. NO CHANGE TO USE, OCCUPANCY OR EGRESS
B01167544-I1
01/20/2025
Special inspection requirement — Post-installed Anchors
Ari Kamo
01/20/2025
Special inspection requirement — Sprinkler Systems
Ari Kamo
01/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
01/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
01/20/2025
Special inspection requirement — Post-installed Anchors
Ari Kamo
01/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
01/20/2025
Special inspection requirement — Mechanical Systems
Ari Kamo
01/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
Ari Kamo
01/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Ari Kamo
01/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
Ari Kamo
01/20/2025
Special inspection requirement — Duct leakage testing, insulation and design
Ari Kamo
01/20/2025
Special inspection requirement — Final
Ari Kamo
01/20/2025
Special inspection requirement — Maintenance information
Ari Kamo
01/15/2025
Special inspection requirement — Lighting controls
Ari Kamo
01/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
01/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
01/15/2025
Special inspection requirement — Final
Ari Kamo
01/15/2025
Special inspection requirement — Interior lighting power
Ari Kamo
12/04/2023
Signed off — Alteration
Construction fence
B00573501-I1
12/01/2023
Signed off — Alteration
Standpipe work related to NB application
B00348361-I1
12/01/2023
Signed off — Alteration
B00394203-I1
11/14/2023
Signed off — Alteration
B00348350-I1
11/13/2023
Signed off — Alteration
B00517322-I1
11/06/2023
Filed — Alteration
Standpipe work related to NB application
B00348361-P5
11/03/2023
Special inspection requirement — HVAC-R and service water heating equipment
TONY ONYEAGORO
11/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
TONY ONYEAGORO
11/03/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
TONY ONYEAGORO
11/03/2023
Special inspection requirement — Sprinkler Systems
TONY ONYEAGORO
11/03/2023
Special inspection requirement — Energy Code Compliance Inspections
TONY ONYEAGORO
11/03/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
TONY ONYEAGORO
11/03/2023
Special inspection requirement — HVAC-R and service water heating system controls
TONY ONYEAGORO
11/01/2023
Signed off — Alteration
Standpipe work related to NB application
B00348361-S1
10/31/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/31/2023
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
10/31/2023
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)
Certified
View inspection ↗
10/31/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/27/2023
Filed — Alteration
Standpipe work related to NB application
B00348361-P4
10/26/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
Latest 60 of 134 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offM&D FIRE SPRINKLER INC07/24/2025
DOB NOWSignSigned-offCAPITOL DESIGN & MAINT IN06/25/2025
DOB NOWSprinklersSigned-offM&D FIRE SPRINKLER INC04/04/2025
DOB NOWPlumbingSigned-offM&D FIRE SPRINKLER INC02/18/2025
DOB NOWPlumbingSigned-offCM PLUMBING INC02/18/2025
DOB NOWMechanical SystemsSigned-offCOYLE CONTRACTING CORP02/11/2025
DOB NOWGeneral ConstructionSigned-offCOYLE CONTRACTING CORP02/11/2025
DOB NOWPlumbingSigned-offM&D FIRE SPRINKLER INC07/24/2023
DOB NOWPlumbingSigned-offM&D FIRE SPRINKLER INC04/27/2023
DOB NOWStructuralPermit IssuedRGB PARTNERS LLC04/21/2023
DOB NOWMechanical SystemsSigned-offRGB PARTNERS LLC03/23/2023
DOB NOWSprinklersSigned-offMICHAEL ITSKOVICH03/10/2023
DOB NOWSidewalk ShedSigned-offLEMX CORP01/03/2023
DOB NOWStandpipeSigned-offM&D FIRE SPRINKLER INC11/21/2022
DOB NOWSprinklersSigned-offM&D FIRE SPRINKLER INC11/21/2022
DOB NOWPlumbingSigned-offMICHAEL ITSKOVICH11/21/2022
DOB NOWStandpipeSigned-offM&D FIRE SPRINKLER INC11/21/2022
DOB NOWConstruction FenceSigned-offRGB PARTNERS LLC10/20/2022
DOB NOWConstruction FenceSigned-offRGB PARTNERS LLC09/12/2022
DOB NOWStandpipeSigned-offM&D FIRE SPRINKLER INC07/21/2022
DOB NOWPlumbingSigned-offMICHAEL ITSKOVICH07/19/2022
DOB NOWProtection and Mechanical MethodsSigned-offLEMX CORP06/14/2022
DOB NOWSupported ScaffoldSigned-offLEMX CORP06/13/2022
DOB NOWStructuralPermit IssuedRGB PARTNERS LLC05/31/2022
DOB NOWSprinklersSigned-offMICHAEL ITSKOVICH04/14/2022
DOB NOWMechanical SystemsSigned-offRGB PARTNERS LLC03/23/2022
DOB NOWStandpipeSigned-offM&D FIRE SPRINKLER INC03/22/2022
DOB NOWSprinklersSigned-offM&D FIRE SPRINKLER INC03/22/2022
DOB NOWStandpipeSigned-offM&D FIRE SPRINKLER INC03/22/2022
DOB NOWSidewalk ShedSigned-offLEMX CORP01/03/2022
BIS—ISSUEDRGB PARTNERS LLC04/21/2023
BIS—ISSUEDRGB PARTNERS LLC04/21/2023
BIS—ISSUEDRGB PARTNERS LLC08/11/2022
BIS—ISSUEDRGB PARTNERS LLC08/11/2022
BIS—ISSUEDRGB PARTNERS LLC08/24/2021
BIS—ISSUEDRGB PARTNERS LLC08/24/2021
1 project · most recent 01/28/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/28/2025Signed-offCOYLE CONTRACTING CORPHeating and Air Conditioning Systems
Heat / Cool
Daikin FXSQ24TBVJU 23,989 BTU · Vrf Indoor ×1
FXSQ36TBVJU 36,000 BTU · Vrf Indoor ×1
FXSQ54TBJVU 54,018 BTU · Vrf Indoor ×1
REYQ120AATJB 120,008 BTU · Vrf Outdoor ×1
1 project · most recent 01/28/2025
FiledStatusContractorScope
01/28/2025Signed-offM&D FIRE SPRINKLER INC—
1 project · most recent 01/28/2025
Water/Sanitary
FiledStatusContractorScope
01/28/2025Signed-offCM PLUMBING INCWater/Sanitary
7 projects · most recent 03/24/2025
General Wiring
FiledStatusContractorScope
03/24/2025Permit IssuedS & D ELECTRIC NY CORPGeneral Wiring
02/20/2025Permit IssuedRELIABLE ELEC'L CONTR'SGeneral Wiring
02/20/2025Permit IssuedRELIABLE ELEC'L CONTR'S—
05/22/2023CompleteRELIABLE ELEC'L CONTR'SGeneral Wiring
02/11/2022CompleteSTAR ELEC'L CONTRACTORS C—
01/19/2022CompleteRELIABLE ELEC'L CONTR'S—
12/22/2021CompleteELPO ELECTRICAL CONTG INC—
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
09/23/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/19/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/31/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/31/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
10/31/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
10/31/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/26/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/18/2023Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
10/18/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
10/18/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/13/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
09/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/12/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/07/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/12/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
06/19/2025FinalADITYA DESAIprogress
01/20/2025Post-installed AnchorsAri Kamospecial
01/20/2025Sprinkler SystemsAri Kamospecial
01/20/2025Tenant Protection Plan ComplianceAri Kamospecial
01/20/2025Fire-Resistant Penetrations and JointsAri Kamospecial
01/20/2025Post-installed AnchorsAri Kamospecial
01/20/2025Tenant Protection Plan ComplianceAri Kamospecial
01/20/2025Mechanical SystemsAri Kamospecial
01/20/2025HVAC-R and service water heating equipmentAri Kamoenergy_progress
01/20/2025HVAC-R and service water piping design and insulationAri Kamoenergy_progress
01/20/2025HVAC-R and service water heating system controlsAri Kamoenergy_progress
01/20/2025Duct leakage testing, insulation and designAri Kamoenergy_progress
01/20/2025FinalAri Kamoprogress
01/20/2025Maintenance informationAri Kamoenergy_progress
01/15/2025Lighting controlsAri Kamoenergy_progress
01/15/2025Fire-Resistant Penetrations and JointsAri Kamospecial
01/15/2025Tenant Protection Plan ComplianceAri Kamospecial
01/15/2025FinalAri Kamoprogress
01/15/2025Interior lighting powerAri Kamoenergy_progress
11/03/2023HVAC-R and service water heating equipmentTONY ONYEAGOROenergy_progress
11/03/2023Fire-Resistant Penetrations and JointsTONY ONYEAGOROspecial
11/03/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationTONY ONYEAGOROspecial
11/03/2023Sprinkler SystemsTONY ONYEAGOROspecial
11/03/2023Energy Code Compliance InspectionsTONY ONYEAGOROprogress
11/03/2023HVAC-R and service water piping design and insulationTONY ONYEAGOROenergy_progress
Latest 25 of 46.
▾Documents — 212 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch20
09/02/2026B00348361-S1Request digital key ↗
09/01/2026B00517322-I1Request digital key ↗
09/01/2026B00573501-P1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler6
09/02/2026B00348361-P3Request digital key ↗
09/02/2026B00348361-I1Request digital key ↗
09/02/2026B00348361-P4Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/02/2026B00348361-P3Request digital key ↗
09/02/2026B00348361-I1Request digital key ↗
09/02/2026B00348361-P5Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00394203-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00348350-I1Request digital key ↗
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION13
05/10/2024321591755Open ↗
04/12/2024321591755Open ↗
08/24/2023321591755Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION2
08/24/2021321591755Open ↗
08/24/2021321591755Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
08/03/2023340747115Open ↗
08/14/2020340747115Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/27/2023321591755Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
08/31/2022322109856Open ↗
11/09/2020321591755Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION2
08/31/2022322109856Open ↗
11/09/2020321591755Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
08/31/2022322109856Open ↗
10/28/2020321591755Open ↗
▸BISVERIFY TAX LOT1
07/24/2024321591755Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
12/11/2023321591755Open ↗
▸BISZONING DIAGRAM1
11/09/2020321591755Open ↗
▸Seals & Professional Certifications65
▸DOB NOWDPL-1: Design Professional Seal & Signature28
09/01/2026B00517322-I1Open ↗
09/01/2026B00573501-I1Open ↗
09/01/2026B00573501-P1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
08/31/2026B00348361-P4Open ↗
08/31/2026B00348361-P4Open ↗
08/31/2026B00348361-P4Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
08/31/2026B00348361-P4Open ↗
08/31/2026B00348361-P4Open ↗
08/31/2026B00348361-P4Open ↗
Showing 3 of 17 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/14/2020340747115Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/14/2020340747115Open ↗
▸Trade Schedules & Equipment5
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
07/05/2023321591755Open ↗
08/16/2021321591755Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
08/16/2021321591755Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
07/03/2024321591755Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
07/03/2024321591755Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST2
12/31/2020340747115Open ↗
10/28/2020321591755Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
10/28/2020321591755Open ↗
▸BISBPP: STREET TREES SITE PLAN1
08/14/2020340747115Open ↗
▸BISSTREET TREE SIGNOFF1
06/27/2024321591755Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
06/28/2024321591755Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/16/2021321591755Open ↗
10/28/2020321591755Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
07/01/2024321591755Open ↗
06/28/2024321591755Open ↗
▸BISINTERIOR LIGHTING POWER1
06/28/2024321591755Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
06/28/2024321591755Open ↗
▸BISFENESTRATION AREAS1
06/28/2024321591755Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
06/28/2024321591755Open ↗
▸BISLIGHTING IN DWELLING UNITS1
06/28/2024321591755Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/09/2024321591755Open ↗
▸BISLIGHTING CONTROLS1
06/28/2024321591755Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/28/2024321591755Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
06/28/2024321591755Open ↗
▸BISEXTERIOR LIGHTING POWER1
06/28/2024321591755Open ↗
▸BISFENESTRATION AIR LEAKAGE1
06/28/2024321591755Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00348361-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00348350-I1Open ↗
▸Inspections & Test Reports23
▸BISTECHNICAL REPORT: RESPONSIBILITY7
08/16/2021321591755Open ↗
08/16/2021321591755Open ↗
10/28/2020321591755Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
09/12/2023321591755Open ↗
08/16/2021321591755Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
10/28/2020321591755Open ↗
08/06/2020321591755Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
09/18/2023321591755Open ↗
08/16/2021321591755Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
08/24/2021321591755Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
06/28/2024321591755Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
06/28/2024321591755Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
06/28/2024321591755Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
07/28/2023321591755Open ↗
▸BISPOST-INSTALLED ANCHORS1
12/11/2023321591755Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
06/28/2024321591755Open ↗
▸BISSOIL REPORT1
11/09/2020321591755Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
08/16/2021321591755Open ↗
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT1
08/24/2021321591755Open ↗
▸Approvals, Objections & Sign-offs17
▸BISSCHEDULE A - OCCUPANCY / USE9
05/10/2024321591755Open ↗
04/18/2024321591755Open ↗
04/12/2024321591755Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
06/28/2024321591755Open ↗
08/31/2022322109856Open ↗
08/31/2022322109856Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
03/27/2024340747115Open ↗
▸BISHPD: INCLUSIONARY HOUSING LETTER1
08/03/2020321591755Open ↗
▸BISCERTIFICATE OF OCCUPANCY1
07/28/2023321591755Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION5
09/01/2023321591755Open ↗
08/03/2023340747115Open ↗
11/12/2021321591755Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET3
08/22/2022322109856Open ↗
06/26/2020321591755Open ↗
06/02/2020321591755Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/14/2020340747115Open ↗
▸Other Documents4
▸BISSUSTAINABLE ROOF ZONE FORM1
10/28/2020321591755Open ↗
▸BISUNDERPINNING (2014)1
06/28/2024321591755Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
06/28/2024321591755Open ↗
▸BISPLOT DIAGRAM1
08/31/2022322109856Open ↗