Office, 20+ stories, with or without commercial
494 8 AVENUE
MANHATTAN · BIN 1014419
💬 Discuss this project
1928Year Built
23Stories
O4Building Class
M1-9A/R12Zoning
111,274 sfGross Floor Area
42Units
LL97 Covered4 Open Violations ▸FISP: SAFE
Office, 20+ stories, with or without commercial · Owner of record: 494 EIGHTH AVENUE LLC · 4,837 sf lot · 23 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
4 jobs · most recent 12/18/2025
General Wiring
FiledStatusContractorScope
12/18/2025Permit IssuedMIKOMA ELECTRIC LLCGeneral Wiring
10/11/2019Permit IssuedUPDATE SYSTEMS ELECTRICALGeneral Wiring
04/15/2019Permit IssuedMAXIMUM ELECTRIC CORP.General Wiring
12/07/2018CompleteGREEN POWER ELECTRIC CORP—
1 job · most recent 04/12/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
04/12/2024Permit IssuedM & L SIGNS, INCSuspended Scaffold (SC)
Building Lifecycle
All (119)Filed (9)Permit Issued (13)Signed Off (8)Facade (FISP) (16)Violation (60)Inspection (4)Special Inspection (9)
07/24/2025
Permit issued — Suspended Scaffold
M01034593-I1-SC
05/12/2025
Signed off — Alteration
APPLICATION FILED FOR AN INTERIOR RENOVATION OF AN EXISTING RETAIL SPACE TO INSTALL WATER SUPPLY LINES AS NECESSARY. APPLICATION INCLUDES RELOCATION OF 3 SPRINKLER HEADS TO RETROFIT NEW TENANT LAYOUT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01015536-I1
05/08/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/18/2025
Signed off — Alteration
APPLICATION FILED FOR AN ALTERATION OF AN EXISTING RETAIL SPACE INCLUDING NEW NONLOAD BEARING PARTITIONS, FINISHES, LIGHTING, SIGNAGE, AND ALL OTHER RELATED WORK AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01015330-I1
10/24/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/22/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/10/2024
Permit issued — General Construction
M01015330-I1-GC
07/03/2024
Permit issued — Sprinklers
M01015536-I1-PL
07/02/2024
Permit issued — Sprinklers
M01015536-I1-EW-SP
06/13/2024
Filed — Alteration
APPLICATION FILED FOR AN INTERIOR RENOVATION OF AN EXISTING RETAIL SPACE TO INSTALL WATER SUPPLY LINES AS NECESSARY. APPLICATION INCLUDES RELOCATION OF 3 SPRINKLER HEADS TO RETROFIT NEW TENANT LAYOUT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01015536-I1
06/13/2024
Filed — Alteration
APPLICATION FILED FOR AN ALTERATION OF AN EXISTING RETAIL SPACE INCLUDING NEW NONLOAD BEARING PARTITIONS, FINISHES, LIGHTING, SIGNAGE, AND ALL OTHER RELATED WORK AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01015330-I1
04/16/2024
Permit issued — Suspended Scaffold
M01034593-I1-SC
04/12/2024
Filed — Alteration
WALL PAINTING VIA SUSPENDED SCAFFOLDS
M01034593-I1
02/18/2021
Signed off — Alteration
REPLACEMENT OF EXISTING 10 TON SPLIT SYSTEM WITH 10 TON HORIZONTAL CEILING SPLIT SYSTEM SEPARATED INTO CONDENSER AND EVAPORATOR SECTION. ALL NEW REFRIGERANT, PIPING LINES, CONNECTING CONDENSER, AND EVAPORATOR SECTIONS WILL REMAIN INSIDE STORE SPACE.
M00396961-I1
01/26/2021
Permit issued — Mechanical Systems
M00396961-I1-MS
01/12/2021
Filed — Alteration
REPLACEMENT OF EXISTING 10 TON SPLIT SYSTEM WITH 10 TON HORIZONTAL CEILING SPLIT SYSTEM SEPARATED INTO CONDENSER AND EVAPORATOR SECTION. ALL NEW REFRIGERANT, PIPING LINES, CONNECTING CONDENSER, AND EVAPORATOR SECTIONS WILL REMAIN INSIDE STORE SPACE.
M00396961-I1
09/10/2020
Special inspection requirement — Mechanical Systems
jon libasci
09/10/2020
Special inspection requirement — Final
Vance Schipani
09/10/2020
Special inspection requirement — HVAC and service water heating system controls
Vance Schipani
09/10/2020
Special inspection requirement — HVAC and service water heating equipment
Vance Schipani
07/24/2020
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00321922-I1
07/09/2020
Cycle 9 facade report submitted
07/08/2020
Violation issued (ECB, closed)
Construction
06/22/2020
Cycle 9 facade inspection completed
06/17/2020
Signed off — Alteration
INSTALLATION OF TEMPORARY (59'-65') HIGH PIPE SCAFFOLD ORIGINATING (AT VARIOUS LEVELS) FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
M00230101-I1
06/10/2020
Violation issued (ECB, closed)
Construction
06/09/2020
Cycle 9 facade report signed — SAFE
02/28/2020
Permit issued — Sidewalk Shed
M00321922-I1-SH
02/25/2020
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00321922-I1
02/25/2020
Violation issued (ECB, closed)
Construction
02/25/2020
Violation issued (ECB, closed)
Construction
02/25/2020
Special inspection requirement — Final
JOEL PHAGOO
02/14/2020
Signed off — Alteration
M00245546-I1
02/11/2020
Cycle 8 facade inspection completed
02/04/2020
Cycle 8 facade report signed — SAFE
01/28/2020
Permit issued — Mechanical Systems
M00245546-I1-MS
12/09/2019
Cycle 8 facade report submitted
12/02/2019
Filed — Alteration
M00245546-I1
11/09/2019
Violation issued (ECB, closed)
Construction
11/09/2019
Violation issued (ECB, closed)
Construction
11/06/2019
Signed off — Alteration
M00133216-I1
10/14/2019
Special inspection requirement — Mechanical Systems
NICHOLAS BARILE
10/14/2019
Special inspection requirement — Final
NICHOLAS BARILE
10/14/2019
Special inspection requirement — HVAC and service water heating system controls
NICHOLAS BARILE
09/25/2019
Filed — Alteration
INSTALLATION OF TEMPORARY (59'-65') HIGH PIPE SCAFFOLD ORIGINATING (AT VARIOUS LEVELS) FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
M00230101-I1
09/25/2019
Permit issued — Supported Scaffold
M00230101-I1-SF
04/25/2019
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
M00065668-I1
04/15/2019
Permit issued — Construction Fence
M00133216-I1-FN
03/15/2019
Filed — Alteration
M00133216-I1
02/14/2019
Cycle 8 facade report submitted
02/14/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/08/2019
Permit issued — Sidewalk Shed
M00065668-I1-SH
02/04/2019
Cycle 8 facade inspection completed
01/13/2019
Cycle 8 facade report signed — UNSAFE
01/11/2019
Permit issued — Sidewalk Shed
M00065668-I1-SH
12/11/2018
Permit issued — Sidewalk Shed
M00065668-I1-SH
12/10/2018
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
M00065668-I1
07/27/2018
Special inspection requirement — Final
JOEL PHAGOO
07/16/2018
Violation issued (ECB, closed)
Local Law
Latest 60 of 119 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GENERAL LEASING MANAGEMENT3107/08/2026
CREW CONTRACTING OF NJ1107/08/2026
NEW YORK ENGINEERING404/09/2026
494 EIGHTH AVENUE1503/22/2026
CISCO GENERAL CONSTR INC103/22/2026
254 WEST 35TH STREET CORP103/22/2026
264 WEST 35ST CORP103/22/2026
264 W 35 ST1103/22/2026
264 W 35 ST GROUP103/22/2026
264 WEST 35 ST CORP1403/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK DESIGN ARCHITECT LLP603/21/2026
GC1 EXPEDITING203/21/2026
RIGGING CONSULTANTS203/21/2026
A1 EXPEDITING SERVICE403/21/2026
DYNAMIC BUILDING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CREW CONTRACTING OF NJ INCGeneral Contractor807/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor203/21/2026
PIECE MANAGEMENT INCGeneral Contractor203/21/2026
TRANSCEND WIRELESS LLCGeneral Contractor203/21/2026
MIKOMA ELECTRIC LLCElectrical203/22/2026
L.L.G. PLBG & HTG INCPlumbing107/08/2026
CAPITOL FIRE SPRINKLER COFire Protection107/08/2026
DGC CAPITAL CONTRACTING CORPGeneral Contractor107/08/2026
CIMENT, BARRYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AKS ARCHITECTURAL & ENGIN1957206/13/2024
JON LIBASCI3068101/12/2021
ELEVATED ENGINEERING PLLC3692112/02/2019
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedM & L SIGNS, INC07/24/2025
DOB NOWGeneral ConstructionSigned-offDGC CAPITAL CONTRACTING CORP07/10/2024
DOB NOWSprinklersSigned-offL.L.G. PLBG & HTG INC07/03/2024
DOB NOWSprinklersSigned-offCAPITOL FIRE SPRINKLER CO07/02/2024
DOB NOWSuspended ScaffoldPermit IssuedM & L SIGNS, INC04/16/2024
DOB NOWMechanical SystemsSigned-offKABACK ENTERPRISES01/26/2021
DOB NOWSidewalk ShedSigned-offCREW CONTRACTING OF NJ IN02/28/2020
DOB NOWMechanical SystemsSigned-offTRANSCEND WIRELESS LLC01/28/2020
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC09/25/2019
DOB NOWConstruction FenceSigned-offPIECE MANAGEMENT INC04/15/2019
DOB NOWSidewalk ShedSigned-offCREW CONTRACTING OF NJ IN02/08/2019
DOB NOWSidewalk ShedSigned-offCREW CONTRACTING OF NJ IN01/11/2019
DOB NOWSidewalk ShedSigned-offCREW CONTRACTING OF NJ IN12/11/2018
BISOTISSUEDL.E.C.INC03/31/2021
BISOTISSUEDL.E.C.INC03/17/2021
BISOTISSUEDACCURA REST.& WATERPROOF02/28/2020
BISOTISSUEDACCURA REST.& WATERPROOF06/28/2019
BISOTISSUEDACCURA REST.& WATERPROOF04/19/2019
BISOTISSUEDPIECE MANAGEMENT INC04/19/2019
BISPLISSUEDHYDRO MECHANICAL INC04/17/2019
BISOTISSUEDPIECE MANAGEMENT INC03/25/2019
BISPLISSUEDARIANA CONTRACTING INC08/03/2017
BISOTISSUEDV B CONSTRUCTION LLC06/28/2017
BISEQISSUEDV B CONSTRUCTION LLC06/28/2017
BISPLISSUEDSO PLUMBING & HEATING INC05/05/2015
BISOTISSUEDHAPPY GARDEN CONSTR. CORP05/01/2015
BISEQISSUEDCISCO GENERAL CONSTRUCT04/23/2012
BISOTISSUEDCISCO GENERAL CONSTRUCT01/25/2012
BISEQISSUEDCISCO GENERAL CONSTRUCT12/01/2011
BISOTISSUEDGREENPOINT CONSTRUCTION C11/22/2011
BISEQISSUEDGREENPOINT CONSTRUCTION C11/22/2011
BISPLISSUEDROY B PLUMBING & HEATING11/10/2011
BISPLISSUEDROY B PLUMBING & HEATING09/16/2011
BISEQISSUEDCISCO GENERAL CONSTRUCT05/24/2011
BISPLISSUEDDNA PLUMBING CONTR. INC09/16/2009
BISMHISSUEDGABE CONSTRUCTION AND DEVELOP08/21/2009
BISOTISSUEDJ.A. LEE ELECTRIC INC10/23/2007
BISMHISSUEDWIRELESS SITES DEVELOPMENT NEW02/21/2007
BISOTISSUEDSATKARTAR GROUP DEVELOPMENT INC09/19/2006
BISEQISSUEDCOLGATE SCAFFOLDING & EQUIP CO08/28/2006
+ 23 more permits on file
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/08/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/24/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/22/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
09/10/2020Mechanical Systemsjon libascispecial
09/10/2020FinalVance Schipaniprogress
09/10/2020HVAC and service water heating system controls Vance Schipanienergy_progress
09/10/2020HVAC and service water heating equipment Vance Schipanienergy_progress
02/25/2020FinalJOEL PHAGOOprogress
10/14/2019Mechanical SystemsNICHOLAS BARILEspecial
10/14/2019FinalNICHOLAS BARILEprogress
10/14/2019HVAC and service water heating system controls NICHOLAS BARILEenergy_progress
07/27/2018FinalJOEL PHAGOOprogress
▾Documents — 243 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch4
09/06/2026M00065668-I1Request digital key ↗
08/27/2026M01034593-I1Request digital key ↗
08/27/2026M01015536-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00245546-I1Request digital key ↗
09/04/2026M00396961-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00133216-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00321922-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00230101-I1Request digital key ↗
▸Applications & Permits39
▸BISWORK PERMIT APPLICATION19
03/17/2021123909093Open ↗
06/28/2019123407937Open ↗
04/22/2019140837325Open ↗
Showing 3 of 19 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION19
07/31/2020123768841Open ↗
10/25/2019123407937Open ↗
10/24/2019123407937Open ↗
Showing 3 of 19 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
05/07/2020123909093Open ↗
▸Seals & Professional Certifications65
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION28
10/25/2019140837325Open ↗
10/25/2019140837325Open ↗
10/25/2019140837325Open ↗
Showing 3 of 28 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
10/24/2019123407937Open ↗
10/24/2019123407937Open ↗
10/03/2019123768841Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/05/2026M00133216-I1Open ↗
08/27/2026M01015536-I1Open ↗
08/27/2026M01015330-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026M00065668-I1Open ↗
08/28/2026M00396961-I1Open ↗
08/28/2026M00396961-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
06/18/2019123768841Open ↗
03/15/2019140837325Open ↗
11/13/2018123407937Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
12/02/2011120913039Open ↗
11/07/2011120879460Open ↗
05/23/2011120696452Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026M00396961-I1Open ↗
08/22/2026M00245546-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/15/2019140837325Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/15/2019140837325Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
08/24/2017121230337Open ↗
06/13/2017121230337Open ↗
05/08/2015122387559Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
07/06/2015122387559Open ↗
06/14/2011120108436Open ↗
06/14/2011120108436Open ↗
▸BISSCHEDULE B - PLUMBING2
03/15/2019140837325Open ↗
07/18/2009120108436Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
12/19/2011110037111Open ↗
▸Safety & Tenant Protection10
▸BISTenant Protection Plan and Notes4
10/25/2019123407937Open ↗
10/24/2019123407937Open ↗
10/24/2019123407937Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHPD-1: Anti-Harassment Area Checklist4
08/13/2026M00321922-I1Open ↗
08/13/2026M00230101-I1Open ↗
08/13/2026M00245546-I1Open ↗
Showing 3 of 4 on file for this type
▸BISANTI-HARASSMENT CHECKLIST1
11/13/2018123407937Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00230101-I1Open ↗
▸Environmental & Asbestos19
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
12/29/2010120380701Open ↗
08/05/2010120380701Open ↗
08/05/2010120380701Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
05/07/2020123909093Open ↗
03/15/2019140837325Open ↗
11/13/2018123407937Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026M01015536-I1Open ↗
08/27/2026M01015330-I1Open ↗
08/13/2026M00245546-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/23/2011120696452Open ↗
▸DOB NOWACP5/20/21 or V51
08/13/2026M00245546-I1Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
10/25/2019140837325Open ↗
10/25/2019140837325Open ↗
06/18/2019123768841Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
05/17/2021123909093Open ↗
08/11/2020123407937Open ↗
05/07/2020123909093Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
05/17/2021123909093Open ↗
10/25/2019140837325Open ↗
▸BISNYCECC ANALYSIS1
03/15/2019140837325Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/15/2019140837325Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/11/2020123407937Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
05/17/2021123909093Open ↗
08/11/2020123407937Open ↗
05/07/2020123909093Open ↗
▸Approvals, Objections & Sign-offs34
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
05/17/2021123909093Open ↗
08/11/2020123407937Open ↗
10/25/2019140837325Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWTransit Authority Approval7
08/13/2026M00065668-I1Open ↗
08/13/2026M01015330-I1Open ↗
08/13/2026M01015536-I1Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
12/02/2011120913039Open ↗
05/23/2011120696452Open ↗
08/09/2010120380701Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
06/09/2017121230337Open ↗
04/30/2013120696452Open ↗
04/30/2013120913039Open ↗
Showing 3 of 4 on file for this type
▸BISSHED LETTER1
04/26/2012120696452Open ↗
▸BISSUPERSEDING LETTER1
06/28/2019123407937Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
03/15/2019140837325Open ↗
▸Cost, Insurance & Ownership20
▸BISCOST AFFIDAVIT19
05/17/2021123909093Open ↗
05/07/2020123909093Open ↗
10/25/2019140837325Open ↗
Showing 3 of 19 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
08/11/2020123407937Open ↗
▸Filing & Intake Forms19
▸BISEFILING COVER SHEET9
05/08/2020123909093Open ↗
06/18/2019123768841Open ↗
11/13/2018123407937Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION6
03/10/2021123909093Open ↗
10/25/2019123407937Open ↗
04/04/2019123407937Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM3
10/25/2019140837325Open ↗
10/24/2019123407937Open ↗
08/24/2017121230337Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/15/2019140837325Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026M01034593-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01034593-I1Open ↗