← Back
BuildNYC
Predominantly retail with other uses
496 CLARKSON AVENUE
BROOKLYN · BIN 3107788
💬 Discuss this project
1930Year Built
1Stories
K4Building Class
R5Zoning
4,468 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: 492-498 Clarkson Owners · 4,468 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofNew hood, exhaust fan, and make-up air unit installation12p · 2 filings · 12 docs
Floor 1New hood, exhaust fan, and make-up air unit installation19p · 3 filings · 19 docs
CellarConcrete sidewalk construction11p · 2 filings · 19 docs
Site & exteriorBagels Salads Ur Way1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Liberty Properties Co603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Sohail Humayun P E504/07/2025
Leon Skvirsky PE110/04/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Building Brothers203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Starlite Plumbing & HeatingPlumbing507/08/2026
Global Luxury ServicesGeneral Contractor307/08/2026
DirnoGeneral Contractor107/08/2026
Paul SignsSign hanger107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sohail Humayun P E8457104/07/2025
Ashraf1973210/22/2021
Building Lifecycle
All (30)Filed (6)Permit Issued (5)Signed Off (3)Inspection (7)Objection (4)Special Inspection (5)
04/08/2025
Permit issued — Mechanical Systems
B01207048-I1-MS
04/07/2025
Filed — Alteration
APPLICATION FILED TO INSTALL NEW HOOD, EXHAUST FAN, MAKE-UP AIR UNIT, AND ASSOCIATED DUCT AS PER PLAN AT FIRST FLOOR. NO CHANGE IN BULK, FLOOR AREA, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01207048-I1
12/10/2021
Signed off — Alteration
RENOAVTION TO EXISTING TENANT COMMETCIAL SPACE (STORE) AT EXISTING 1 STORY BUILDING, SCOPE OF WORK INCLUDE NEW INTERIOR PARTIIONS, FINISHES, NEW COUNTERS, AND CEILING WORK. NO CHANGE IN BULK FLOOR AREA, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00525414-I1
12/08/2021
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/29/2021
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/19/2021
Signed off — Alteration
B00598336-I1
11/10/2021
Special inspection requirement — Mechanical Systems
AKM HOQUE
11/10/2021
Special inspection requirement — Energy Code Compliance Inspections
SOHAIL HUMAYUN
11/10/2021
Special inspection requirement — Final
SOHAIL HUMAYUN
11/10/2021
Special inspection requirement — Interior lighting power
SOHAIL HUMAYUN
11/10/2021
Special inspection requirement — Lighting controls
SOHAIL HUMAYUN
11/08/2021
Objection resolved — Addressed
10/27/2021
Objection raised — Other
10/26/2021
Objection raised — Other
10/26/2021
Objection resolved — Addressed
10/22/2021
Filed — Alteration
RENOAVTION TO EXISTING TENANT COMMETCIAL SPACE (STORE) AT EXISTING 1 STORY BUILDING, SCOPE OF WORK INCLUDE NEW INTERIOR PARTIIONS, FINISHES, NEW COUNTERS, AND CEILING WORK. NO CHANGE IN BULK FLOOR AREA, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00525414-P1
10/06/2021
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/05/2021
Permit issued — Sign
B00598336-I1-SG
10/04/2021
Filed — Alteration
B00598336-I1
10/01/2021
Permit issued — General Construction
B00525414-I1-GC-CX
09/23/2021
Signed off — Alteration
FILING FOR PLUMBING FIXTURES IN EXISTING COMMERICAL SPACE, NO CHANGEIN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00524634-I1
09/09/2021
Filed — Alteration
FILING FOR PLUMBING FIXTURES IN EXISTING COMMERICAL SPACE, NO CHANGEIN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00524634-P1
08/27/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/15/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/15/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/01/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/29/2021
Permit issued — Mechanical Systems
B00525414-I1-GC-CX
06/18/2021
Permit issued — Plumbing
B00524634-I1-PL
05/27/2021
Filed — Alteration
RENOAVTION TO EXISTING TENANT COMMETCIAL SPACE (STORE) AT EXISTING 1 STORY BUILDING, SCOPE OF WORK INCLUDE NEW INTERIOR PARTIIONS, FINISHES, NEW COUNTERS, AND CEILING WORK. NO CHANGE IN BULK FLOOR AREA, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00525414-I1
05/27/2021
Filed — Alteration
FILING FOR PLUMBING FIXTURES IN EXISTING COMMERICAL SPACE, NO CHANGEIN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00524634-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedDirno04/08/2025
DOB NOWSignSigned-offPaul Signs10/05/2021
DOB NOWGeneral ConstructionSigned-offGlobal Luxury Services10/01/2021
DOB NOWMechanical SystemsSigned-offGlobal Luxury Services06/29/2021
DOB NOWPlumbingSigned-offStarlite Plumbing & Heating06/18/2021
BISOTISSUEDOvr05/16/2007
BISPLISSUEDHaron Plumbing & Heating10/13/2004
BISOTISSUEDMetro Interior Remodeling10/10/2003
BISMHISSUEDMarta Construction03/22/2001
BISPLISSUEDAll Pro Plumbing & Heating02/24/2000
BIS—ISSUEDInterboro Sign & Maintenance Co02/03/1998
BIS—ISSUEDSuper Neon Lights Co02/12/1997
BISPLISSUEDAll Pro Plumbing & Heating01/14/1997
BISEQISSUEDNargen Construction01/13/1997
BISMHISSUEDMargen Construction01/13/1997
BISPLISSUEDMarathon Plumbing & Heating10/19/1994
BISMHISSUEDMetro Air Tek10/03/1994
1 project · most recent 04/07/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/07/2025Permit IssuedDirnoVentilation Systems
Ventilation
1 project · most recent 10/07/2021
FiledStatusContractorScope
10/07/2021Permit IssuedEmpire State Electl—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
12/08/2021Pass-Final General Construction Non-Directive 14PassView ↗
11/29/2021Fail-Final General Construction Non-Directive 14FailView ↗
10/06/2021Fail-Final General Construction Non-Directive 14FailView ↗
08/27/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/15/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/15/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/01/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/10/2021Mechanical SystemsAKM HOQUEspecial
11/10/2021Energy Code Compliance InspectionsSOHAIL HUMAYUNprogress
11/10/2021FinalSOHAIL HUMAYUNprogress
11/10/2021Interior lighting powerSOHAIL HUMAYUNenergy_progress
11/10/2021Lighting controlsSOHAIL HUMAYUNenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Bagels Salads Ur WayRestaurant / Food ServiceFloor 1
Project B00598336 Alteration · LOC Issued · 10/04/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00524634-P1Request digital key ↗
09/01/2026B00524634-I1Request digital key ↗
09/01/2026B00525414-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00524634-P1Open ↗
09/01/2026B00524634-I1Open ↗
09/01/2026B00525414-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026B00525414-I1Open ↗
08/28/2026B00525414-I1Open ↗
08/28/2026B00525414-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026B00525414-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00524634-I1Open ↗
09/01/2026B00524634-P1Open ↗
09/01/2026B00525414-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00525414-I1Open ↗
08/13/2026B00524634-I1Open ↗