| Firm | Filings | Most Recent |
|---|---|---|
| DESIGN GROUP IN H&K LLC | 6 | 03/24/2026 |
| VIBRANCY CONSULTING CORPORATION | 3 | 12/12/2025 |
| Representative | Filings | Most Recent |
|---|---|---|
| DESIGN GROUP IN H K | 12 | 03/21/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| BIS | EQ | ISSUED | 843 LLC | 04/11/2007 |
| BIS | — | ISSUED | 843 LLC | 04/11/2007 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/24/2026 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Lg ARNU053TRD4 6,100 BTU · Vrf Indoor ×7 ARNUS43TAA4 13,500 BTU · Vrf Indoor ×5 ARNU283TAA4 31,500 BTU · Vrf Indoor ×4 ARNU123TRD4 27,300 BTU · Vrf Indoor ×2 ARUM072BTE5 72,000 BTU · Vrf Outdoor ×2 ARNU243TAA4 27,300 BTU · Vrf Indoor ×1 ARUM036GSS 36,000 BTU · Vrf Outdoor ×1 ARUM121BTE5 119,700 BTU · Vrf Outdoor ×1 KUSXB121A 12,000 BTU · Condensing Unit ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/24/2026 | — | — | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/24/2026 | — | — | Steel, Concrete, Masonry |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 02/09/2026 | Fenestration air leakage | — | energy_progress |
| 02/09/2026 | Fenestration areas | — | energy_progress |
| 02/09/2026 | Insulation placement and R values | — | energy_progress |
| 02/09/2026 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 02/09/2026 | Concrete - Cast-In-Place | — | special |
| 02/09/2026 | Sprayed fire-resistant materials | — | special |
| 02/09/2026 | Structural Steel - High Strength Bolting | — | special |
| 02/09/2026 | Structural Steel - Welding | — | special |
| 02/09/2026 | Subgrade Inspections | — | special |
| 02/09/2026 | Designated Seismic System | — | special |
| 02/09/2026 | Masonry | — | special |
| 02/09/2026 | Structural Steel - Details | — | special |
| 02/09/2026 | Energy Code Compliance Inspections | — | progress |
| 02/09/2026 | Fire-Resistance Rated Construction | — | progress |
| 02/09/2026 | Final | — | progress |
| 02/09/2026 | Footing and Foundation | — | progress |
| 02/09/2026 | Air barrier - visual inspection | — | energy_progress |
| 12/11/2025 | Structural Stability – Alterations of existing buildings | — | special |
| 12/11/2025 | Subsurface Investigations (Borings/Test Pits) | DAVID WASHINGTON | special |
| 12/11/2025 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 09/01/2025 | Construction Operations Influencing Adjacent Structures | — | special |
| 09/01/2025 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 09/01/2025 | Final | — | progress |
| 02/26/2025 | Protection of exposed foundation insulation | — | energy_progress |
| 02/26/2025 | Electrical motors and elevators | — | energy_progress |