← Back
Predominantly retail with other uses
497 TINTON AVENUE
BRONX · Mott Haven-Port Morris · BIN 2093975
💬 Discuss this project
1910Year Built
2Stories
K4Building Class
R7-1Zoning
7,873 sfGross Floor Area
6Units
Rent Stabilized14 Open Violations ▸
Predominantly retail with other uses · Owner of record: CYC GROUP LLC · 10,000 sf lot · 0.79 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingCivil
Floor 12p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GOLDEN KEY MANAGEMENT CORP.1103/22/2026
CYC GROUP LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MADRIAGA ENGINEERING P.C.304/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CHOIDESIGNCONSULTING303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NILCOMAT INCGeneral Contractor303/21/2026
PLUMBING NYC INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
J&R DESIGN AND INSPECTION6637304/08/2025
Building Lifecycle
All (62)Filed (3)Permit Issued (2)Signed Off (1)Violation (51)Inspection (3)Special Inspection (2)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/30/2025
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL LAUNDROMAT WORK INCLUDES REPLACE WASHERS, DRYERS, DRYER VENT, A/C INSTALLATION AND MODIFY EXISTING CONCRETE PAD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01092480-S1
04/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
04/08/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL LAUNDROMAT WORK INCLUDES REPLACE WASHERS, DRYERS, DRYER VENT, A/C INSTALLATION AND MODIFY EXISTING CONCRETE PAD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01092480-P1
12/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
12/16/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/30/2024
Permit issued — Plumbing
X01092480-S1-PL
08/21/2024
Permit issued — General Construction
X01092480-I1-GC-CX
08/19/2024
Filed — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL LAUNDROMAT WORK INCLUDES REPLACE WASHERS, DRYERS, DRYER VENT, A/C INSTALLATION AND MODIFY EXISTING CONCRETE PAD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01092480-S1
08/19/2024
Filed — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL LAUNDROMAT WORK INCLUDES REPLACE WASHERS, DRYERS, DRYER VENT, A/C INSTALLATION AND MODIFY EXISTING CONCRETE PAD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01092480-I1
11/27/2023
Violation issued (HPD, closed)
I
05/01/2023
Violation issued (HPD, open)
B
05/01/2023
Violation issued (HPD, open)
B
05/01/2023
Violation issued (HPD, open)
B
05/01/2023
Violation issued (HPD, closed)
C
04/23/2023
Violation issued (HPD, closed)
C
04/23/2023
Violation issued (HPD, open)
C
10/27/2017
Violation issued (HPD, open)
C
10/27/2017
Violation issued (HPD, open)
A
09/22/2017
Violation issued (HPD, open)
C
06/23/2017
Violation issued (HPD, closed)
B
06/23/2017
Violation issued (HPD, closed)
B
06/23/2017
Violation issued (HPD, closed)
C
06/23/2017
Violation issued (HPD, closed)
C
06/21/2017
Violation issued (HPD, open)
C
06/21/2017
Violation issued (HPD, open)
C
06/21/2017
Violation issued (HPD, open)
C
06/21/2017
Violation issued (HPD, closed)
C
06/21/2017
Violation issued (HPD, closed)
C
06/21/2017
Violation issued (HPD, closed)
B
06/21/2017
Violation issued (HPD, closed)
C
06/21/2017
Violation issued (HPD, closed)
B
02/16/2017
Violation issued (HPD, closed)
B
02/16/2017
Violation issued (HPD, closed)
B
02/16/2017
Violation issued (HPD, closed)
B
08/02/2015
Violation issued (HPD, closed)
A
08/02/2015
Violation issued (HPD, closed)
B
08/02/2015
Violation issued (HPD, closed)
B
08/02/2015
Violation issued (HPD, closed)
B
08/02/2015
Violation issued (HPD, closed)
B
08/02/2015
Violation issued (HPD, closed)
A
08/02/2015
Violation issued (HPD, closed)
A
04/18/2015
Violation issued (HPD, closed)
B
04/18/2015
Violation issued (HPD, closed)
C
04/18/2015
Violation issued (HPD, closed)
C
04/18/2015
Violation issued (HPD, closed)
B
04/18/2015
Violation issued (HPD, closed)
B
04/18/2015
Violation issued (HPD, closed)
B
04/18/2015
Violation issued (HPD, open)
C
04/18/2015
Violation issued (HPD, closed)
A
04/18/2015
Violation issued (HPD, closed)
B
04/18/2015
Violation issued (HPD, closed)
B
09/06/2014
Violation issued (HPD, closed)
B
09/06/2014
Violation issued (HPD, closed)
B
09/06/2014
Violation issued (HPD, open)
A
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPLUMBING WORKS NYC INC08/30/2024
DOB NOWGeneral ConstructionPermit IssuedNILCOMAT INC08/21/2024
BISBLISSUEDBRONZE PLUMBING & HEATING04/07/2003
BISPLISSUEDBRONZE PLUMBING & HEATING CORP12/10/2002
BISOTISSUEDLUIS FERMIN10/17/2002
1 project · most recent 04/08/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/08/2025Permit IssuedNILCOMAT INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin FTXC24AXVJU 24,000 BTU · Split System ×3
RXC24AXVJU 24,000 BTU · Condensing Unit ×3
Ventilation
__Junk__ REPLACE DRYER VENT 1 CFM ×1
1 project · most recent 04/08/2025
Gas Water/Sanitary
FiledStatusContractorScope
04/08/2025Signed-offPLUMBING NYC INCGas, Water/Sanitary
1 project · most recent 03/03/2024
FiledStatusContractorScope
03/03/2024CompleteCL ELECTRICAL CORP4 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
04/14/2025Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
12/17/2024Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026X01092480-P1Request digital key ↗
08/21/2026X01092480-I1Request digital key ↗
08/21/2026X01092480-S1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026X01092480-S1Open ↗
08/21/2026X01092480-I1Open ↗
08/21/2026X01092480-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026X01092480-P1Open ↗
08/25/2026X01092480-S1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026X01092480-S1Open ↗
08/21/2026X01092480-P1Open ↗
08/21/2026X01092480-I1Open ↗