← Back
BuildNYC
Elevator apt, semi-fireproof with stores
Columbia Street Commons
498 COLUMBIA STREET · BIN 3429956
💬 Discuss this project
2025Year Built
9Stories
D7Building Class
R6Zoning
308,833 sfGross Floor Area
372Units
5 Active Violations 4 unresolved · 1 paperwork only 19 old, status unconfirmed ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: Red Hook Building C Lihtc · 57,263 sf lot · 5.39 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projects498156 Columbia Street LLC3 filings
RoofDemolition and sprinkler system capping3p · 2 filings
Floor 1Curb Cut4 filings
Site & exterior498-159 Columbia Street LLC4 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Bogopa Service603/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BSGNY203/21/2026
Yona Love Consulting Services3203/21/2026
Rigid Structural Design203/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Express Builders JBGeneral Contractor1307/08/2026
Best Mechanical ServicesPlumbing607/08/2026
Star CompaniessScaffold603/21/2026
Express Builders JBScaffold404/09/2026
Precision Hoist & Scaffo*Scaffold307/08/2026
Platinum Services NYScaffold303/21/2026
Star CompaniessGeneral Contractor303/21/2026
Tristate Fire SprinklersFire Protection207/08/2026
Rightway Plumbing and HeatingFire Protection207/08/2026
Jeco Electrical ServiceElectrical203/21/2026
Power Direct ElectricElectrical103/22/2026
New Wave Electric CoElectrical103/21/2026
Torres IvanElectrical103/21/2026
Sal Simeti ElectricalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Big Apple Group NY A Rma91682109/23/2026
Mje Consulting Engineering8522107/12/2023
H & O Engineering5595106/21/2023
Building Lifecycle
All (190)Filed (33)Permit Issued (31)Signed Off (11)Violation (40)Inspection (17)Objection (28)Special Inspection (30)
09/23/2026
Filed — New Building
subsequent filing for structural work
B00830930-B8
09/22/2026
Special inspection requirement — Protection of exposed foundation insulation
SOORJBALLY HARILALL
09/22/2026
Special inspection requirement — Interior lighting power
SOORJBALLY HARILALL
09/22/2026
Special inspection requirement — Preliminary
SOORJBALLY HARILALL
09/22/2026
Special inspection requirement — Vestibules
SOORJBALLY HARILALL
09/22/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SOORJBALLY HARILALL
09/22/2026
Special inspection requirement — Insulation placement and R values
SOORJBALLY HARILALL
09/22/2026
Special inspection requirement — Masonry
SOORJBALLY HARILALL
09/22/2026
Special inspection requirement — Lowest Floor Elevation
SOORJBALLY HARILALL
09/22/2026
Special inspection requirement — Air barrier — testing
SOORJBALLY HARILALL
09/22/2026
Special inspection requirement — Air barrier - visual inspection
SOORJBALLY HARILALL
09/22/2026
Special inspection requirement — Metering
SOORJBALLY HARILALL
09/22/2026
Special inspection requirement — Maintenance information
SOORJBALLY HARILALL
09/22/2026
Special inspection requirement — Fenestration areas
SOORJBALLY HARILALL
09/22/2026
Special inspection requirement — Lighting controls
SOORJBALLY HARILALL
09/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
09/22/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
SOORJBALLY HARILALL
09/22/2026
Special inspection requirement — Energy Code Compliance Inspections
SOORJBALLY HARILALL
09/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
SOORJBALLY HARILALL
09/22/2026
Special inspection requirement — Electrical motors and elevators
SOORJBALLY HARILALL
09/22/2026
Special inspection requirement — Exterior lighting power
SOORJBALLY HARILALL
09/22/2026
Special inspection requirement — Lighting in dwelling units
SOORJBALLY HARILALL
09/22/2026
Special inspection requirement — Ventilation and air distribution system
SOORJBALLY HARILALL
09/22/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SOORJBALLY HARILALL
09/22/2026
Special inspection requirement — Fenestration air leakage
SOORJBALLY HARILALL
08/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
SOORJBALLY HARILALL
08/19/2026
Special inspection requirement — Preliminary
SOORJBALLY HARILALL
08/19/2026
Special inspection requirement — Chimneys and vents
SOORJBALLY HARILALL
08/19/2026
Special inspection requirement — Lowest Floor Elevation
SOORJBALLY HARILALL
08/19/2026
Special inspection requirement — Energy Code Compliance Inspections
SOORJBALLY HARILALL
08/19/2026
Special inspection requirement — Metering
SOORJBALLY HARILALL
08/12/2026
Objection resolved — Addressed
07/07/2026
Objection resolved — Addressed
07/02/2026
Signed off — Alteration
B01091942-I1
07/01/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/16/2026
Signed off — Alteration
Proposed construction fence. No change to use, egress or occupancy under this application.
B00899787-I1
06/08/2026
Objection resolved — Addressed
06/06/2026
Objection raised — Other
06/06/2026
Objection raised — Other
06/06/2026
Objection raised — Other
06/05/2026
Filed — New Building
subsequent filing for structural work
B00830930-B5
06/05/2026
Filed — New Building
subsequent filing for structural work
B00830930-B7
06/04/2026
Signed off — Alteration
application filed for temp standpipe
B01164922-I1
06/03/2026
Permit issued — Curb Cut
B01091942-I1-CC
05/18/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/13/2026
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01240694-I1
05/13/2026
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01240708-I1
05/13/2026
Signed off — Alteration
Installation of 7,000# temporary dual cars personnel hoists in conjunction with NB# B00830930-I1 per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01241875-I1
04/24/2026
Objection raised — Admin
04/20/2026
Filed — New Building
subsequent filing for structural work
B00830930-B6
04/13/2026
Objection resolved — Addressed
03/27/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/26/2026
Objection raised — Zoning
03/26/2026
Objection raised — Other
03/25/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/25/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
03/24/2026
Filed — New Building
subsequent filing for structural work
B00830930-B4
03/24/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/24/2026
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
03/23/2026
Filed — New Building
subsequent filing for structural work
B00830930-B2
Latest 60 of 190 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offExpress Builders JB06/03/2026
DOB NOWStandpipeSigned-offBest Mechanical Services02/04/2026
DOB NOWPlumbingSigned-offBest Mechanical Services01/28/2026
DOB NOWStandpipeSigned-offBest Mechanical Services01/27/2026
DOB NOWSprinklersSigned-offRightway Plumbing and Heating01/27/2026
DOB NOWGeneral ConstructionPermit IssuedExpress Builders JB01/14/2026
DOB NOWConstruction FenceSigned-offExpress Builders JB11/17/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedExpress Builders JB08/04/2025
DOB NOWProtection and Mechanical MethodsSigned-offPrecision Hoist & Scaffo*06/30/2025
DOB NOWMechanical SystemsSigned-offExpress Builders JB06/26/2025
DOB NOWSidewalk ShedSigned-offPrecision Hoist & Scaffo*06/16/2025
DOB NOWSupported ScaffoldSigned-offPrecision Hoist & Scaffo*06/16/2025
DOB NOWStructuralSigned-offExpress Builders JB06/06/2025
DOB NOWFoundationSigned-offExpress Builders JB06/06/2025
DOB NOWStandpipeSigned-offBest Mechanical Services02/03/2025
DOB NOWStandpipeSigned-offBest Mechanical Services02/03/2025
DOB NOWSprinklersSigned-offRightway Plumbing and Heating01/29/2025
DOB NOWPlumbingSigned-offBest Mechanical Services01/27/2025
DOB NOWGeneral ConstructionPermit IssuedExpress Builders JB01/23/2025
DOB NOWGeneral ConstructionPermit IssuedExpress Builders JB01/14/2025
DOB NOWGeneral ConstructionPermit IssuedExpress Builders JB12/11/2024
DOB NOWGeneral ConstructionPermit IssuedExpress Builders JB12/09/2024
DOB NOWFoundationSigned-offExpress Builders JB11/26/2024
DOB NOWStructuralSigned-offExpress Builders JB11/25/2024
DOB NOWConstruction FenceSigned-offExpress Builders JB11/21/2024
DOB NOWSidewalk ShedSigned-offPlatinum Services NY08/21/2024
DOB NOWFull DemolitionSigned-offStar Companiess08/15/2024
DOB NOWSprinklersSigned-offTristate Fire Sprinkler08/15/2024
DOB NOWProtection and Mechanical MethodsSigned-offStar Companiess08/14/2024
DOB NOWConstruction FenceSigned-offStar Companiess08/08/2024
DOB NOWSprinklersSigned-offTristate Fire Sprinkler07/27/2023
BISEQISSUEDSoa Service08/08/2016
BIS—ISSUEDGoing Sign & Servicing Co09/13/2005
BIS—ISSUEDNew York Sign City09/16/2004
BISOTISSUEDA-Frame Management05/24/2001
BISSPISSUEDReem Plumbing & Heating09/01/1999
BIS—ISSUEDNorth Shore Neon Sign Co11/20/1997
BISPLISSUEDReem Plumbing & Heating11/20/1997
BIS—ISSUEDNorth Shore Neon Sign Co11/20/1997
BISOTISSUEDNorth Shore Neon Sign Co11/20/1997
+ 4 more permits on file
1 project · most recent 09/23/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/23/2026Permit IssuedExpress Builders JBAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric PUMY-P36NKMU3(-BS) 36,000 BTU · Vrf Outdoor ×2
PHUY-P36NKMU3(-BS) 36,000 BTU · Vrf Outdoor ×1
PUHY-EP72TNU-A(-BS) 6 tons · Vrf Outdoor ×1
PUMY-P48NKMU3(-BS) 48,000 BTU · Vrf Outdoor ×1
MXZ-SM36NAM2-U1 3 tons · Heat Pump Outdoor ×2
PUZ-A12NKA7 14,000 BTU · Condensing Unit ×2
PUZ-A18NKA7 19,000 BTU · Condensing Unit ×2
MXZ-SM36NAM2 3 tons · Heat Pump Outdoor ×1
MXZ-SM48NAM2 4 tons · Heat Pump Outdoor ×1
MXZ-SM48NAM2-U1 4 tons · Condensing Unit ×1
PUHY-EP72TNU-A1 6 tons · Vrf Outdoor ×1
Lg ARUN048GSS4 48,000 BTU · Vrf Outdoor ×1
ARUNO48GSS4 48,000 BTU · Vrf Outdoor ×1
Heating
Amana HEH153J50 410 CFM ×365
HEH073J25 370 CFM ×351
Mitsubishi Electric PHUY-EP72TNU-A(-BS) 80,000 BTU · Vrf Outdoor ×1
PHUY-P36NKMU3(-BS) 42,000 BTU · Vrf Outdoor ×1
PUMY-P36NKMU3(-BS) 42,000 BTU · Vrf Outdoor ×1
PUMY-P48NKMU3(-BS) 54,000 BTU · Vrf Outdoor ×1
pumy-p48nkmu3(-bs) 36,000 BTU · Vrf Outdoor ×1
Lg ARUN048GSS4 54,000 BTU · Vrf Outdoor ×1
ARUNO48GSS4 54,000 BTU · Vrf Outdoor ×1
Islandaire EZ4207L9B1N46AB 340 CFM · Heat Pump Outdoor ×347
EZ4215L341N46AB 360 CFM · Ptac ×213
EZLA16L341Z46AB 375 CFM · Ptac ×145
EZ4212l2321N46AB 340 CFM · Ptac ×33
Stelpro ASHU0281TCHAR 2 kW · Electric Heater ×2
ASHU0381C24CHAR 10,238 BTU · Electric Heater ×2
Ventilation
Lg u-ERV-coil-180 0 1,110 CFM · Erv ×1
u-erv-coil-1800 1,370 CFM · Erv ×1
Renewaire HE2XRT 1,100 CFM · Erv ×2
1 project · most recent 09/23/2026
Sprinkler System
FiledStatusContractorScope
09/23/2026Signed-offRightway Plumbing and HeatingSprinkler System
1 project · most recent 09/23/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/23/2026Signed-offBest Mechanical ServicesGas, Storm, Water/Sanitary
10 projects · most recent 06/24/2026
General Wiring
FiledStatusContractorScope
06/24/2026Permit IssuedPower Direct Electric373 meters, 373 new_meters
05/19/2026CompleteDenali Electric—
09/04/2025CompleteDenali Electric—
08/13/2025CompletePower Direct ElectricGeneral Wiring
08/13/2025CompletePower Direct ElectricGeneral Wiring
06/17/2025CompleteNash Electric Services—
06/17/2025CompleteNash Electric Services—
03/25/2025Permit IssuedPower Direct Electric1 meters, 1 new_meters
09/26/2024Permit IssuedM.R. Electrical Service1 meters, 1 new_meters
08/08/2024CompleteIlluminous Electric—
1 project · most recent 09/23/2026
Concrete
FiledStatusContractorScope
09/23/2026Signed-offBest Mechanical ServicesConcrete
3 projects · most recent 08/12/2025
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
08/12/2025Signed-offPrecision Hoist & Scaffo*Scaffold
08/12/2025Signed-offPrecision Hoist & Scaffo*Sidewalk Shed
07/13/2023Signed-offExpress Builders JBFence
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
07/01/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
05/18/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/27/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/25/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/25/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
03/24/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/24/2026Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
03/23/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/20/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
12/12/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/06/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
06/13/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/13/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/30/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/22/2026Lighting controlsSOORJBALLY HARILALLenergy_progress
09/22/2026Lowest Floor ElevationSOORJBALLY HARILALLprogress
09/22/2026PreliminarySOORJBALLY HARILALLprogress
09/22/2026Electrical motors and elevatorsSOORJBALLY HARILALLenergy_progress
09/22/2026Exterior lighting powerSOORJBALLY HARILALLenergy_progress
09/22/2026Air barrier — testing SOORJBALLY HARILALLenergy_progress
09/22/2026Fenestration areasSOORJBALLY HARILALLenergy_progress
09/22/2026Fire-Resistance Rated ConstructionSOORJBALLY HARILALLprogress
09/22/2026Energy Code Compliance InspectionsSOORJBALLY HARILALLprogress
09/22/2026MasonrySOORJBALLY HARILALLspecial
09/22/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)SOORJBALLY HARILALLspecial
09/22/2026Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
09/22/2026Exterior Insulation and Finish Systems (EIFS)SOORJBALLY HARILALLspecial
09/22/2026Lighting in dwelling unitsSOORJBALLY HARILALLenergy_progress
09/22/2026Ventilation and air distribution systemSOORJBALLY HARILALLenergy_progress
09/22/2026Air barrier - visual inspectionSOORJBALLY HARILALLenergy_progress
09/22/2026VestibulesSOORJBALLY HARILALLenergy_progress
09/22/2026Protection of exposed foundation insulationSOORJBALLY HARILALLenergy_progress
09/22/2026Fenestration air leakageSOORJBALLY HARILALLenergy_progress
09/22/2026MeteringSOORJBALLY HARILALLenergy_progress
09/22/2026Interior lighting powerSOORJBALLY HARILALLenergy_progress
09/22/2026Insulation placement and R valuesSOORJBALLY HARILALLenergy_progress
09/22/2026Maintenance informationSOORJBALLY HARILALLenergy_progress
09/22/2026Fenestration and door U-factor and product ratingsSOORJBALLY HARILALLenergy_progress
08/19/2026Chimneys and ventsSOORJBALLY HARILALLspecial
Latest 25 of 150.
▾Documents — 265 on file (BIS + DOB NOW)
▸Plans & Drawings35
▸DOB NOWPlans/Sketch35
08/27/2026B00868436-S2Request digital key ↗
08/27/2026B00868436-I1Request digital key ↗
08/27/2026B00868436-S1Request digital key ↗
Showing 3 of 35 on file for this type
▸Applications & Permits32
▸BISPLAN / WORK APPROVAL APPLICATION22
04/29/2025340911758Open ↗
03/10/2025300647272Open ↗
03/10/2025300647263Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDEP Stormwater Construction Permit7
10/05/2026B00830930-B8Open ↗
08/16/2026B00830930-B2Open ↗
08/15/2026B00830930-B7Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION2
08/08/2016340286372Open ↗
05/09/2016340286372Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
06/28/2024340911758Open ↗
▸Zoning, Tax Lot & Property Records19
▸DOB NOWZD1: DOB Zoning Diagram8
10/05/2026B00830930-B8Open ↗
08/16/2026B00830930-B2Open ↗
08/16/2026B00830930-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWZoning Exhibit form (1-5)7
10/05/2026B00830930-B8Open ↗
08/16/2026B00830930-B2Open ↗
08/15/2026B00830930-B7Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp2
10/05/2026B00830930-B8Open ↗
08/13/2026B00830930-I1Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
07/21/2023322113137Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
10/11/2024322113137Open ↗
▸Seals & Professional Certifications101
▸DOB NOWSpecial Inspector Seal & Signature38
10/05/2026B00830930-B8Open ↗
10/05/2026B00830930-B8Open ↗
10/05/2026B00830930-B8Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature34
10/05/2026B00830930-B8Open ↗
08/27/2026B00898306-I1Open ↗
08/23/2026B01164922-I1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
10/05/2026B00830930-B8Open ↗
10/05/2026B00830930-B8Open ↗
09/27/2026B00830930-P3Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
01/25/2017340286372Open ↗
05/14/2010320156102Open ↗
05/10/2010320156102Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/28/2024340911758Open ↗
07/29/2015340286372Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
06/28/2024340911758Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/29/2015340286372Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/29/2015340286372Open ↗
▸Trade Schedules & Equipment11
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/16/2026B00830930-B2Open ↗
08/13/2026B00830930-P8Open ↗
08/13/2026B00830930-P5Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING1
05/10/2010320156102Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026B00868436-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B00868436-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B00868436-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/16/2026B00830930-I1—
▸DOB NOWSewer Cut-Off1
08/13/2026B00868436-I1Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist7
10/05/2026B00830930-B8Open ↗
08/16/2026B00830930-B2Open ↗
08/16/2026B00830930-P8Open ↗
Showing 3 of 7 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
04/23/2025340911758Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026B00898306-I1Open ↗
08/13/2026B00868436-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/10/2010320156102Open ↗
▸DOB NOWRodent Control1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/25/2017340286372Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/25/2017340286372Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/29/2015340286372Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026B00830930-S1Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION4
10/11/2024322113137Open ↗
10/11/2024322113137Open ↗
08/06/2024340911758Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
05/10/2010320156102Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/25/2017340286372Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
01/25/2017340286372Open ↗
05/10/2010320156102Open ↗
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
08/08/2016340286372Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION3
05/02/2025340911758Open ↗
10/11/2024322113137Open ↗
08/06/2024340911758Open ↗
▸BISEFILING COVER SHEET2
05/24/2023322113137Open ↗
05/10/2010320156102Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
06/28/2024340911758Open ↗
07/29/2015340286372Open ↗
▸Other Documents34
▸DOB NOWProperty Ownership Certification8
10/05/2026B00830930-B8Open ↗
08/16/2026B00830930-B2Open ↗
08/16/2026B00830930-P8Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSite Survey: Initial7
10/05/2026B00830930-B8Open ↗
08/16/2026B00830930-B2Open ↗
08/15/2026B00830930-B7Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
10/05/2026B00830930-B8Open ↗
08/16/2026B00830930-B2Open ↗
08/15/2026B00830930-B7Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWFlood Plan Emergency Temporary Flood Shields6
08/16/2026B00830930-B2Open ↗
08/16/2026B00830930-P5Open ↗
08/16/2026B00830930-P8Open ↗
Showing 3 of 6 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
04/23/2025340911758Open ↗
04/23/2025340911758Open ↗
▸BISPLOT DIAGRAM1
07/21/2023322113137Open ↗
▸DOB NOWFinal Survey1
08/16/2026B00830930-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B00868436-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B00868436-I1Open ↗