← Back
Walk-up apt, over six families with stores
4980 BROADWAY
MANHATTAN · Inwood · BIN 1064869
💬 Discuss this project
1926Year Built
5Stories
C7Building Class
R7AZoning
45,000 sfGross Floor Area
47Units
LL97 CoveredRent Stabilized51 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: ADD SAMAROO REALTY · 9,425 sf lot · 4.77 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITED KING CONSTRUCTION303/22/2026
ADD SAMAROO REALTY LL1303/22/2026
PETER AND B CONSTRUCTION103/22/2026
OWNER OF 4980 BROADWAY203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ENTHINK ENGINEERS LLC107/06/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UNITED KING CONSTRUCTIONGeneral Contractor303/21/2026
SATELLITE EAST PLBG. INCPlumbing203/22/2026
JIMENEZ LUISElectrical103/21/2026
LUIS JIMENEZElectrical103/21/2026
SHAUKAT ALIGeneral Contractor103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENTHINK ENGINEERS LLC6247107/06/2022
Building Lifecycle
All (67)Filed (1)Permit Issued (1)Violation (60)Inspection (1)Special Inspection (4)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/01/2024
Violation issued (HPD, closed)
A
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/15/2023
Violation issued (HPD, closed)
A
07/29/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/13/2022
Permit issued — General Construction
M00768530-I1-GC
07/06/2022
Filed — Alteration
BRICK CRACK REPAIR AS PER PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M00768530-I1
07/01/2022
Special inspection requirement — Masonry
Sunil Saigal
07/01/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Sunil Saigal
07/01/2022
Special inspection requirement — Final
Sunil Saigal
07/01/2022
Special inspection requirement — Energy Code Compliance Inspections
Sunil Saigal
02/15/2022
Violation issued (HPD, closed)
A
12/12/2021
Violation issued (HPD, closed)
C
10/21/2021
Violation issued (HPD, closed)
C
10/21/2021
Violation issued (HPD, closed)
B
10/21/2021
Violation issued (HPD, closed)
B
11/30/2020
Violation issued (HPD, closed)
B
11/30/2020
Violation issued (HPD, closed)
A
11/30/2020
Violation issued (HPD, closed)
C
11/30/2020
Violation issued (HPD, closed)
C
11/30/2020
Violation issued (HPD, closed)
C
11/30/2020
Violation issued (HPD, closed)
B
11/30/2020
Violation issued (HPD, open)
C
11/30/2020
Violation issued (HPD, closed)
C
11/30/2020
Violation issued (HPD, closed)
B
11/30/2020
Violation issued (HPD, open)
C
03/07/2020
Violation issued (HPD, closed)
B
03/07/2020
Violation issued (HPD, closed)
B
03/07/2020
Violation issued (HPD, closed)
B
03/07/2020
Violation issued (HPD, closed)
B
03/04/2020
Violation issued (HPD, closed)
C
03/04/2020
Violation issued (HPD, open)
C
06/01/2018
Violation issued (HPD, closed)
B
05/09/2018
Violation issued (HPD, closed)
B
05/09/2018
Violation issued (HPD, closed)
B
05/09/2018
Violation issued (HPD, closed)
B
05/09/2018
Violation issued (HPD, closed)
B
05/09/2018
Violation issued (HPD, closed)
B
05/09/2018
Violation issued (HPD, closed)
B
05/09/2018
Violation issued (HPD, closed)
B
05/09/2018
Violation issued (HPD, closed)
B
05/09/2018
Violation issued (HPD, closed)
B
05/07/2018
Violation issued (HPD, closed)
A
05/07/2018
Violation issued (HPD, closed)
B
05/07/2018
Violation issued (HPD, closed)
B
05/07/2018
Violation issued (HPD, closed)
B
05/07/2018
Violation issued (HPD, closed)
A
05/07/2018
Violation issued (HPD, closed)
A
05/07/2018
Violation issued (HPD, closed)
C
05/07/2018
Violation issued (HPD, closed)
A
05/07/2018
Violation issued (HPD, closed)
A
05/07/2018
Violation issued (HPD, closed)
B
05/07/2018
Violation issued (HPD, closed)
B
05/07/2018
Violation issued (HPD, closed)
A
05/07/2018
Violation issued (HPD, closed)
B
05/07/2018
Violation issued (HPD, closed)
A
05/07/2018
Violation issued (HPD, closed)
A
05/07/2018
Violation issued (HPD, closed)
B
05/07/2018
Violation issued (HPD, open)
B
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedUNITED KING CONSTRUCTION07/13/2022
BISPLISSUEDG & S PLUMBING & HEATING CORP.04/17/2007
BISOTISSUEDJKN CONSTRUC CORP10/24/2006
BISEQISSUEDJKN CONSTRUC CORP10/24/2006
BISEQISSUEDJKN CONSTRUC CORP10/28/2005
BISMHISSUEDJKN CONSTRUC CORP10/28/2005
BISEQISSUEDFIRST CLASS CAR & LIMOUSINE09/12/2005
BISOTISSUEDFIRST CLASS CAR & LIMOUSINE09/12/2005
BISEQISSUEDPETER AND B CONSTRUCTION INC07/02/2004
BISMHRE-ISSUEDVERTEX RESTORATION CORP04/24/1997
2 projects · most recent 04/12/2023
General Wiring
FiledStatusContractorScope
04/12/2023CompleteAMOR ELECTRIC CORP—
11/24/2019CompleteLEONE ELECTRIC CO. INCGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/29/2022Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
07/01/2022MasonrySunil Saigalspecial
07/01/2022Structural Stability – Alterations of existing buildingsSunil Saigalspecial
07/01/2022FinalSunil Saigalprogress
07/01/2022Energy Code Compliance InspectionsSunil Saigalprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
09/02/2026M00768530-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026M00768530-I1Open ↗
08/31/2026M00768530-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026M00768530-I1Open ↗
08/31/2026M00768530-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026M00768530-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00768530-I1Open ↗