← Back
QUEENS
5-13 47 ROAD
QUEENS · BIN 4620864
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open Violations
Flood zone X500
Locations of Work
StructuralMechanicalPlumbingFire Protection
Roof5p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 3 docs
Floor 33p · 2 filings · 18 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BK DEVELOPERS1407/08/2026
LLC BK BUILDERS503/22/2026
5TH STREET DEVELOPMENT503/21/2026
5TH STREET LIC DEVELOPMENT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VERSATILE ENGINEERING, P.C.306/16/2022
A&D ENGINEERING, PLLC306/30/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADAM BERGMAN CONSTRUCTION AND DEVEL1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BK BUILDERS LLCGeneral Contractor907/08/2026
FOREST BROOK ELEC'L CONTRElectrical103/22/2026
ROM PIPING & HEATING INCFire Protection107/08/2026
ROM PIPING & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803606/16/2022
Building Lifecycle
All (57)Filed (6)Permit Issued (7)Signed Off (5)Violation (5)Inspection (7)Objection (8)Special Inspection (19)
03/28/2024
Signed off — Alteration
PROVIDE NEW MECHANICAL SYSTEM {HEATING SYSTEM, VENTILATION SYSTEM,AIR-CONDITIONING SYSTEMS, ASSOCIATED DUCTS & PIPING) FOR ENTIRE BUILDING IN ACCORDANCE WITH 2014 NYC BUILDING CODE, 2014 MECHANICAL CODE, 2014 PLUMBING CODE, 2014 NYC FUEL GAS CODE
Q00548265-I1
03/12/2024
Signed off — Alteration
PROV1DE NEW PLUMBING SYSTEM (DOMESTIC WATER SYSTEM, STORM WATER SYSTEM, SANITARY WATER SYSTEM) FOR ENTIRE BUILDING IN ACCORDANCE WITH 2014 NYC BUILDING CODE, 2014 PLUMBING CODE AND 2020 NYC ENERGY CONSERVATION CODE. FOR PLUMBING WORK ONLY
Q00539898-I1
11/17/2023
Signed off — Alteration
FILING FOR FOUNDATION WORK IN CONJUCTION WITH NB 44066210
Q00581425-S1
11/17/2023
Signed off — Alteration
FILING FOR FOUNDATION WORK IN CONJUCTION WITH NB 44066210
Q00581425-I1
10/30/2023
Signed off — Alteration
1. PROVIDE NEW SPRINKUER SYSTEM FOR ENTIRE BUILDING IN ACCORDANCE WlTH NYC BC & N.F.P.A. #13R-2007. 2. STANDPIPE SYSTEM IS NOT REQUIRED AS PER NFIPA #14-2007
Q00548345-I1
08/16/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/16/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/11/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/08/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/09/2023
Violation issued (ECB, closed)
Construction
02/15/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/29/2022
Violation issued (ECB, closed)
Construction
09/20/2022
Permit issued — Structural
Q00581425-I1-ST
09/20/2022
Permit issued — Mechanical Systems
Q00548265-I1-MS
08/19/2022
Violation issued (ECB, closed)
Construction
08/19/2022
Violation issued (ECB, closed)
Construction
08/19/2022
Violation issued (ECB, closed)
Construction
07/01/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/19/2022
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
06/19/2022
Special inspection requirement — Masonry
SAMI HAJJAR P.E
06/19/2022
Special inspection requirement — Final
SAMI HAJJAR P.E
06/16/2022
Filed — Alteration
FILING FOR FOUNDATION WORK IN CONJUCTION WITH NB 44066210
Q00581425-P1
06/15/2022
Special inspection requirement — Final
SAMI HAJJAR P.E
06/15/2022
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
06/15/2022
Special inspection requirement — Masonry
SAMI HAJJAR P.E
04/26/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/01/2022
Permit issued — Plumbing
Q00539898-I1-PL
03/09/2022
Permit issued — Sprinklers
Q00548345-I1-EW-SP
11/17/2021
Permit issued — Foundation
Q00581425-S1-FO
11/15/2021
Permit issued — Structural
Q00581425-I1-ST
11/15/2021
Permit issued — Mechanical Systems
Q00548265-I1-MS
09/16/2021
Special inspection requirement — Subgrade Inspections
SAMI HAJJAR P.E
09/13/2021
Objection raised — Scope
09/13/2021
Objection resolved — Addressed
09/13/2021
Objection raised — Inspections
09/13/2021
Objection resolved — Addressed
09/08/2021
Filed — Alteration
FILING FOR FOUNDATION WORK IN CONJUCTION WITH NB 44066210
Q00581425-S1
09/02/2021
Filed — Alteration
FILING FOR FOUNDATION WORK IN CONJUCTION WITH NB 44066210
Q00581425-I1
09/02/2021
Special inspection requirement — Footing and Foundation
SAMI HAJJAR P.E
09/02/2021
Special inspection requirement — Final
SAMI HAJJAR P.E
07/15/2021
Objection raised — Zoning
07/15/2021
Objection resolved — Addressed
07/15/2021
Objection raised — Other
07/15/2021
Objection resolved — Addressed
06/30/2021
Filed — Alteration
PROVIDE NEW MECHANICAL SYSTEM {HEATING SYSTEM, VENTILATION SYSTEM,AIR-CONDITIONING SYSTEMS, ASSOCIATED DUCTS & PIPING) FOR ENTIRE BUILDING IN ACCORDANCE WITH 2014 NYC BUILDING CODE, 2014 MECHANICAL CODE, 2014 PLUMBING CODE, 2014 NYC FUEL GAS CODE
Q00548265-I1
06/30/2021
Filed — Alteration
PROV1DE NEW PLUMBING SYSTEM (DOMESTIC WATER SYSTEM, STORM WATER SYSTEM, SANITARY WATER SYSTEM) FOR ENTIRE BUILDING IN ACCORDANCE WITH 2014 NYC BUILDING CODE, 2014 PLUMBING CODE AND 2020 NYC ENERGY CONSERVATION CODE. FOR PLUMBING WORK ONLY
Q00539898-I1
06/30/2021
Filed — Alteration
1. PROVIDE NEW SPRINKUER SYSTEM FOR ENTIRE BUILDING IN ACCORDANCE WlTH NYC BC & N.F.P.A. #13R-2007. 2. STANDPIPE SYSTEM IS NOT REQUIRED AS PER NFIPA #14-2007
Q00548345-I1
06/30/2021
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
06/30/2021
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
06/30/2021
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
06/30/2021
Special inspection requirement — Shutoff dampers
SAMI HAJJAR P.E
06/30/2021
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
06/30/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
06/28/2021
Special inspection requirement — Final
SAMI HAJJAR P.E
06/28/2021
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
06/28/2021
Special inspection requirement — Sprinkler Systems
SAMI HAJJAR P.E
06/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offBK BUILDERS09/20/2022
DOB NOWMechanical SystemsSigned-offBK BUILDERS09/20/2022
DOB NOWPlumbingSigned-offROM PIPING & HTG INC04/01/2022
DOB NOWSprinklersSigned-offROM PIPING & HEATING INC03/09/2022
DOB NOWFoundationSigned-offBK BUILDERS11/17/2021
DOB NOWStructuralSigned-offBK BUILDERS11/15/2021
DOB NOWMechanical SystemsSigned-offBK BUILDERS11/15/2021
BIS—ISSUEDBK BUILDERS LLC10/10/2023
BIS—ISSUEDBK BUILDERS LLC09/20/2022
BIS—ISSUEDBK BUILDERS LLC06/15/2022
BIS—ISSUEDBK BUILDERS LLC04/13/2022
1 project · most recent 10/29/2023
General Wiring
FiledStatusContractorScope
10/29/2023CompleteFOREST BROOK ELEC'L CONTRGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/16/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/11/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/08/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/15/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/01/2022Pass-Final PL - UndergroundPassView ↗
04/26/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
06/19/2022Structural Steel - DetailsSAMI HAJJAR P.Especial
06/19/2022MasonrySAMI HAJJAR P.Especial
06/19/2022FinalSAMI HAJJAR P.Eprogress
06/15/2022FinalSAMI HAJJAR P.Eprogress
06/15/2022Structural Steel - DetailsSAMI HAJJAR P.Especial
06/15/2022MasonrySAMI HAJJAR P.Especial
09/16/2021Subgrade InspectionsSAMI HAJJAR P.Especial
09/02/2021Footing and FoundationSAMI HAJJAR P.Eprogress
09/02/2021FinalSAMI HAJJAR P.Eprogress
06/30/2021HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
06/30/2021Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
06/30/2021Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
06/30/2021Shutoff dampersSAMI HAJJAR P.Eenergy_progress
06/30/2021HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
06/30/2021HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
06/28/2021FinalSAMI HAJJAR P.Eprogress
06/28/2021Mechanical SystemsSAMI HAJJAR P.Especial
06/28/2021Sprinkler SystemsSAMI HAJJAR P.Especial
06/15/2021Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
▾Documents — 152 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026Q00539898-I1Request digital key ↗
08/27/2026Q00548345-I1Request digital key ↗
08/27/2026Q00581425-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION16
03/14/2025421838970Open ↗
05/17/2024440662105Open ↗
05/16/2024440662105Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION2
12/06/2023440662105Open ↗
04/13/2022440662105Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/27/2023440662105Open ↗
▸BISSD1 AND SD2 TO BE SUBMITTED AT PERMIT TIME.1
03/28/2022440662105Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
10/05/2023421838970Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
10/31/2023440662105Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/05/2023421838970Open ↗
▸BISAMEND PW1 TO DOCUMENT PERTINENT ZONING EXHIBITS (AC 28-118.6)1
11/17/2023440662105Open ↗
▸BISFLOOD ZONE COMPLIANCE1
11/28/2023440662105Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/31/2023440662105Open ↗
▸BISZONING DIAGRAM1
09/29/2021440662105Open ↗
▸Seals & Professional Certifications23
▸DOB NOWSpecial Inspector Seal & Signature8
09/05/2026Q00539898-I1Open ↗
09/02/2026Q00548265-I1Open ↗
08/26/2026Q00581425-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026Q00548345-I1Open ↗
08/27/2026Q00581425-S1Open ↗
08/27/2026Q00581425-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026Q00548265-I1Open ↗
09/02/2026Q00548265-I1Open ↗
08/26/2026Q00581425-I1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
06/15/2023440787891Open ↗
08/24/2021440686241Open ↗
01/15/2021440662105Open ↗
▸Trade Schedules & Equipment6
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
11/28/2023440662105Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
10/31/2023440662105Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
11/28/2023440662105Open ↗
▸BISSPRINKLER SYSTEMS1
11/28/2023440662105Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
05/28/2024440662105Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
05/28/2024440662105Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST4
11/08/2023440787891Open ↗
08/24/2021440686241Open ↗
01/15/2021440662105Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE SIGNOFF2
03/26/2024440787891Open ↗
11/16/2023440662105Open ↗
▸BISSTREET TREES SITE PLAN1
10/31/2023440662105Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
03/21/2022440662105Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/21/2022440662105Open ↗
01/15/2021440662105Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
11/28/2023440662105Open ↗
▸BISINTERIOR LIGHTING POWER1
11/28/2023440662105Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
11/28/2023440662105Open ↗
▸BISFENESTRATION AREAS1
11/28/2023440662105Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
11/28/2023440662105Open ↗
▸BISLIGHTING IN DWELLING UNITS1
11/28/2023440662105Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/28/2023440662105Open ↗
▸BISELECTRIC MOTORS1
11/28/2023440662105Open ↗
▸BISLIGHTING CONTROLS1
11/28/2023440662105Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00548265-I1Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY6
08/10/2023440787891Open ↗
03/21/2022440662105Open ↗
09/10/2021440662105Open ↗
Showing 3 of 6 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
10/31/2023440662105Open ↗
03/21/2022440662105Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
11/28/2023440662105Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
11/17/2023440662105Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/28/2023440662105Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
11/28/2023440662105Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
11/28/2023440662105Open ↗
▸BISMASONRY1
11/28/2023440662105Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
11/28/2023440662105Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
11/28/2023440662105Open ↗
▸BISSOIL REPORT1
09/10/2021440662105Open ↗
▸BISSOIL PERC. TEST-PVT ON-SITE STORM WATER DRAINAGE DISPOSAL SYS & DET. FACL.1
11/28/2023440662105Open ↗
▸Approvals, Objections & Sign-offs9
▸BISSCHEDULE A - OCCUPANCY / USE6
11/17/2023440662105Open ↗
11/13/2023440662105Open ↗
11/02/2023440662105Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
11/08/2023440787891Open ↗
11/08/2023440787891Open ↗
09/10/2021440662105Open ↗
▸Cost, Insurance & Ownership3
▸BISPROJECT-SPECIFIC GL INSURANCE2
12/06/2023440662105Open ↗
03/21/2022440662105Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
10/05/2023421838970Open ↗
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION10
10/20/2023440662105Open ↗
10/19/2023440662105Open ↗
10/05/2023421838970Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
11/08/2023440787891Open ↗
08/24/2021440686241Open ↗
01/15/2021440662105Open ↗
▸BISEFILING COVER SHEET3
03/14/2025421838970Open ↗
02/07/2024440662105Open ↗
01/03/2024440662105Open ↗
▸Other Documents9
▸BISSMOKE CONTROL SYSTEMS1
11/28/2023440662105Open ↗
▸BISSHUTOFF DAMPERS1
11/28/2023440662105Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
03/29/2021440662105Open ↗
▸BISLOWEST FLOOR ELEVATION1
11/28/2023440662105Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
11/28/2023440662105Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
11/28/2023440662105Open ↗
▸BISMAINTENANCE INFORMATION1
11/28/2023440662105Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
11/28/2023440662105Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
11/28/2023440662105Open ↗