← Back
QUEENS
5-15 47 ROAD
QUEENS · BIN 4620865
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open Violations
Flood zone X500
Locations of Work
StructuralMechanicalFire Protection
Roof1p · 2 filings · 18 docs
Bulkhead1p · 1 filing · 8 docs
Floor 31p · 1 filing · 4 docs
Floor 21p · 1 filing · 8 docs
Floor 11p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BK DEVELOPERS1507/08/2026
BK BUILDERS503/22/2026
5TH STREET LIC DEVELOPMENT303/22/2026
5TH STREET DEVELOPMENT503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A&D ENGINEERING, PLLC407/30/2024
VERSATILE ENGINEERING, P.C.202/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADAM BERGMAN CONSTRUCTION AND DEVEL1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BK BUILDERS LLCGeneral Contractor607/08/2026
ROM PIPING & HTG INCPlumbing207/08/2026
ROM PIPING & HEATING INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803407/30/2024
Building Lifecycle
All (82)Filed (6)Permit Issued (8)Signed Off (5)Violation (6)Inspection (6)Objection (34)Special Inspection (17)
09/06/2024
Signed off — Alteration
PROVIDE NEW SPRINKLER SYSTEM FOR ENTIRE BUILDING IN ACCORDANCE With NYC BC & N.F.P.A. #13R-2007.2.STANDPIPE SYSTEM IS NOT REQUIRED AS PER NFIPA #14-2007
Q00552064-I1
09/04/2024
Special inspection requirement — Sprinkler Systems
SAMI HAJJAR P.E
09/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
09/04/2024
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
09/01/2024
Objection resolved — Addressed
08/27/2024
Objection raised — Scope
08/15/2024
Objection resolved — Addressed
08/14/2024
Objection raised — Inspections
08/13/2024
Violation issued (ECB, closed)
Construction
07/30/2024
Filed — Alteration
PROVIDE NEW SPRINKLER SYSTEM FOR ENTIRE BUILDING IN ACCORDANCE With NYC BC & N.F.P.A. #13R-2007.2.STANDPIPE SYSTEM IS NOT REQUIRED AS PER NFIPA #14-2007
Q00552064-P1
07/29/2024
Special inspection requirement — Sprinkler Systems
SAMI HAJJAR P.E
07/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
07/29/2024
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
04/15/2024
Signed off — Alteration
FILE EARTH WORK SUBSIQUENT TO THE APPROVED SOE APPLICATION Q00556013-I1
Q00556013-S1
03/28/2024
Signed off — Alteration
1. PROVIDE NEW MECHANICAL SYSTEM (HEATING SYSTEM, VENTILATIONENTIRE BUILDING SYSTEM.AIR-CONDITIONING IN ACCORDANCE SYSTEMS, WITH ASSOCIATED 2014 NYC DUCTS BUILDING AND CODE, PIPING) FORO 2014 MECHANICAL CODE, 2014 PWMBING ONSERVATION CODE, CODE. 2014 NYC
Q00552069-I1
11/16/2023
Signed off — Alteration
FILING FOR STURCTURE WORKIN CONJUCTION WITH NB JOB#440662114
Q00581316-I1
10/31/2023
Signed off — Alteration
1.PRO'v1DE NEW PLUMBING SYSTEM (DOMESTIC WATER SYSTEM, STORM WATER SYSTEM, SANITARY WATER SYSTEM) FOR ENTIRE BUILDING IN ACCORDANCE WITH 2014 NYC BUILDING CODE, 2014 PLUMBING CODE AND 2014 NYC ENERGY CONSERVATION CODE.2.FOR PWMBING WORK ONLY
Q00552061-I1
08/16/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/16/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/11/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/08/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/11/2023
Permit issued — Plumbing
Q00552061-I1-PL
02/15/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/29/2022
Violation issued (ECB, closed)
Construction
09/20/2022
Permit issued — Structural
Q00581316-I1-ST
09/20/2022
Permit issued — Mechanical Systems
Q00552069-I1-MS
08/19/2022
Violation issued (ECB, closed)
Construction
03/21/2022
Violation issued (ECB, closed)
Construction
03/18/2022
Permit issued — Earth Work
Q00556013-S1-EA
03/09/2022
Permit issued — Sprinklers
Q00552064-I1-EW-SP
03/03/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
02/25/2022
Permit issued — Plumbing
Q00552061-I1-PL
02/19/2022
Objection raised — Structural
02/19/2022
Objection resolved — Addressed
02/19/2022
Objection raised — Other
02/19/2022
Objection resolved — Addressed
02/19/2022
Objection raised — Admin
02/19/2022
Objection resolved — Addressed
02/19/2022
Objection raised — Other
02/19/2022
Objection resolved — Addressed
02/19/2022
Objection raised — Other
02/19/2022
Objection resolved — Addressed
02/19/2022
Objection raised — Structural
02/19/2022
Objection resolved — Addressed
02/19/2022
Objection raised — Structural
02/19/2022
Objection resolved — Addressed
02/19/2022
Objection raised — Structural
02/19/2022
Objection resolved — Addressed
02/19/2022
Objection raised — Structural
02/19/2022
Objection resolved — Addressed
02/14/2022
Filed — Alteration
FILE EARTH WORK SUBSIQUENT TO THE APPROVED SOE APPLICATION Q00556013-I1
Q00556013-S1
02/04/2022
Violation issued (ECB, closed)
Construction
02/04/2022
Violation issued (ECB, closed)
Construction
02/04/2022
Special inspection requirement — Final
SAMI HAJJAR P.E
11/15/2021
Permit issued — Structural
Q00581316-I1-ST
11/15/2021
Permit issued — Mechanical Systems
Q00552069-I1-MS
09/05/2021
Objection raised — Admin
09/05/2021
Objection resolved — Addressed
09/05/2021
Objection raised — Fire_Protection
09/05/2021
Objection resolved — Addressed
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offROM PIPING & HTG INC04/11/2023
DOB NOWStructuralSigned-offBK BUILDERS09/20/2022
DOB NOWMechanical SystemsSigned-offBK BUILDERS09/20/2022
DOB NOWEarth WorkSigned-offBK BUILDERS03/18/2022
DOB NOWSprinklersSigned-offROM PIPING & HEATING INC03/09/2022
DOB NOWPlumbingSigned-offROM PIPING & HTG INC02/25/2022
DOB NOWStructuralSigned-offBK BUILDERS11/15/2021
DOB NOWMechanical SystemsSigned-offBK BUILDERS11/15/2021
BIS—ISSUEDBK BUILDERS LLC10/10/2023
BIS—ISSUEDBK BUILDERS LLC09/20/2022
BIS—ISSUEDBK BUILDERS LLC06/15/2022
BIS—ISSUEDBK BUILDERS LLC04/13/2022
1 project · most recent 10/29/2023
General Wiring
FiledStatusContractorScope
10/29/2023CompleteFOREST BROOK ELEC'L CONTRGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/16/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/11/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/08/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/15/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/03/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
09/04/2024Sprinkler SystemsSAMI HAJJAR P.Especial
09/04/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
09/04/2024Post-installed AnchorsSAMI HAJJAR P.Especial
07/29/2024Sprinkler SystemsSAMI HAJJAR P.Especial
07/29/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
07/29/2024Post-installed AnchorsSAMI HAJJAR P.Especial
02/04/2022FinalSAMI HAJJAR P.Eprogress
09/02/2021Structural Steel - DetailsSAMI HAJJAR P.Especial
09/02/2021MasonrySAMI HAJJAR P.Especial
08/23/2021FinalSAMI HAJJAR P.Eprogress
07/07/2021HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
07/07/2021Shutoff dampersSAMI HAJJAR P.Eenergy_progress
07/07/2021HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
07/07/2021HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
07/07/2021Maintenance informationSAMI HAJJAR P.Eenergy_progress
07/04/2021Mechanical SystemsSAMI HAJJAR P.Especial
07/04/2021FinalSAMI HAJJAR P.Eprogress
▾Documents — 140 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026Q00552069-I1Request digital key ↗
08/21/2026Q00552064-I1Request digital key ↗
08/15/2026Q00552064-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION9
03/14/2025421838961Open ↗
04/29/2024440662114Open ↗
02/07/2024421838961Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION2
12/06/2023440662114Open ↗
04/13/2022440662114Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/27/2023440662114Open ↗
▸BISSD1 AND SD2 TO BE PROVIDED AT PERMIT TIME.1
03/28/2022440662114Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
04/03/2024440684993Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
10/05/2023421838961Open ↗
11/05/2021440662114Open ↗
▸BISPD1 FORM WITH BP TOPO UNIT VERIFICATION(ZR 12-10 #ZONING LOT#)1
03/28/2022440662114Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
10/31/2023440662114Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/05/2023421838961Open ↗
▸BISFLOOD ZONE COMPLIANCE1
12/12/2023440662114Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/31/2023440662114Open ↗
▸BISZONING DIAGRAM1
01/20/2022440662114Open ↗
▸BISAMEND PW1 TO RECORD PERTINENT ZONING EXHIBITS (AC 28-118.6 & ZR 12-10 #ZONING LOT#)1
05/02/2024440662114Open ↗
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026Q00552069-I1Open ↗
09/01/2026Q00552069-I1Open ↗
09/01/2026Q00552069-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/17/2026Q00552064-P1Open ↗
09/17/2026Q00552064-P1Open ↗
09/01/2026Q00552069-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026Q00552061-I1Open ↗
08/27/2026Q00552069-I1Open ↗
08/27/2026Q00581316-I1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
08/27/2021440684993Open ↗
01/15/2021440662114Open ↗
▸Trade Schedules & Equipment7
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
12/20/2024440662114Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
12/12/2023440662114Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
11/28/2023440662114Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
12/12/2023440662114Open ↗
▸BISSPRINKLER SYSTEMS1
12/12/2023440662114Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
11/08/2024440662114Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
11/08/2024440662114Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
02/25/2022440684993Open ↗
01/15/2021440662114Open ↗
▸BISSTREET TREES SITE PLAN1
10/31/2023440662114Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
03/21/2022440662114Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/21/2022440662114Open ↗
01/15/2021440662114Open ↗
▸BISEXTERIOR LIGHTING POWER1
12/12/2023440662114Open ↗
▸BISFENESTRATION AIR LEAKAGE1
12/12/2023440662114Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
12/12/2023440662114Open ↗
▸BISINTERIOR LIGHTING POWER1
12/12/2023440662114Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/12/2023440662114Open ↗
▸BISFENESTRATION AREAS1
12/12/2023440662114Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/12/2023440662114Open ↗
▸BISLIGHTING IN DWELLING UNITS1
12/12/2023440662114Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/12/2023440662114Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00552069-I1Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY5
03/21/2022440662114Open ↗
11/05/2021440662114Open ↗
11/05/2021440662114Open ↗
Showing 3 of 5 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
10/31/2023440662114Open ↗
03/21/2022440662114Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
12/12/2023440662114Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
05/17/2024440662114Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/12/2023440662114Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
12/12/2023440662114Open ↗
▸BISMASONRY1
12/12/2023440662114Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
12/12/2023440662114Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
12/12/2023440662114Open ↗
▸Approvals, Objections & Sign-offs3
▸BISFINAL CONSTRUCTION SIGNOFF1
12/31/2024440662114Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/06/2021440662114Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
04/12/2022440662114Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE2
12/06/2023440662114Open ↗
03/21/2022440662114Open ↗
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION11
05/02/2024440662114Open ↗
05/02/2024440662114Open ↗
05/02/2024440662114Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET3
03/14/2025421838961Open ↗
02/07/2024421838961Open ↗
01/03/2024421838961Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
08/27/2021440684993Open ↗
01/15/2021440662114Open ↗
▸Other Documents11
▸BISSMOKE CONTROL SYSTEMS1
12/12/2023440662114Open ↗
▸BISSHUTOFF DAMPERS1
12/12/2023440662114Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
11/05/2021440662114Open ↗
▸BISLOWEST FLOOR ELEVATION1
12/12/2023440662114Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
03/27/2024440684993Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
02/25/2022440684993Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
12/12/2023440662114Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
12/12/2023440662114Open ↗
▸BISMAINTENANCE INFORMATION1
12/12/2023440662114Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
12/12/2023440662114Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00556013-S1Open ↗