Two stories - detached, small or mid-size
5-18 PARSONS BOULEVARD
QUEENS · BIN 4623497
💬 Discuss this project
2022Year Built
2Stories
A1Building Class
R1-2Zoning
2,554 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · 5,000 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
PlumbingFire Protection
Roof1p · 1 filing · 11 docs
Floor 23p · 1 filing · 5 docs
Floor 11p · 1 filing · 11 docs
Cellar2p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHAEL CONSTRUCTION403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/26/2025$2.5M—— → —$979/sf building
10/03/2018$1.1M—PARDIS GROUP LLC → Private party— not available
08/07/2017$925K—Private party → PARDIS GROUP LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
N/A210/21/2024
FRANK J QUATELA ARCHITECT P.C403/21/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FIRE BUILDING CODE SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DAVID CONSTRUCTING NY, INGeneral Contractor303/21/2026
HORBRIDGE PLUMBING & HEATINGPlumbing207/08/2026
DYNAMIC PLBNG & SPRKR CORFire Protection107/08/2026
VILLAGE P & H NY INCFire Protection107/08/2026
C.Q. ELECTR'L CONTRG CORPElectrical103/22/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
M & M PIPING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TRIANGLE INSPECTION & TES7495410/21/2024
BRIAN E. FLYNN, PE, PC2837203/21/2024
Building Lifecycle
All (50)Filed (6)Permit Issued (7)Signed Off (3)Violation (9)Inspection (7)Objection (10)Special Inspection (8)
02/11/2026
Signed off — Alteration
INSTALLATION OF SPRINKLER SYSTEM THROUGHOUT BUILDING FILED IN CONJUNCTION WITH NB APPLICATION # 421945097
Q00405399-I1
01/13/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
11/17/2025
Signed off — Alteration
HEREWITH FILING PLUMBING WORK IN CONJUNCTION WITH NB 421945097
Q00334614-I1
10/25/2024
Special inspection requirement — Sprinkler Systems
Rajasekhar Sakhamuri
10/21/2024
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM THROUGHOUT BUILDING FILED IN CONJUNCTION WITH NB APPLICATION # 421945097
Q00405399-P1
10/01/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
09/19/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/16/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/03/2024
Permit issued — Plumbing
Q00334614-I1-PL
06/14/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/18/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/18/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/09/2024
Permit issued — Plumbing
Q00334614-I1-PL
04/02/2024
Objection resolved — Addressed
04/01/2024
Objection raised — Other
03/21/2024
Filed — Alteration
HEREWITH FILING PLUMBING WORK IN CONJUNCTION WITH NB 421945097
Q00334614-P1
03/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
03/21/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Rajasekhar Sakhamuri
03/21/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
BRIAN FLYNN
03/21/2024
Special inspection requirement — HVAC insulation and sealing
Rajasekhar Sakhamuri
03/21/2024
Special inspection requirement — HVAC and service water heating system controls
Rajasekhar Sakhamuri
03/21/2024
Special inspection requirement — Maintenance information
Rajasekhar Sakhamuri
03/21/2024
Special inspection requirement — HVAC and service water heating equipment
Rajasekhar Sakhamuri
03/15/2024
Signed off — Alteration
ERECT CONSTRUCTION FENCE TO SAFE GUARD PROPERTY IN CONJUNCTION WITH NB #421945097
Q00215726-I1
10/05/2023
Permit issued — Sprinklers
Q00405399-I1-EW-SP
05/12/2023
Permit issued — Plumbing
Q00334614-I1-PL
01/06/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/07/2022
Permit issued — Sprinklers
Q00405399-I1-EW-SP
08/30/2022
Permit issued — Plumbing
Q00334614-I1-PL
05/10/2022
Permit issued — Construction Fence
Q00215726-I1-FN
02/24/2022
Violation issued (ECB, closed)
Construction
01/24/2022
Violation issued (ECB, closed)
Construction
07/23/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/29/2020
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM THROUGHOUT BUILDING FILED IN CONJUNCTION WITH NB APPLICATION # 421945097
Q00405399-I1
06/23/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/26/2020
Filed — Alteration
HEREWITH FILING PLUMBING WORK IN CONJUNCTION WITH NB 421945097
Q00334614-I1
05/26/2020
Filed — Alteration
ERECT CONSTRUCTION FENCE TO SAFE GUARD PROPERTY IN CONJUNCTION WITH NB #421945097
Q00215726-P1
01/29/2020
Violation issued (ECB, closed)
Unknown
01/29/2020
Violation issued (ECB, closed)
Construction
01/29/2020
Violation issued (ECB, closed)
Unknown
01/29/2020
Violation issued (ECB, closed)
Unknown
09/05/2019
Objection raised — Scope
09/05/2019
Objection resolved — Addressed
09/05/2019
Objection raised — Scope
09/05/2019
Objection resolved — Addressed
09/05/2019
Objection raised — Inspections
09/05/2019
Objection resolved — Addressed
09/05/2019
Objection raised — Scope
09/05/2019
Objection resolved — Addressed
09/03/2019
Filed — Alteration
ERECT CONSTRUCTION FENCE TO SAFE GUARD PROPERTY IN CONJUNCTION WITH NB #421945097
Q00215726-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING07/03/2024
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT04/09/2024
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL10/05/2023
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT05/12/2023
DOB NOWSprinklersSigned-offVILLAGE P & H NY INC10/07/2022
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR08/30/2022
DOB NOWConstruction FenceSigned-offDAVID CONSTRUCTING NY, IN05/10/2022
BIS—ISSUEDDAVID CONSTRUCTING NY, IN03/07/2024
BIS—ISSUEDDAVID CONSTRUCTING NY, IN08/02/2023
BIS—ISSUEDDAVID CONSTRUCTING NY, IN04/05/2023
BIS—ISSUEDDAVID CONSTRUCTING NY, IN06/07/2022
BIS—ISSUEDDAVID CONSTRUCTING NY, IN05/31/2022
BISOTISSUEDDYNASTY CONTRACTING LLC02/18/2022
BIS—ISSUEDCHAEL CONSTRUCTION INC03/05/2021
BISOTISSUEDDYNASTY CONTRACTING LLC01/08/2021
BISOTISSUEDDYNASTY CONTRACTING LLC12/24/2020
BIS—ISSUEDCHAEL CONSTRUCTION INC09/29/2020
BISOTISSUEDDYNASTY CONTRACTING LLC01/24/2020
BIS—ISSUEDCHAEL CONSTRUCTION INC10/29/2019
1 project · most recent 08/27/2024
FiledStatusContractorScope
08/27/2024CompleteC.Q. ELECTR'L CONTRG CORP1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
01/13/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
10/01/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
09/19/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/14/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/18/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/18/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
10/25/2024Sprinkler SystemsRajasekhar Sakhamurispecial
03/21/2024Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
03/21/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRajasekhar Sakhamurispecial
03/21/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesBRIAN FLYNNspecial
03/21/2024HVAC insulation and sealing Rajasekhar Sakhamurienergy_progress
03/21/2024HVAC and service water heating system controls Rajasekhar Sakhamurienergy_progress
03/21/2024Maintenance informationRajasekhar Sakhamurienergy_progress
03/21/2024HVAC and service water heating equipment Rajasekhar Sakhamurienergy_progress
▾Documents — 182 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Plumbing2
08/28/2026Q00334614-I1Request digital key ↗
08/14/2026Q00334614-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/27/2026Q00405399-I1Request digital key ↗
08/15/2026Q00405399-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
08/28/2026Q00215726-P1Request digital key ↗
08/15/2026Q00215726-I1Request digital key ↗
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION12
06/02/2025421739284Open ↗
05/23/2025421739284Open ↗
04/17/2025421887391Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION7
06/27/2022421945097Open ↗
05/31/2022440572266Open ↗
05/20/2022421945097Open ↗
Showing 3 of 7 on file for this type
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
04/28/2025421887391Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM2
05/27/2020421945097Open ↗
09/03/2019421739284Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
05/27/2020421945097Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
09/05/2019421887391Open ↗
▸BISVERIFY TAX LOT1
01/31/2025421945097Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
05/27/2020421945097Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/31/2025421945097Open ↗
▸Seals & Professional Certifications23
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
06/02/2020421945097Open ↗
06/02/2020421945097Open ↗
03/19/2020421945097Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/28/2026Q00215726-I1Open ↗
08/28/2026Q00215726-P1Open ↗
08/28/2026Q00334614-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/24/2026Q00334614-P1Open ↗
08/24/2026Q00334614-P1Open ↗
08/24/2026Q00334614-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/24/2026Q00334614-P1Open ↗
08/24/2026Q00334614-P1Open ↗
08/24/2026Q00334614-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/05/2019440572266Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/05/2019440572266Open ↗
▸Trade Schedules & Equipment4
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
03/25/2025421945097Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/27/2019421739284Open ↗
▸BISSPRINKLER SYSTEMS1
03/24/2025421945097Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/30/2026421945097Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST4
04/21/2025421887391Open ↗
05/27/2020421945097Open ↗
03/19/2020421945097Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE SIGNOFF2
05/06/2025421945097Open ↗
04/25/2025421887391Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
11/07/2019421739284Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
06/15/2020421945097Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/05/2019440572266Open ↗
09/03/2019421739284Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
06/02/2020421945097Open ↗
03/19/2020421945097Open ↗
10/30/2019421739284Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/15/2020421945097Open ↗
05/27/2020421945097Open ↗
▸BISINTERIOR LIGHTING POWER1
03/25/2025421945097Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
03/25/2025421945097Open ↗
▸BISFENESTRATION AREAS1
03/25/2025421945097Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/24/2025421945097Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
03/25/2025421945097Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/25/2025421945097Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/24/2025421945097Open ↗
▸Inspections & Test Reports26
▸BISTECHNICAL REPORT: RESPONSIBILITY11
04/06/2022440572266Open ↗
08/26/2020421945097Open ↗
06/15/2020421945097Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
10/20/2020421945097Open ↗
06/02/2020421945097Open ↗
10/30/2019421739284Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
10/20/2020421945097Open ↗
10/30/2019421739284Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
01/31/2025421945097Open ↗
08/26/2020421945097Open ↗
▸BISBPP: FIELD INSPECTION1
04/28/2025421887391Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/24/2025421945097Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/24/2025421945097Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
03/24/2025421945097Open ↗
▸BISMASONRY1
03/24/2025421945097Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
03/24/2025421945097Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
03/24/2025421945097Open ↗
▸BISSOIL REPORT1
05/27/2020421945097Open ↗
▸Approvals, Objections & Sign-offs12
▸BISLETTERS - SUPPORTING DOCUMENTATION6
02/04/2021440572266Open ↗
09/05/2019421887391Open ↗
09/03/2019421739284Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
03/25/2024421945097Open ↗
03/19/2020421945097Open ↗
06/27/2019421739284Open ↗
▸BISSUPERSEDING LETTER2
06/27/2022421945097Open ↗
05/31/2022440572266Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/07/2022440572266Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
04/06/2022440572266Open ↗
08/06/2021440572266Open ↗
11/05/2019440572266Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms15
▸BISADDITIONAL INFORMATION6
04/21/2025421887391Open ↗
04/03/2024421945097Open ↗
05/14/2021440572266Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM5
05/31/2022440572266Open ↗
02/04/2021440572266Open ↗
10/20/2020421945097Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET3
03/19/2020421945097Open ↗
05/15/2019421887391Open ↗
05/06/2019421739284Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/15/2019421887391Open ↗
▸Other Documents15
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION5
06/15/2020421945097Open ↗
05/27/2020421945097Open ↗
05/27/2020421945097Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
04/28/2025421887391Open ↗
04/28/2025421887391Open ↗
▸BISPLOT DIAGRAM2
09/03/2019421739284Open ↗
06/27/2019421739284Open ↗
▸BISSHUTOFF DAMPERS1
03/25/2025421945097Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
05/27/2020421945097Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
04/28/2025421887391Open ↗
▸BISMAINTENANCE INFORMATION1
03/25/2025421945097Open ↗
▸BISPERMANENT CERTIFICATE1
03/25/2025421945097Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
04/28/2025421887391Open ↗