← Back
Factory, light manufacturing
5-21 46 ROAD
QUEENS · BIN 4000039
💬 Discuss this project
1939Year Built
1Stories
F5Building Class
M1-5A/R8Zoning
4,000 sfGross Floor Area
1Units
Factory, light manufacturing · Owner of record: PLAX BL27, LLC · 4,000 sf lot · 1 FAR built · Flood zone X500
Locations of Work
Fire Protection
Floor 11p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KM ENGINEERING, D.P.C110/13/2022
AM ARCHITECT'S STUDIO LLC105/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S M EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SCHWEITZER AND CROSSONGeneral Contractor303/21/2026
ENOBRAC PLUMBING, INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KM ENGINEERING, D.P.C.5745110/13/2022
AM DESIGN STUDIO LLC4413105/18/2022
Building Lifecycle
All (8)Filed (2)Permit Issued (2)Signed Off (1)Inspection (2)Special Inspection (1)
03/03/2023
Signed off — Alteration
Q00723485-I1
11/23/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/18/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/09/2022
Permit issued — Sprinklers
Q08009835-I1-EW-SP
10/13/2022
Filed — Alteration
ADDITION TO THE EXISTING SPRINKLER SYSTEM IN SPRAY BOOTH.
Q08009835-I1
09/25/2022
Special inspection requirement — Sprinkler Systems
KRZYSZTOF MURAWSKI
06/07/2022
Permit issued — General Construction
Q00723485-I1-GC-CX
05/18/2022
Filed — Alteration
Q00723485-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offENOBRAC PLUMBING, INC11/09/2022
DOB NOWGeneral ConstructionSigned-offSCHWEITZER AND CROSSON06/07/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/23/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/18/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
09/25/2022Sprinkler SystemsKRZYSZTOF MURAWSKIspecial
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026Q00723485-I1Request digital key ↗
08/25/2026Q08009835-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026Q00723485-I1Open ↗
08/25/2026Q08009835-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026Q08009835-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00723485-I1Open ↗