← Back
Two stories - detached, small or mid-size
5 BELMONT PLACE
STATEN ISLAND · St. George-New Brighton · BIN 5000331
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R3AZoning
1,648 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalGeneral
Roof4p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC103/03/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTURION SOLAR ENERGYGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854103/03/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
08/12/2025
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
S01187161-I1
03/10/2025
Permit issued — Solar
S01187161-I1-SL
03/03/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
S01187161-I1
02/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
02/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
02/26/2025
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
02/26/2025
Special inspection requirement — Final
TOM PETERSEN
02/26/2025
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offCENTURION SOLAR ENERGY03/10/2025
1 project · most recent 03/02/2025
FiledStatusContractorScope
03/02/2025CompleteBERGER QUALITY ELEC'L CON—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/26/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
02/26/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
02/26/2025Energy Code Compliance InspectionsTOM PETERSENprogress
02/26/2025FinalTOM PETERSENprogress
02/26/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026S01187161-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026S01187161-I1Open ↗
08/25/2026S01187161-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01187161-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026S01187161-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01187161-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01187161-I1Open ↗