| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/03/2026 | Permit Issued | 4IR IDEAL INC | Air Conditioning Systems | Cooling Task ×3 |
| 01/18/2024 | Permit Issued | EPIC MECHANICAL CONTRACTO | Air Conditioning Systems | Cooling Compu-Aire MTEP-2 2 tons ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/03/2026 | Permit Issued | BEDROCK MECHANICAL INC | 220 heads, 1 outlets |
| 07/29/2026 | Permit Issued | FIVE BORO ASSOCIATES INC | Sprinkler System |
| 03/05/2026 | Permit Issued | FIVE BORO ASSOCIATES INC | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/03/2026 | Permit Issued | PAR PLUMBING CO., INC | Water/Sanitary |
| 03/05/2026 | Signed-off | SOLUTION MECH CONTNG LLC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/16/2026 | Permit Issued | ENNELL GRP ELECTRIC CORP | General Wiring |
| 08/18/2026 | Permit Issued | L.E.A. ELECTRIC CORP. | General Wiring |
| 11/04/2025 | Complete | ACCURATE ELEC'L CONTR'S C | General Wiring |
| 04/14/2025 | Permit Issued | JRD ELECTRIC CORP. | General Wiring |
| 03/06/2025 | Permit Issued | JRD ELECTRIC CORP. | General Wiring |
| 12/30/2024 | Complete | JRD ELECTRIC CORP. | General Wiring |
| 07/29/2024 | Complete | JRD ELECTRIC CORP. | General Wiring |
| 07/03/2023 | Complete | EGG ELECTRIC INC. | General Wiring, Lighting |
| 01/13/2023 | Complete | CENTENNIAL ELEVATOR INDUS | General Wiring |
| 10/11/2022 | Permit Issued | GILSTON BROTHERS ELECT'L | General Wiring |
| 08/15/2022 | Complete | TEAM ELECTRIC, INC | General Wiring |
| 06/14/2022 | Complete | JRD ELECTRIC CORP. | General Wiring |
| 01/20/2022 | Permit Issued | TEAM ELECTRIC, INC | General Wiring |
| 09/24/2021 | Complete | TEAM ELECTRIC, INC | General Wiring |
| 08/25/2021 | Permit Issued | JTE ELECTRICAL SERVICES | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/03/2026 | Permit Issued | PAR PLUMBING CO., INC | Steel |
| 07/29/2026 | Permit Issued | FIVE BORO ASSOCIATES INC | Steel |
| 08/22/2023 | Permit Issued | SAVCON LLC | 3 scope_items |
| Owner | Filings | Most Recent |
|---|---|---|
| 5 BRYANT PARK PROPERTY INVESTORS IV | 39 | 09/13/2026 |
| CBRE | 223 | 07/08/2026 |
| SKYLINE SCAFFOLDING GROUP | 7 | 07/08/2026 |
| CBRE ASSET SERVICES | 7 | 07/08/2026 |
| JONES APPAREL GROUP USA I | 1 | 03/22/2026 |
| JONES APPAREL GROUP INC. | 1 | 03/22/2026 |
| BREA PROPERTY | 1 | 03/22/2026 |
| TRIZEC PROPERTIES | 252 | 03/22/2026 |
| TRIZEE PROPERTIES PROPERT | 1 | 03/22/2026 |
| TRIZECHAHN 1065 AVE OF AMER | 348 | 03/22/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 05/23/2018 | $640.0M | — | TRIZECHAHN 1065 AVENUE OF THE AMERICAS PROPERTY → 5 BRYANT PARK PROPERTY INVESTORS IV, LLC | $978/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| GILSANZ MURRAY STEFICEK LLP | 3 | 08/03/2026 |
| ROBERT DERECTOR ASSOCIATES | 10 | 07/31/2026 |
| SASAKI | 2 | 07/31/2026 |
| ZACHARY GIDICH ARCHITECTURE AND DES | 3 | 07/30/2026 |
| MG ENGINEERING D.P.C. | 40 | 07/27/2026 |
| STUDIOS ARCHITECTURE | 1 | 07/22/2026 |
| ENV ARCHITECTS, DPC | 1 | 03/05/2026 |
| FOGARTY FINGER ARCHITECTURE PLLC | 7 | 12/26/2025 |
| OTJ ARCHITECTS | 1 | 10/20/2025 |
| NEWTEC ENGINEERING | 1 | 02/03/2025 |
| CPG ARCHITECTS | 2 | 07/18/2024 |
| OLA CONSULTING ENGINEERS, PC | 1 | 01/18/2024 |
| HOK | 1 | 01/16/2024 |
| SUPERSTRUCTURES ENG. + ARCH. | 8 | 08/22/2023 |
| ELIZABETH MARR | 5 | 06/14/2023 |
| SYSKA HENNESSY GROUP | 2 | 06/14/2023 |
| DPM ARCHITECTURE, P.C. | 1 | 06/14/2023 |
| RAKSHAN MALEK ASSOCIATES, INC. | 6 | 01/30/2023 |
| MOHAMMAD AHEAD, PE | 1 | 11/14/2022 |
| PATUXENT ENGINEERING LLC | 2 | 07/16/2021 |
| S.M. BERGER ARCHITECTURE PC | 1 | 05/14/2021 |
| TED MOUDIS ASSOCIATES | 1 | 04/14/2021 |
| ELLIS L. MCINTOSH JR., AIA | 1 | 02/22/2021 |
| HC ARCHITECT, PC | 4 | 11/15/2019 |
| SEVERUD ASSOCIATES CONSULTING ENGIN | 1 | 09/26/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| A1 EXPEDITING SERVICE CORP. | 122 | 03/21/2026 |
| RIZZO GROUP | 5 | 03/21/2026 |
| GRAND EXPEDITERS NYC | 2 | 03/21/2026 |
| JP EXPEDITE | 8 | 03/21/2026 |
| OUTSOURCE CONSULTANTS, INC. | 16 | 03/21/2026 |
| SUPERSTRUCTURES ENG + ARCH | 8 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 4 | 03/21/2026 |
| PATUXENT ENGINEERING | 4 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 2 | 03/21/2026 |
| LOUIS STRIAR | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| SAVCON LLC | General Contractor | 26 | 07/08/2026 |
| G.B.C. CORPORATION | General Contractor | 10 | 07/08/2026 |
| ENOBRAC PLUMBING, INC | Fire Protection | 7 | 07/08/2026 |
| JT MAGEN & COMPANY INC | General Contractor | 7 | 07/08/2026 |
| SKYLINE SCAFFOLDING GROUP | General Contractor | 6 | 07/08/2026 |
| SPK/LEWIS CONSTRUCTION LL | General Contractor | 6 | 04/09/2026 |
| TRI-STAR CONSTRUCTION CORP | General Contractor | 6 | 07/08/2026 |
| ADVANCED PLBG, MECH & SPR | Fire Protection | 5 | 07/08/2026 |
| ENOBRAC PLUMBING, INC | Plumbing | 5 | 07/08/2026 |
| CORE FOUR CONSTRUCTION IN | General Contractor | 5 | 08/26/2026 |
| VANQUISH GROUP INC | General Contractor | 5 | 07/08/2026 |
| SKYLINE RESTORATION INC | General Contractor | 5 | 07/08/2026 |
| MANHATTAN D ENTERPRISES | General Contractor | 4 | 07/08/2026 |
| STRUCTURE TONE, LLC | General Contractor | 4 | 07/08/2026 |
| TOWER FIRE PROTECTION INC | Fire Protection | 4 | 07/08/2026 |
| POWERHOUSE RETAIL SVCS LL | General Contractor | 4 | 07/08/2026 |
| EPIC MECHANICAL CONTRACTO | General Contractor | 4 | 03/21/2026 |
| ASE HVAC INC | General Contractor | 3 | 03/21/2026 |
| JOHN GALLIN & SON, INC | General Contractor | 3 | 07/08/2026 |
| FIVE BORO ASSOCIATES INC | Fire Protection | 3 | 09/12/2026 |
| BEDROCK MECHANICAL INC | Fire Protection | 2 | 08/26/2026 |
| BENCHMARK BUILDERS LLC | General Contractor | 2 | 08/13/2026 |
| SKYLINE WINDOWS LLC | General Contractor | 2 | 07/08/2026 |
| NUCOR CONSTRUCTION CORP | General Contractor | 2 | 03/21/2026 |
| ABSOLUTE ELEC'L CONTRG OF | Electrical | 2 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| AK ENGINEERING PC | 678 | 11 | 08/03/2026 |
| SOCOTEC ENGINEERING | 4983 | 6 | 07/29/2026 |
| CODEGREEN | 510 | 3 | 03/05/2026 |
| MILROSE CONSULTANTS LLC | 2003 | 16 | 10/20/2025 |
| OBAID MIAN | 849 | 1 | 02/03/2025 |
| ALAN MARGOLIN & ASSOC | 423 | 26 | 08/22/2023 |
| SUPERSTRUCTURES ENGINEERI | 374 | 2 | 06/14/2023 |
| RAKSHAN MALEK ASSOCIATES | 3352 | 6 | 01/30/2023 |
| ATLANTIC ENGINEERINGLABOR | 1381 | 2 | 10/08/2021 |
| CATALPA SPECIAL INSPECTIO | 2004 | 1 | 05/14/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | FIVE BORO ASSOCIATES INC | 09/10/2026 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 08/27/2026 |
| DOB NOW | Plumbing | Permit Issued | BEDROCK MECHANICAL INC | 08/25/2026 |
| DOB NOW | Standpipe | Permit Issued | BEDROCK MECHANICAL INC | 08/25/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 08/25/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | 4IR IDEAL INC | 08/19/2026 |
| DOB NOW | Structural | Permit Issued | BENCHMARK BUILDERS LLC | 08/12/2026 |
| DOB NOW | General Construction | Permit Issued | BENCHMARK BUILDERS LLC | 08/04/2026 |
| DOB NOW | General Construction | Permit Issued | CORE FOUR CONSTRUCTION IN | 07/30/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CORE FOUR CONSTRUCTION IN | 07/30/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | VOLK INDUSTRIAL SERVICES | 03/18/2026 |
| DOB NOW | Sprinklers | Permit Issued | FIVE BORO ASSOCIATES INC | 03/18/2026 |
| DOB NOW | General Construction | Permit Issued | VOLK INDUSTRIAL SERVICES | 03/12/2026 |
| DOB NOW | Plumbing | Signed-off | SOLUTION MECH CONTNG LLC | 03/10/2026 |
| DOB NOW | Structural | Signed-off | CORE FOUR CONSTRUCTION IN | 03/06/2026 |
| DOB NOW | Mechanical Systems | Signed-off | CORE FOUR CONSTRUCTION IN | 01/15/2026 |
| DOB NOW | General Construction | Signed-off | CORE FOUR CONSTRUCTION IN | 01/15/2026 |
| DOB NOW | General Construction | Signed-off | SPK/LEWIS CONSTRUCTION LL | 11/25/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SPK/LEWIS CONSTRUCTION LL | 11/25/2025 |
| DOB NOW | General Construction | Permit Issued | ASE HVAC INC | 11/05/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SPK/LEWIS CONSTRUCTION LL | 10/30/2025 |
| DOB NOW | General Construction | Signed-off | SPK/LEWIS CONSTRUCTION LL | 10/22/2025 |
| DOB NOW | Mechanical Systems | Signed-off | DONNELLY MECHANICAL CORP | 02/03/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | EPIC MECHANICAL CONTRACTO | 10/25/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | EPIC MECHANICAL CONTRACTO | 10/08/2024 |
| DOB NOW | Mechanical Systems | Signed-off | JT MAGEN & COMPANY INC | 07/25/2024 |
| DOB NOW | Plumbing | Signed-off | ASHLAND PLUMBING CORP | 07/23/2024 |
| DOB NOW | General Construction | Signed-off | JT MAGEN & COMPANY INC | 07/23/2024 |
| DOB NOW | General Construction | Permit Issued | SAVCON LLC | 10/31/2023 |
| DOB NOW | General Construction | Signed-off | NUCOR CONSTRUCTION CORP | 06/22/2023 |
| DOB NOW | Sprinklers | Signed-off | ABCO-PEERLESS SPRKLR CORP | 06/21/2023 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 06/16/2023 |
| DOB NOW | Sprinklers | Signed-off | LAB PLBG & HTG CO INC | 06/16/2023 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 06/16/2023 |
| DOB NOW | Structural | Signed-off | SKYLINE RESTORATION INC | 02/17/2023 |
| DOB NOW | Sign | Signed-off | ELMER DAWSON | 11/17/2022 |
| DOB NOW | Plumbing | Signed-off | SOLUTION MECH CONTNG LLC | 10/17/2022 |
| DOB NOW | General Construction | Signed-off | SAVCON LLC | 10/17/2022 |
| DOB NOW | Plumbing | Signed-off | FIVE BORO ASSOCIATES INC | 10/17/2022 |
| DOB NOW | Mechanical Systems | Signed-off | SAVCON LLC | 10/13/2022 |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/28/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/16/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/23/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/10/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 06/03/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 06/03/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/03/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 05/26/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/26/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/14/2026 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 03/31/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/31/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/16/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/03/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/28/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/22/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/14/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/14/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/02/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/23/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/08/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/08/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/12/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/14/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/07/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/03/2026 | Final | Zachary Gidich | progress |
| 08/03/2026 | Interior lighting power | Zachary Gidich | energy_progress |
| 07/28/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 07/28/2026 | Sprayed fire-resistant materials | Ari Kamo | special |
| 07/27/2026 | Sprayed fire-resistant materials | Ari Kamo | special |
| 07/27/2026 | Structural Steel - Welding | Ari Kamo | special |
| 07/27/2026 | Structural Steel - High Strength Bolting | Ari Kamo | special |
| 07/24/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 07/24/2026 | Sprayed fire-resistant materials | Ari Kamo | special |
| 07/22/2026 | Heating Systems | ALEXIS SCHLESSINGERMAN | special |
| 07/20/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 07/20/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 07/20/2026 | Structural Stability – Alterations of existing buildings | ALEXIS SCHLESSINGERMAN | special |
| 07/20/2026 | Structural Steel - High Strength Bolting | ALEXIS SCHLESSINGERMAN | special |
| 07/20/2026 | Structural Steel - Welding | ALEXIS SCHLESSINGERMAN | special |
| 07/20/2026 | Fire-Resistance Rated Construction | ALEXIS SCHLESSINGERMAN | progress |
| 07/20/2026 | Sprayed fire-resistant materials | ALEXIS SCHLESSINGERMAN | special |
| 07/20/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 07/20/2026 | Sprayed fire-resistant materials | ALEXIS SCHLESSINGERMAN | special |
| 07/20/2026 | Structural Steel - Details | ALEXIS SCHLESSINGERMAN | special |
| 07/20/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 07/17/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 07/10/2026 | Final | Ari Kamo | progress |
| 07/10/2026 | Final | Ari Kamo | progress |
| 07/10/2026 | Structural Steel - Details | Ari Kamo | special |