← Back
BuildNYC
One story - permanent living quarter
5 CANTERBURY AVENUE
STATEN ISLAND · BIN 5030244
💬 Discuss this project
1955Year Built
1Stories
A2Building Class
R3XZoning
960 sfGross Floor Area
1Units
One story - permanent living quarter · 5,350 sf lot · 0.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPhotovoltaic system installation3p · 2 filings · 20 docs
Attic1p · 1 filing · 20 docs
Floor 28p · 1 filing · 20 docs
Floor 114p · 1 filing · 20 docs
Site & exterior3p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A Tech Engineering NYC207/07/2026
Tom Petersen Architect109/14/2025
Chris Ponisi, Architect312/12/2024
Rogers Calvanico Group112/10/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Dawn Ponisi303/21/2026
A Tech Engineering NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A&H Express Plumbing & HeatingPlumbing1107/08/2026
A.D. Alpha ConstructionGeneral Contractor507/08/2026
Energy Brite Ins & Solarspecialty_contractor303/21/2026
A.D. Alpha ConstructionScaffold207/08/2026
A D Alpha Constructionspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738407/07/2026
Thomas Petersen Architect7854109/14/2025
Building Lifecycle
11/09/2026
Signed off — Alteration CO
INSTALL NEW 17' CONCRETE CURB CUT
S01144277-S1
08/04/2026
Signed off — Alteration CO
INSTALL NEW 17' CONCRETE CURB CUT
S01144277-S2
07/21/2026
Special inspection requirement — Maintenance information
anthony santoro
07/21/2026
Special inspection requirement — Mechanical Systems
anthony santoro
07/21/2026
Special inspection requirement — Final
anthony santoro
55 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offA.D. Alpha Construction05/06/2026
DOB NOWCurb CutSigned-offA.D. Alpha Construction05/05/2026
DOB NOWSolarSigned-offEnergy Brite Ins & Solar09/30/2025
DOB NOWConstruction FenceSigned-offA.D. Alpha Construction05/14/2025
DOB NOWGeneral ConstructionPermit IssuedA.D. Alpha Construction05/14/2025
DOB NOWPlumbingSigned-offA&H Express Plumbing & Heating05/07/2025
DOB NOWGeneral ConstructionPermit IssuedA.D. Alpha Construction04/08/2025
DOB NOWConstruction FenceSigned-offA.D. Alpha Construction04/08/2025
1 project · most recent 07/07/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
07/07/2026Signed-offA.D. Alpha ConstructionAir Conditioning Systems, Ventilation Systems
3 projects · most recent 08/05/2025
General Wiring
FiledStatusContractorScope
08/05/2025CompleteRidge Electric—
06/29/2025CompleteApco ElectricalGeneral Wiring
05/21/2021CompleteFichera ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/16/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/03/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/11/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/11/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
07/21/2026Maintenance informationanthony santoroenergy_progress
07/21/2026Mechanical Systemsanthony santorospecial
07/21/2026Finalanthony santoroprogress
07/21/2026Energy Code Compliance Inspectionsanthony santoroprogress
07/21/2026HVAC-R and service water heating equipmentanthony santoroenergy_progress
07/21/2026Shutoff dampersanthony santoroenergy_progress
07/21/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
07/21/2026Ventilation and air distribution systemanthony santoroenergy_progress
07/21/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
05/14/2026Energy Code Compliance Inspectionsanthony santoroprogress
05/14/2026Maintenance informationanthony santoroenergy_progress
05/14/2026HVAC-R and service water heating equipmentanthony santoroenergy_progress
05/14/2026Ventilation and air distribution systemanthony santoroenergy_progress
05/14/2026Finalanthony santoroprogress
05/14/2026Mechanical Systemsanthony santorospecial
05/14/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
05/14/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
05/14/2026Shutoff dampersanthony santoroenergy_progress
09/14/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
09/14/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
09/14/2025Energy Code Compliance InspectionsTOM PETERSENprogress
09/14/2025FinalTOM PETERSENprogress
09/14/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
12/04/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
12/04/2024Fire-Resistant Penetrations and Jointsanthony santorospecial
Latest 25 of 54.
101 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account