← Back
Two family frame
5 CORNELL PLACE
STATEN ISLAND · BIN 5170237
💬 Discuss this project
2019Year Built
2Stories
B2Building Class
R3AZoning
2,500 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 5,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OVER DEVELOPMENT1807/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN FENG, ARCHITECT208/17/2025
JAMES V MORRI207/25/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERGY SOLAR403/21/2026
JAMES V MORRI, RA103/21/2026
VIP EXPEDITING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FLOW-RIGHT PLBG & HTG CORPlumbing603/22/2026
OVER DEVELOPEMENT LTDGeneral Contractor507/08/2026
AMERGY SOLAR INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802208/17/2025
Building Lifecycle
All (25)Filed (4)Permit Issued (5)Signed Off (3)Violation (3)Special Inspection (10)
08/19/2025
Signed off — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
S01180082-I1
08/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chun Feng
08/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
08/18/2025
Special inspection requirement — Final
Chun Feng
08/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
08/18/2025
Special inspection requirement — Air barrier - visual inspection
Chun Feng
08/17/2025
Filed — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
S01180082-P1
04/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
04/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chun Feng
04/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
04/08/2025
Special inspection requirement — Final
Chun Feng
04/08/2025
Special inspection requirement — Air barrier - visual inspection
Chun Feng
02/21/2025
Permit issued — Solar
S01180082-I1-SL
02/12/2025
Filed — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
S01180082-I1
09/25/2019
Signed off — Alteration
17'-0" CURB CUT
S00199161-I1
09/06/2019
Signed off — Alteration
S00076390-I1
07/26/2019
Permit issued — Curb Cut
S00199161-I1-CC
07/25/2019
Filed — Alteration
17'-0" CURB CUT
S00199161-I1
04/20/2019
Violation issued (ECB, closed)
Construction
04/20/2019
Violation issued (ECB, closed)
Construction
04/20/2019
Violation issued (ECB, closed)
Construction
01/04/2019
Permit issued — Construction Fence
S00076390-I1-FN
12/28/2018
Permit issued — Construction Fence
S00076390-I1-FN
09/13/2018
Permit issued — Construction Fence
S00076390-I1-FN
09/07/2018
Filed — Alteration
S00076390-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offAMERGY SOLAR INC02/21/2025
DOB NOWCurb CutPermit IssuedOVER DEVELOPEMENT LTD07/26/2019
DOB NOWConstruction FenceSigned-offOVER DEVELOPEMENT LTD01/04/2019
DOB NOWConstruction FenceSigned-offOVER DEVELOPEMENT LTD12/28/2018
DOB NOWConstruction FenceSigned-offOVER DEVELOPEMENT LTD09/13/2018
BISSPISSUEDFLOW-RIGHT FIRE SUPP CORP03/12/2019
BIS—ISSUEDOVER DEVELOPEMENT LTD01/07/2019
BISPLISSUEDFLOW-RIGHT PLBG & HTG COR11/27/2018
BIS—ISSUEDOVER DEVELOPEMENT LTD10/31/2018
2 projects · most recent 02/12/2025
General Wiring Lighting
FiledStatusContractorScope
02/12/2025CompleteI.P. ELECTRIC INC—
03/12/2019CompleteGB ELECTRICAL CORP.General Wiring, Lighting
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
08/18/2025Structural Stability – Alterations of existing buildingsChun Fengspecial
08/18/2025Fire-Resistant Penetrations and JointsChun Fengspecial
08/18/2025FinalChun Fengprogress
08/18/2025Energy Code Compliance InspectionsChun Fengprogress
08/18/2025Air barrier - visual inspectionChun Fengenergy_progress
04/08/2025Fire-Resistant Penetrations and JointsChun Fengspecial
04/08/2025Structural Stability – Alterations of existing buildingsChun Fengspecial
04/08/2025Energy Code Compliance InspectionsChun Fengprogress
04/08/2025FinalChun Fengprogress
04/08/2025Air barrier - visual inspectionChun Fengenergy_progress
▾Documents — 84 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch3
08/26/2026S00076390-I1Request digital key ↗
08/20/2026S01180082-I1Request digital key ↗
08/20/2026S01180082-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/26/2026S00199161-I1Request digital key ↗
▸Applications & Permits12
▸BISWORK PERMIT APPLICATION6
03/12/2019520357444Open ↗
01/08/2019520339125Open ↗
11/27/2018520357444Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
09/06/2019520339125Open ↗
10/02/2018520357444Open ↗
09/17/2018520339125Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
08/30/2018520350183Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/10/2019520339125Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
09/17/2018520339125Open ↗
▸BISZONING DIAGRAM1
10/24/2018520339125Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
09/17/2018520339125Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
08/30/2018520350183Open ↗
▸Seals & Professional Certifications24
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
09/27/2019520339125Open ↗
11/05/2018520339125Open ↗
10/31/2018520339125Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026S01180082-P1Open ↗
09/01/2026S01180082-P1Open ↗
09/01/2026S01180082-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/20/2026S01180082-P1Open ↗
08/20/2026S01180082-I1Open ↗
08/13/2026S00076390-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026S01180082-P1Open ↗
09/01/2026S01180082-P1Open ↗
08/26/2026S01180082-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/02/2018520357444Open ↗
09/17/2018520339125Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/02/2018520357444Open ↗
09/17/2018520339125Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
08/29/2019520339125Open ↗
10/02/2018520357444Open ↗
09/17/2018520339125Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
09/17/2018520339125Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
09/27/2019520339125Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
09/27/2019520339125Open ↗
11/02/2018520339125Open ↗
▸BISSTREET TREE CHECKLIST1
09/17/2018520339125Open ↗
▸BISSTREET TREES SITE PLAN1
07/29/2019520339125Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
09/27/2019520339125Open ↗
11/02/2018520339125Open ↗
09/17/2018520339125Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/27/2019520339125Open ↗
▸Inspections & Test Reports4
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
08/30/2018520350183Open ↗
▸BISHYDRO FLOW TEST LETTER1
10/02/2018520357444Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
10/31/2018520339125Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
10/02/2018520357444Open ↗
▸Approvals, Objections & Sign-offs9
▸BISADMINISTRATIVE OBJECTIONS3
10/10/2018520357444Open ↗
09/17/2018520339125Open ↗
07/02/2018520350183Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
09/30/2019520339125Open ↗
09/27/2019520339125Open ↗
09/24/2019520357444Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
08/30/2018520350183Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
09/17/2018520339125Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01180082-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
09/24/2019520357444Open ↗
10/02/2018520357444Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
09/27/2019520339125Open ↗
▸Filing & Intake Forms8
▸BISBOROUGH INTAKE FORM5
09/30/2019520339125Open ↗
09/27/2019520339125Open ↗
09/24/2019520357444Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET3
10/02/2018520357444Open ↗
09/17/2018520339125Open ↗
07/02/2018520350183Open ↗
▸Other Documents3
▸BISPLOT DIAGRAM1
09/17/2018520339125Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
08/30/2018520350183Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
08/30/2018520350183Open ↗