Condo, residential tower (mixed-use, multi-family elevator) [derived]
5 Harrison Stret Condominium
5 HARRISON STREET · BIN 1085818
💬 Discuss this project
2000Year Built
6Stories
RMBuilding Class
C6-2AZoning
15,330 sfGross Floor Area
7Units
Rent Stabilized10 Open Violations 9 unresolved · 1 paperwork only ▸
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 2,296 sf lot · 6.68 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof9p · 2 filings · 19 docs
Floor 31p · 1 filing · 6 docs
Floor 25p · 1 filing · 3 docs
Floor 111p · 1 filing · 16 docs
Cellar11p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STEEL SYSTEMS LLC503/22/2026
5 HARRISON ASSOC LTD103/22/2026
77 HUDSON403/22/2026
77 HUSDON INC103/22/2026
5 HARRISON ST ASSOC1503/21/2026
5 HARRISON CONDOMINIUM103/21/2026
58 THOMAS STREET ASSOCIATES103/21/2026
5 HARRISON STRET CONDO ASSOCIATE103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VOLUME SPACE CONSULTING INC.104/17/2025
JORGE I AGUIRRE, P.E.306/26/2024
XC ENGINEERING PC308/26/2023
EP ENGINEERING LLC610/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JENNY FLORES EXPEDITING603/21/2026
PRAXIS WORKSHOP603/21/2026
G DESIGN DRAFTING603/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BECKMAN STUDIO DESIGN BUIGeneral Contractor807/08/2026
PRECISION WORLDWIDEGeneral Contractor507/08/2026
STEEL SYSTEMS LLCGeneral Contractor303/21/2026
APOLLO PLBG & HTG INCPlumbing207/08/2026
HVAC EXPERTS, INCGeneral Contractor207/08/2026
ABSOLUTE MECH CO. INCPlumbing207/08/2026
AQUA PLUMBING & HTNG CORPPlumbing107/08/2026
METFLOW FIRE CONTROL LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
COMPLY BUILDING GROUP8622306/26/2024
METRIC CONSULTING AND INS1803108/26/2023
XC ENGINEERING PC6692208/17/2023
Building Lifecycle
All (111)Filed (13)Permit Issued (16)Signed Off (5)Violation (38)Inspection (8)Objection (6)Special Inspection (25)
05/12/2026
Signed off — Alteration
MODIFY EXIST. FLOOR LAYOUT PER PLAN. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M00915979-S1
04/22/2026
Signed off — Alteration
PROPOSED ALTERATION FOR THE PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION ALTERATION DOB#M01019830-I1 FOR THE RENOVATION OF AN EXISTING APTMT UNIT ON THE 2ND FLOOR OF AN EXISTING MIXED-USE, 6-STORY BLDG W NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01019831-I1
04/22/2026
Signed off — Alteration
PROPOSED RENOVATION OF AN EXISTING RESIDENTIAL UNIT ON THE 2ND FLOOR OF AN EXISTING MIX-USE, 6 STORY BUILDING. NO CHANGE IN USE, EGRESS, BULK, USE, OR OCCUPANCY UNDER THIS APPLICATION
M01019830-I1
03/06/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/06/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/17/2025
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01211427-I1
04/17/2025
Permit issued — Supported Scaffold
M01211427-I1-SF
03/07/2025
Permit issued — Mechanical Systems
M01019834-I1-MS
03/05/2025
Permit issued — Plumbing
M01019831-I1-PL
02/18/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/26/2024
Permit issued — Mechanical Systems
M01019834-I1-MS
11/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/21/2024
Permit issued — General Construction
M00915979-I1-GC
07/31/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/31/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/24/2024
Permit issued — Mechanical Systems
M01019834-I1-MS
07/22/2024
Permit issued — General Construction
M01019830-I1-GC
07/09/2024
Permit issued — Mechanical Systems
M01019834-I1-MS
06/26/2024
Filed — Alteration
Alteration of the Mechanical work in conjunction with the general construction application M01019830 for the 2nd-floor apartment. There is no change in use or occupancy under this application.
M01019834-I1
06/20/2024
Permit issued — General Construction
M01019830-I1-GC
06/17/2024
Permit issued — Plumbing
M01019831-I1-PL
06/05/2024
Objection raised — Accessibility
06/05/2024
Objection resolved — Addressed
05/23/2024
Filed — Alteration
PROPOSED ALTERATION FOR THE PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION ALTERATION DOB#M01019830-I1 FOR THE RENOVATION OF AN EXISTING APTMT UNIT ON THE 2ND FLOOR OF AN EXISTING MIXED-USE, 6-STORY BLDG W NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01019831-I1
05/23/2024
Filed — Alteration
PROPOSED RENOVATION OF AN EXISTING RESIDENTIAL UNIT ON THE 2ND FLOOR OF AN EXISTING MIX-USE, 6 STORY BUILDING. NO CHANGE IN USE, EGRESS, BULK, USE, OR OCCUPANCY UNDER THIS APPLICATION
M01019830-I1
05/21/2024
Special inspection requirement — Energy Code Compliance Inspections
ANA ACCETTA
05/21/2024
Special inspection requirement — Interior lighting power
ANA ACCETTA
05/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANA ACCETTA
05/21/2024
Special inspection requirement — Lighting in dwelling units
ANA ACCETTA
05/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANA ACCETTA
04/24/2024
Special inspection requirement — Final
ANA ACCETTA
04/16/2024
Violation issued (HPD, closed)
A
03/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/04/2024
Permit issued — Plumbing
M00915979-S1-EW-SP
02/01/2024
Permit issued — Sprinklers
M00915979-S1-PL
11/15/2023
Violation issued (HPD, closed)
I
11/09/2023
Permit issued — General Construction
M00915979-I1-GC
11/09/2023
Permit issued — Mechanical Systems
M00915979-S2-MS
08/29/2023
Objection resolved — Addressed
08/26/2023
Filed — Alteration
MODIFY EXIST. FLOOR LAYOUT PER PLAN. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M00915979-S2
08/22/2023
Special inspection requirement — Duct leakage testing, insulation and design
XIU CHEN
08/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
XIU CHEN
08/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
XIU CHEN
08/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
XIU CHEN
08/22/2023
Special inspection requirement — Maintenance information
XIU CHEN
08/22/2023
Special inspection requirement — Mechanical Systems
XIU CHEN
08/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIU CHEN
08/22/2023
Special inspection requirement — Tenant Protection Plan Compliance
XIU CHEN
08/22/2023
Special inspection requirement — Final
XIU CHEN
08/22/2023
Special inspection requirement — Energy Code Compliance Inspections
XIU CHEN
08/18/2023
Objection resolved — Addressed
08/17/2023
Filed — Alteration
MODIFY EXIST. FLOOR LAYOUT PER PLAN. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M00915979-S1
08/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIU CHEN
08/17/2023
Special inspection requirement — Tenant Protection Plan Compliance
XIU CHEN
08/17/2023
Special inspection requirement — Sprinkler Systems
XIU CHEN
08/16/2023
Objection raised — Structural
08/16/2023
Objection raised — Admin
08/11/2023
Filed — Alteration
MODIFY EXIST. FLOOR LAYOUT PER PLAN. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M00915979-I1
08/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIU CHEN
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedSTEEL SYSTEMS LLC04/17/2025
DOB NOWMechanical SystemsPermit IssuedHVAC EXPERTS, INC03/07/2025
DOB NOWPlumbingSigned-offAPOLLO PLBG & HTG INC03/05/2025
DOB NOWMechanical SystemsPermit IssuedHVAC EXPERTS, INC11/26/2024
DOB NOWGeneral ConstructionPermit IssuedPRECISION WORLDWIDE08/21/2024
DOB NOWMechanical SystemsPermit IssuedBECKMAN STUDIO DESIGN BUI07/24/2024
DOB NOWGeneral ConstructionSigned-offBECKMAN STUDIO DESIGN BUI07/22/2024
DOB NOWMechanical SystemsPermit IssuedBECKMAN STUDIO DESIGN BUI07/09/2024
DOB NOWGeneral ConstructionSigned-offBECKMAN STUDIO DESIGN BUI06/20/2024
DOB NOWPlumbingSigned-offAPOLLO PLBG & HTG INC06/17/2024
DOB NOWPlumbingSigned-offMETFLOW FIRE CONTROL LLC03/04/2024
DOB NOWSprinklersSigned-offAQUA PLUMBING & HTNG CORP02/01/2024
DOB NOWGeneral ConstructionPermit IssuedPRECISION WORLDWIDE11/09/2023
DOB NOWMechanical SystemsPermit IssuedPRECISION WORLDWIDE11/09/2023
DOB NOWPlumbingSigned-offABSOLUTE MECH CO. INC02/26/2021
DOB NOWBoiler EquipmentSigned-offABSOLUTE MECH CO. INC02/18/2021
BISPLISSUED24 SEVEN PLUMBING INC05/05/2016
BISBLISSUEDACCESS PLBG & HTG CORP07/02/2014
BISSPISSUEDACCESS PLBG & HTG CORP06/17/2014
BISOTISSUEDBECKMAN STUDIO DESIGN BUI05/30/2014
BISOTISSUEDBECKMAN STUDIO DESIGN BUI05/30/2014
BISPLISSUEDACCESS PLBG & HTG CORP11/20/2013
BISOTISSUEDBECKMAN STUDIO DESIGN BUI09/19/2013
BISOTISSUEDBECKMAN STUDIO DESIGN BUI08/12/2013
BISOTISSUEDBRIGHTON CONTRACTORS NYC02/03/2011
BISPLISSUEDTHE PLUMBING COMPANY INC11/12/2010
BISMHISSUEDATRIA BUILDERS LLC10/22/2010
BISOTISSUEDATRIA BUILDERS LLC10/22/2010
BISOTISSUEDMARIO ZINO CONTRACTING07/02/2002
BISPLISSUEDMASTERS MECH. PLUMB HEAT ICN.11/20/2001
BIS—ISSUED5 HARRISON ASSOCIATES,LTD.08/21/2001
BISPLISSUEDONOFRIO LODUCA PLBG CORP08/13/2001
BISMHISSUEDMONUMENTAL CONSTRUCTION *05/08/2001
BISOTISSUEDMATRIX BUILDERS INC.03/27/2001
BIS—ISSUED5 HARRISON ASSOCIATES,LTD.08/16/2000
BISPLISSUEDBAY RIDGE MECHANICAL CORP05/15/2000
BISSPISSUEDG.N.T. MECHANICAL, LLC05/15/2000
BISPLISSUEDBAY RIDGE MECHNICAL CORPRP04/07/2000
BISEQISSUEDSTRATEGIC CONSTRUCTION CORP.01/31/2000
BIS—ISSUED5 HARRISON ASSOCIATES,LTD.08/20/1999
+ 2 more permits on file
1 project · most recent 06/26/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/26/2024Permit IssuedHVAC EXPERTS, INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PEFY-P12NMAU-E4 15,000 BTU · Vrf Indoor ×2
PKFY-P08NLMU-ER1.TH 8,000 BTU · Vrf Indoor ×2
MXZ-SM348NAMHZ 54,000 BTU · Condensing Unit ×1
PEFY-P18NMAU-E5 18,000 BTU · Vrf Indoor ×1
Ventilation
Greenheck CSP-B90 50 CFM · Exhaust Fan ×2
1 project · most recent 06/26/2026
General Wiring Lighting
FiledStatusContractorScope
06/26/2026Permit IssuedY.S ELECTRICGeneral Wiring, Lighting
1 project · most recent 04/17/2025
Scaffold
FiledStatusContractorScope
04/17/2025Permit IssuedSTEEL SYSTEMS LLCScaffold
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/06/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/06/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/18/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/31/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/31/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
05/21/2024Energy Code Compliance InspectionsANA ACCETTAprogress
05/21/2024Interior lighting powerANA ACCETTAenergy_progress
05/21/2024Fire-Resistant Penetrations and JointsANA ACCETTAspecial
05/21/2024Lighting in dwelling unitsANA ACCETTAenergy_progress
05/21/2024Fire-Resistant Penetrations and JointsANA ACCETTAspecial
04/24/2024FinalANA ACCETTAprogress
08/22/2023Duct leakage testing, insulation and designXIU CHENenergy_progress
08/22/2023HVAC-R and service water piping design and insulationXIU CHENenergy_progress
08/22/2023HVAC-R and service water heating system controlsXIU CHENenergy_progress
08/22/2023HVAC-R and service water heating equipmentXIU CHENenergy_progress
08/22/2023Maintenance informationXIU CHENenergy_progress
08/22/2023Mechanical SystemsXIU CHENspecial
08/22/2023Fire-Resistant Penetrations and JointsXIU CHENspecial
08/22/2023Tenant Protection Plan ComplianceXIU CHENspecial
08/22/2023FinalXIU CHENprogress
08/22/2023Energy Code Compliance InspectionsXIU CHENprogress
08/17/2023Fire-Resistant Penetrations and JointsXIU CHENspecial
08/17/2023Tenant Protection Plan ComplianceXIU CHENspecial
08/17/2023Sprinkler SystemsXIU CHENspecial
08/08/2023Fire-Resistant Penetrations and JointsXIU CHENspecial
08/08/2023Tenant Protection Plan ComplianceXIU CHENspecial
08/08/2023Energy Code Compliance InspectionsXIU CHENprogress
08/08/2023Lighting controlsXIU CHENenergy_progress
08/08/2023Maintenance informationXIU CHENenergy_progress
08/08/2023Interior lighting powerXIU CHENenergy_progress
▾Documents — 217 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch7
08/29/2026M00915979-S2Request digital key ↗
08/29/2026M00915979-S1Request digital key ↗
08/27/2026M01019831-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/03/2026M00426490-P4Request digital key ↗
09/03/2026M00426490-P3Request digital key ↗
09/03/2026M00426490-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/04/2026M00426474-I1Request digital key ↗
08/15/2026M00426474-P1Request digital key ↗
▸Applications & Permits50
▸BISPLAN / WORK APPROVAL APPLICATION26
06/13/2022121741963Open ↗
06/08/2022121741712Open ↗
06/06/2022121741963Open ↗
Showing 3 of 26 on file for this type
▸BISWORK PERMIT APPLICATION14
05/16/2016122732828Open ↗
07/14/2014121910968Open ↗
07/11/2014121910968Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWLPC Approval/Permit10
09/03/2026M00426490-P4Open ↗
09/03/2026M00426490-P3Open ↗
09/03/2026M00426490-P1Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications51
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
07/01/2016122732828Open ↗
07/01/2016122732828Open ↗
05/16/2016122732828Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/04/2026M00426474-I1Open ↗
09/04/2026M00426474-P1Open ↗
09/03/2026M00426490-P3Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
04/26/2016122732828Open ↗
01/31/2014121905787Open ↗
11/20/2013121842435Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/26/2026M01019830-I1Open ↗
08/26/2026M01019830-I1Open ↗
08/23/2026M00915979-S2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026M01019831-I1Open ↗
08/26/2026M01019830-I1Open ↗
08/23/2026M00915979-S2Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
08/13/2013121741712Open ↗
10/28/2010120507969Open ↗
10/28/2010120507969Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
04/26/2016122732828Open ↗
11/20/2013121842435Open ↗
09/17/2013121741963Open ↗
▸Trade Schedules & Equipment18
▸BISSELF-CERT PLUMBING NOTICE5
10/16/2014121842435Open ↗
08/26/2014121842435Open ↗
08/16/2014121905787Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
04/26/2016122732828Open ↗
02/07/2014121842435Open ↗
02/05/2014121842435Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
07/18/2014121842435Open ↗
11/20/2013121842435Open ↗
10/28/2010120507969Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
09/25/2017121910968Open ↗
02/03/2014121910968Open ↗
▸BISHEATING SYSTEMS1
05/24/2022121910968Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
05/24/2022121910968Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
05/24/2022121910968Open ↗
▸BISSPRINKLER SYSTEMS1
05/23/2022121905787Open ↗
▸Safety & Tenant Protection7
▸DOB NOWTenant Protection Plan6
09/03/2026M00426490-P4Open ↗
09/03/2026M00426490-P3Open ↗
09/03/2026M00426490-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTenant Protection Plan and Notes1
04/26/2016122732828Open ↗
▸Environmental & Asbestos8
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
01/31/2014121905787Open ↗
01/31/2014121905787Open ↗
11/20/2013121842435Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
11/20/2013121842435Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/18/2011120577081Open ↗
▸Energy Compliance14
▸BISAS-BUILT ENERGY ANALYSIS (EN2)5
06/09/2022121741963Open ↗
06/08/2022121741712Open ↗
05/24/2022121910968Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
07/01/2016122732828Open ↗
04/26/2016122732828Open ↗
02/03/2014121910968Open ↗
Showing 3 of 4 on file for this type
▸BISLIGHTING IN DWELLING UNITS1
06/09/2022121741963Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/24/2022121910968Open ↗
▸BIS* HVAC INSULATION AND SEALING1
05/24/2022121910968Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/01/2016122732828Open ↗
▸BISTR8: Energy Code Progress Inspections1
11/18/2013121842435Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/03/2022121741963Open ↗
06/03/2022121741712Open ↗
▸BISMECHANICAL SYSTEMS1
05/24/2022121910968Open ↗
▸Approvals, Objections & Sign-offs20
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
06/14/2022121741963Open ↗
06/10/2022121741712Open ↗
06/02/2022121842435Open ↗
Showing 3 of 9 on file for this type
▸BISLANDMARKS APPROVAL5
04/26/2016122732828Open ↗
03/14/2016120507969Open ↗
07/10/2014121910968Open ↗
Showing 3 of 5 on file for this type
▸BISFINAL3
06/09/2022121741963Open ↗
06/08/2022121741712Open ↗
05/24/2022121910968Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
01/18/2011120577081Open ↗
10/29/2010120507969Open ↗
▸BISLANDMARKS SIGNOFF1
05/24/2022121910968Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT12
07/01/2016122732828Open ↗
04/26/2016122732828Open ↗
03/14/2016120507969Open ↗
Showing 3 of 12 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
06/09/2022121741963Open ↗
06/09/2022121741712Open ↗
06/02/2022121905787Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET9
04/26/2016122732828Open ↗
02/03/2014121910968Open ↗
01/31/2014121905787Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION4
04/11/2017121842435Open ↗
07/01/2016122732828Open ↗
06/30/2014121741963Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
01/16/2018120507969Open ↗
09/25/2017121910968Open ↗
▸Other Documents1
▸BISMAINTENANCE INFORMATION1
05/24/2022121910968Open ↗