| Firm | Filings | Most Recent |
|---|---|---|
| REFORM ARCHITECTURE PLLC | 2 | 02/06/2026 |
| EJZ ENGINEERING | 2 | 12/24/2025 |
| CYCLE ARCHITECTURE, PLLC | 1 | 11/22/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| KNA CONSULTING | 2 | 03/21/2026 |
| JENNY FLORES EXPEDITING | 4 | 03/21/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 02/06/2026 | — | — | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric PLFY-P05NFMU-E 5,000 BTU · Vrf Indoor ×5 SLZ-KF09NA1 7,700 BTU · Vrf Indoor ×3 MXZ-3C30NAHZ4-U1 28,400 BTU · Heat Pump Outdoor ×1 MXZ-3C36NAHZ4-U1 36,000 BTU · Heat Pump Outdoor ×1 SLZ-KF12NA1 10,300 BTU · Vrf Indoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/06/2026 | — | — | 54 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/06/2026 | — | — | Plumbing-Sprinkler, Water/Sanitary |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 01/20/2026 | Structural Steel - High Strength Bolting | — | special |
| 01/20/2026 | Structural Steel - Welding | — | special |
| 01/20/2026 | Concrete - Cast-In-Place | — | special |
| 01/20/2026 | Masonry | — | special |
| 01/20/2026 | Structural Cold-Formed Steel | — | special |
| 01/20/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 01/20/2026 | Structural Steel - Details | — | special |
| 01/19/2026 | Post-installed Anchors | — | special |
| 07/30/2025 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 07/30/2025 | HVAC-R and service water heating equipment | — | energy_progress |
| 07/30/2025 | Ventilation and air distribution system | — | energy_progress |
| 07/30/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 07/30/2025 | Maintenance information | — | energy_progress |
| 07/30/2025 | HVAC-R and service water heating system controls | — | energy_progress |
| 07/30/2025 | Energy Code Compliance Inspections | — | progress |
| 07/24/2025 | Structural Stability – Alterations of existing buildings | — | special |
| 07/15/2025 | Mechanical Systems | — | special |
| 07/15/2025 | Final | — | progress |
| 07/15/2025 | Final | — | progress |
| 11/22/2023 | Permanent certificate | — | energy_progress |
| 11/22/2023 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | — | special |
| 11/22/2023 | Structural Stability – Alterations of existing buildings | — | special |
| 11/22/2023 | Helical Piles Foundation (BB # 2014-020) | — | special |
| 11/22/2023 | Fire-Resistant Penetrations and Joints | — | special |
| 11/22/2023 | Lowest Floor Elevation | — | progress |