← Back
Two family frame
5 KINGSLEY PLACE
STATEN ISLAND · BIN 5164718
💬 Discuss this project
2020Year Built
2Stories
B2Building Class
R3AZoning
—Gross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 0.62 FAR built · Flood zone X
Locations of Work
Electrical
Roof1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OVER DEVELOPMENT903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR305/01/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281305/01/2026
Building Lifecycle
All (26)Filed (3)Permit Issued (2)Signed Off (1)Violation (5)Inspection (5)Special Inspection (10)
05/18/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/06/2026
Signed off — Alteration
Installation of solar panels, rooftop, grid tied, railed, 12 modules, 4.92 KW
S01340175-I1
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
05/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
05/04/2026
Special inspection requirement — Final
Mina Makar
05/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
05/04/2026
Special inspection requirement — Air barrier - visual inspection
Mina Makar
05/01/2026
Filed — Alteration
Installation of solar panels, rooftop, grid tied, railed, 12 modules, 4.92 KW
S01340175-P1
05/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
05/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
05/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
05/01/2026
Special inspection requirement — Final
Mina Makar
05/01/2026
Special inspection requirement — Air barrier - visual inspection
Mina Makar
04/29/2026
Permit issued — Solar
S01377636-I1-SL
03/25/2026
Filed — Alteration
installation of solar panels, rooftop, railed, grid-tied, 12 modules, 4.92 kw
S01377636-I1
12/31/2025
Permit issued — Solar
S01340175-I1-SL
12/26/2025
Filed — Alteration
Installation of solar panels, rooftop, grid tied, railed, 12 modules, 4.92 KW
S01340175-I1
10/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/27/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/15/2020
Violation issued (ECB, closed)
Unknown
04/18/2019
Violation issued (ECB, closed)
Construction
04/18/2019
Violation issued (ECB, closed)
Construction
04/18/2019
Violation issued (ECB, closed)
Construction
04/18/2019
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedMOMENTUM SOLAR04/29/2026
DOB NOWSolarSigned-offMOMENTUM SOLAR12/31/2025
BISPLISSUEDFLOW-RIGHT PLBG & HTG COR02/03/2021
BIS—ISSUEDOVER DEVELOPEMENT LTD11/11/2020
BIS—ISSUEDOVER DEVELOPEMENT LTD01/08/2020
BISEQISSUEDOVER DEVELOPEMENT LTD11/14/2019
BISEQISSUEDOVER DEVELOPEMENT LTD01/07/2019
BIS—ISSUEDOVER DEVELOPEMENT LTD01/07/2019
BISPLISSUEDFLOW-RIGHT PLBG & HTG COR01/02/2019
BIS—ISSUEDOVER DEVELOPEMENT LTD06/19/2018
BIS—ISSUEDOVER DEVELOPEMENT LTD08/17/2017
BISEQISSUEDOVER DEVELOPEMENT LTD08/17/2017
3 projects · most recent 03/25/2026
General Wiring
FiledStatusContractorScope
03/25/2026Permit IssuedISLAND ELECTRIC CORP—
12/26/2025CompleteISLAND ELECTRIC CORP—
02/04/2021CompleteS.T.K. ELECTRICAL CORP.General Wiring
2 projects · most recent 05/01/2026
FiledStatusContractorScope
05/01/2026Signed-offMOMENTUM SOLAR24 panels, 9.84 kw, 211 roof_area_sqft
03/25/2026Permit IssuedMOMENTUM SOLAR12 panels, 4.92 kw, 211 roof_area_sqft
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/18/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/27/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
05/04/2026Fire-Resistant Penetrations and JointsMina Makarspecial
05/04/2026Structural Stability – Alterations of existing buildingsMina Makarspecial
05/04/2026FinalMina Makarprogress
05/04/2026Energy Code Compliance InspectionsMina Makarprogress
05/04/2026Air barrier - visual inspectionMina Makarenergy_progress
05/01/2026Fire-Resistant Penetrations and JointsMina Makarspecial
05/01/2026Structural Stability – Alterations of existing buildingsMina Makarspecial
05/01/2026Energy Code Compliance InspectionsMina Makarprogress
05/01/2026FinalMina Makarprogress
05/01/2026Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026S01340175-P1Request digital key ↗
08/17/2026S01340175-I1Request digital key ↗
08/17/2026S01377636-I1Request digital key ↗
▸Applications & Permits23
▸BISWORK PERMIT APPLICATION11
02/03/2021520366737Open ↗
01/09/2020520202450Open ↗
11/19/2019520202450Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION11
04/06/2021520202450Open ↗
03/24/2021520366737Open ↗
03/24/2021520202450Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/04/2020520202450Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISRESTRICTION: EASEMENT AGREEMENT1
03/22/2021520202450Open ↗
▸BISVERIFY TAX LOT1
08/12/2021520202450Open ↗
▸BISTAX LOT- FINAL LOT NUMBER ISSUED1
10/15/2014520209925Open ↗
▸BISZONING DIAGRAM1
11/18/2014520202450Open ↗
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT1
08/29/2014520202450Open ↗
▸Seals & Professional Certifications17
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
08/22/2017520202450Open ↗
11/17/2014520202450Open ↗
11/17/2014520202450Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026S01340175-I1Open ↗
08/29/2026S01340175-I1Open ↗
08/26/2026S01340175-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026S01340175-P1Open ↗
08/17/2026S01377636-I1Open ↗
08/13/2026S01340175-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
01/04/2019520366737Open ↗
10/15/2014520209925Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/04/2019520366737Open ↗
10/15/2014520209925Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026S01340175-I1Open ↗
08/26/2026S01340175-P1Open ↗
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING4
04/06/2021520202450Open ↗
03/24/2021520202450Open ↗
03/23/2021520366737Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
01/04/2019520366737Open ↗
12/10/2014520202450Open ↗
10/15/2014520209925Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
08/12/2021520202450Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
03/09/2021520202450Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
03/09/2021520202450Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
01/04/2019520366737Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
11/17/2014520202450Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST1
12/05/2014520202450Open ↗
▸BISSTREET TREE SIGNOFF1
08/12/2021520202450Open ↗
▸BISSTREET TREES SITE PLAN1
02/24/2021520202450Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
08/22/2017520202450Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026S01340175-P1Open ↗
08/13/2026S01340175-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/22/2017520202450Open ↗
08/29/2014520202450Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/16/2021520202450Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/16/2021520202450Open ↗
▸Inspections & Test Reports6
▸BISHYDRO FLOW TEST LETTER2
01/04/2019520366737Open ↗
10/15/2014520209925Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/16/2021520202450Open ↗
▸BISSoil Report1
11/17/2014520202450Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
10/15/2014520209925Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
08/12/2021520202450Open ↗
▸Approvals, Objections & Sign-offs6
▸BISADMINISTRATIVE OBJECTIONS3
01/04/2019520366737Open ↗
10/15/2014520209925Open ↗
08/29/2014520202450Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/05/2021520366737Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
08/29/2014520202450Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026S01340175-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
01/04/2019520366737Open ↗
10/15/2014520209925Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/05/2021520366737Open ↗
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET3
01/04/2019520366737Open ↗
10/15/2014520209925Open ↗
08/29/2014520202450Open ↗
▸BISADDITIONAL INFORMATION3
03/22/2021520202450Open ↗
02/26/2021520202450Open ↗
11/18/2014520202450Open ↗
▸BISBOROUGH INTAKE FORM1
02/03/2021520366737Open ↗