Predominantly retail with other uses
5 LISPENARD STREET
MANHATTAN · BIN 1002724
💬 Discuss this project
1915Year Built
3Stories
K4Building Class
C6-2AZoning
4,775 sfGross Floor Area
4Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: 5 LISPENARD OWNER LLC · 1,500 sf lot · 3.18 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Floor 21p · 1 filing · 20 docs
Floor 19p · 2 filings · 20 docs
Cellar8p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PENN SOUTH CAPITAL MANAGEMENT2007/08/2026
ACE GROUP NY407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/21/2025$3.5M—TRIBECA PORTFOLIO LLC → 5 LISPENARD OWNER LLC$733/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PRAMODRAY SHAH, P.E.308/13/2026
SHAHRISH SHUVO ENGINEERING P.C.305/06/2026
CPENGINEERING PC304/02/2025
VOLUME SPACE CONSULTING INC.104/01/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO203/21/2026
PENN SOUTH CAPITAL MANAGEMENT803/21/2026
CASA GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EXCLUSIVE CARPENTRY INCGeneral Contractor807/08/2026
ACE GROUP NY CORPGeneral Contractor107/08/2026
CLEAN TECH MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524808/13/2026
Building Lifecycle
All (76)Filed (10)Permit Issued (8)Signed Off (4)Violation (3)Inspection (7)Objection (14)Special Inspection (30)
08/13/2026
Filed — Alteration CO
This application is being filed to change of use of the cellar and first floor.
M01260237-P2
08/11/2026
Special inspection requirement — Lighting controls
Shahrish Shuvo
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
08/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
08/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
07/15/2026
Signed off — Alteration
application is being filed for the removal of interior partitions, per plans submitted herewith. No change in use, egress or occupancy in this application.
M01204247-I1
07/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
07/14/2026
Special inspection requirement — Lighting controls
Shahrish Shuvo
07/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
07/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
06/24/2026
Filed — Alteration CO
This application is being filed to change of use of the cellar and first floor.
M01260237-P1
06/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
06/18/2026
Special inspection requirement — Lighting controls
Shahrish Shuvo
06/18/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
06/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
05/19/2026
Signed off — Alteration
This application is being filed for plumbing work at the subject premises per plans submitted herewith. No change in use, egress or occupancy in this building.
M01198592-I1
05/06/2026
Filed — Alteration
This application is being filed for plumbing work at the subject premises per plans submitted herewith. No change in use, egress or occupancy in this building.
M01198592-P3
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
05/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
05/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
05/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
05/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
05/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
05/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
05/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
05/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
04/24/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/17/2026
Filed — Alteration
This application is being filed for plumbing work at the subject premises per plans submitted herewith. No change in use, egress or occupancy in this building.
M01198592-P2
03/17/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/10/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/02/2026
Violation issued (FDNY_NOV, closed)
02/10/2026
Signed off — Alteration
M01194759-I1
02/10/2026
Signed off — Alteration
This application is being filed for mechanical work at the subject premises per plans submitted herewith. No change in use, egress or occupancy in this application.
M01198035-I1
02/05/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/27/2026
Permit issued — General Construction
M01260237-I1-GC
01/22/2026
Objection resolved — Addressed
01/07/2026
Objection resolved — Addressed
12/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/09/2025
Objection resolved — Addressed
10/24/2025
Objection raised — Structural
09/30/2025
Objection resolved — Addressed
09/30/2025
Objection resolved — Addressed
09/30/2025
Objection resolved — Addressed
09/30/2025
Objection resolved — Addressed
09/29/2025
Objection raised — Structural
09/29/2025
Objection raised — Structural
09/29/2025
Objection raised — Zoning
09/29/2025
Objection raised — Zoning
08/21/2025
Objection raised — Structural
08/21/2025
Objection raised — Structural
07/25/2025
Filed — Alteration CO
This application is being filed to change of use of the cellar and first floor.
M01260237-I1
07/10/2025
Permit issued — General Construction
M01194759-I1-GC
07/10/2025
Permit issued — Mechanical Systems
M01198035-I1-MS
06/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/20/2025
Permit issued — Plumbing
M01198592-I1-PL
05/09/2025
Permit issued — Mechanical Systems
M01198035-I1-MS
05/09/2025
Permit issued — General Construction
M01194759-I1-GC
04/09/2025
Permit issued — General Construction
M01204247-I1-GC
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedEXCLUSIVE CARPENTRY INC01/27/2026
DOB NOWGeneral ConstructionSigned-offEXCLUSIVE CARPENTRY INC07/10/2025
DOB NOWMechanical SystemsSigned-offEXCLUSIVE CARPENTRY INC07/10/2025
DOB NOWPlumbingSigned-offCLEAN TECH MECHANICAL INC05/20/2025
DOB NOWMechanical SystemsSigned-offEXCLUSIVE CARPENTRY INC05/09/2025
DOB NOWGeneral ConstructionSigned-offEXCLUSIVE CARPENTRY INC05/09/2025
DOB NOWGeneral ConstructionSigned-offEXCLUSIVE CARPENTRY INC04/09/2025
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP04/01/2025
BISEQISSUEDSUN SUN CONSTRUCTION INC01/12/1998
BISPLISSUEDCHINATOWN PLBG & HTG INC12/19/1997
BISPLISSUEDALJER PLBG & HTG CORP11/18/1997
BIS—ISSUEDSUN SUN CONST. INC08/08/1997
BISEQISSUEDMETROPOLIS CONSTRUCTION CORP.08/08/1997
1 project · most recent 05/06/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/06/2026Signed-offCLEAN TECH MECHANICAL INCGas, Water/Sanitary
2 projects · most recent 05/15/2026
General Wiring
FiledStatusContractorScope
05/15/2026Permit IssuedKINGS ELECTRIC CO., INC.3 meters, 1 new_meters
05/21/2025CompleteKINGS ELECTRIC CO., INC.General Wiring
1 project · most recent 04/01/2025
Sidewalk Shed
FiledStatusContractorScope
04/01/2025Permit IssuedACE GROUP NY CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/24/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/17/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/10/2026Fail-Final CND-Occupancy InspectionFailView ↗
02/05/2026Fail-Final CND-Occupancy InspectionFailView ↗
12/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
08/11/2026Lighting controlsShahrish Shuvoenergy_progress
08/11/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
08/11/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
08/11/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
07/14/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
07/14/2026Lighting controlsShahrish Shuvoenergy_progress
07/14/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
07/14/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
06/18/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
06/18/2026Lighting controlsShahrish Shuvoenergy_progress
06/18/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
06/18/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
05/06/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
05/06/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
05/06/2026HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
05/06/2026HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
05/06/2026HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
05/04/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
05/04/2026HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
05/04/2026HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
05/04/2026HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
05/04/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
03/24/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
03/24/2025Fire-Resistance Rated ConstructionShahrish Shuvoprogress
03/24/2025Energy Code Compliance InspectionsShahrish Shuvoprogress
Latest 25 of 30.
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/24/2026M01194759-I1Request digital key ↗
08/24/2026M01202070-I1Request digital key ↗
08/24/2026M01204247-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026M01194759-I1Open ↗
08/29/2026M01198592-P3Open ↗
08/29/2026M01198592-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/24/2026M01202070-I1Open ↗
08/22/2026M01260237-P1Open ↗
08/22/2026M01260237-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026M01194759-I1Open ↗
08/29/2026M01198592-P3Open ↗
08/27/2026M01260237-P2Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/22/2026M01260237-P1Open ↗
08/22/2026M01260237-P2Open ↗
08/14/2026M01260237-I1Open ↗
▸Environmental & Asbestos23
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/22/2026M01260237-P2Open ↗
08/22/2026M01260237-P1Open ↗
08/17/2026M01198592-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWOER: Notice of Satisfaction7
08/22/2026M01260237-P2Open ↗
08/17/2026M01198592-I1Open ↗
08/14/2026M01260237-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice to Proceed7
08/22/2026M01260237-P2Open ↗
08/17/2026M01198592-I1Open ↗
08/13/2026M01194759-I1Open ↗
Showing 3 of 7 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/22/2026M01260237-P1Open ↗
08/22/2026M01260237-P2Open ↗
08/14/2026M01260237-I1Open ↗